CALO Commissioning Activities. 22 June 2009. Pascal Perret LPC Clermont. A ctivities in the cavern : Last Access!. ECAL: Integrator boards re-installation and last checks: ~1 day/side: A-side: June 19-22 done C-side: July 1-2 ? HCAL : L ast checks: ~1 day/side:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CALO Commissioning Activities' - topaz


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
calo commissioning activities

CALOCommissioningActivities

22 June 2009

Pascal Perret

LPC Clermont

a ctivities in the cavern last access
Activities in the cavern: Last Access!
  • ECAL:
    • Integrator boards re-installation and last checks:
      • ~1 day/side:
        • A-side: June 19-22 done
        • C-side: July 1-2 ?
  • HCAL:
    • Last checks:
      • ~1 day/side:
        • A-side: June 26-29 2pm
        • C-side: June 29-30

Pascal Perret - LPC Clermont

a ctivities in the cavern last access1
Activities in the cavern: Last Access!
  • PS:
    • LV patch panel exchanged: June 29 (A-side)-30(C-side)
    • VFE electronics maintenance:
      • A-side: June 29-30
      • C-side: July 1
  • PS/SPD:
    • LED tuning C-side? No news from Evgueni …
    • Survey & alignment: July 2-3
  • Detector closing & survey: July 6-10 (according to M1)
  • Turbines exchanged …
    • By groups of 3 (3 spares!): 3/day ?

Pascal Perret - LPC Clermont

planning
Planning
  • DCS shouldbeready (in action!) as soon as possible …