all experimenters meeting n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
All Experimenters’ Meeting PowerPoint Presentation
Download Presentation
All Experimenters’ Meeting

Loading in 2 Seconds...

play fullscreen
1 / 5

All Experimenters’ Meeting - PowerPoint PPT Presentation


  • 100 Views
  • Uploaded on

All Experimenters’ Meeting. October 10, 2011. Accelerator Operation Summary . From : October 03, 2011 (0000 hours) To: October 10, 2011 (0000 hours). Calendar Week # 40 NuMI Weekly Integrated Intensity 7.59E18 protons

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'All Experimenters’ Meeting' - trish


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
accelerator operation summary
Accelerator Operation Summary

From : October 03, 2011 (0000 hours)

To: October 10, 2011 (0000 hours)

Calendar Week # 40

NuMI Weekly Integrated Intensity 7.59E18 protons

BNB Weekly Integrated Intensity 5.25e18 protons

MTest Weekly Integrated Intensity 8.08e13 protons

Recorded Downtime 69.52 hours

status work completed plans
Status /Work Completed/Plans
  • Proton Source
    • LRF1&2 tank vacuum leak repaired.
    • LRF5 PA replacement
    • Removal of BRF8 cavity.
    • PA replacement on 3 BRF stations
    • Booster Safety system tests
  • Main Injector
    • ANU pre-shutdown jobs.
    • Safety system tests .
    • $23 ramp length changed on Thursday
      • 2.06 Second Rep rate in MI
  • Pbar
    • Terminated final Pbars on Friday Oct. 7 @ 1117.
    • Valved out EQ923 due to LCW leak.
  • NuMI
    • Target moved to LE10
  • MiniBooNE
    • MI12 AC unit will be installed when it arrives.
  • MTA
    • Investigating breaker trips affecting cryo-compressors