An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Orange Cake Problem Answer Guide MGT3303 – Operations Management

  2. Questions • Assuming you work alone and follow the instructions above, how long will it take you to bake the cake? Is there any obvious way to shorten the preparation time? • Assume that two people are available, how fast can the cake now be prepared? • Categorise activity as follows: process, cook, cool. How much time is spent on each category? • What type of technology could be used to shorten the preparation time? Distinguish these improvements which do not impact quality of the cake from those that do. • If you were commercialise this cake at a large scale, how would you design the facilities and work to achieve maximum efficiency and volume? MGT3303 – Operations Management

  3. Question 1 Assuming you work alone and follow the instructions above, how long will it take you to bake the cake? Is there any obvious way to shorten the preparation time? MGT3303 – Operations Management

  4. Question 1 • The problem is to apply the recipe instructions on a timeline • This does not mean adding all the elementary times!! • You have to take advantage of idle times: • When the cake is baking, start preparing the curd • When the orange slices are being poached, start preparing the mix • But you have to respect sequential dependencies • You cannot pour the mix before the orange slices are positioned… MGT3303 – Operations Management

  5. Solution • You should find 153 minutes • minor variations (1 to 3 mn) are not much to worry about • Major variations (+ 5mn) should be analysed MGT3303 – Operations Management

  6. The First 63 Minutes • Getting the cake ready to bake MGT3303 – Operations Management

  7. The Middle 45 Minutes • Cake is Baking • Start preparing the curd MGT3303 – Operations Management

  8. The Last 45 Minutes MGT3303 – Operations Management

  9. Question 2 Assume that two people are available, how fast can the cake now be prepared? MGT3303 – Operations Management

  10. Horizontal Division of Labour • By dividing “similar” tasks (whisk/strain/mix) between several persons, it is possible to compress processing times • Overall time gets down to 147 minutes – only a 6 minutes gain in time! MGT3303 – Operations Management

  11. Question 3 Categorise activity as follows: process, cook, cool. How much time is spent on each category? MGT3303 – Operations Management

  12. Time Distribution • Why this question? • To better understand where time is spent • To identify where time reduction efforts should be focused MGT3303 – Operations Management

  13. Question 4 What type of technology could be used to shorten the preparation time? Distinguish these improvements which do not impact quality of the cake from those that do. MGT3303 – Operations Management

  14. Time Improvements • Three categories: • Technology input • Use tools and devices which increase output • Cooling Time • Question whether or not they are necessary? • Human Specialisation • When you prepare the cake several times, tasks which are originally difficult (e.g. slicing the cake in 3) become easy • Concept of a learning curve MGT3303 – Operations Management

  15. Technology Input • Oven • A fan oven cooks slower but more evenly • With a conventional oven, cooking time could be brought down to 35 mn • This may have a negative impact on quality? • Puree Preparation • The hand mortar process is tedious • A hand blender does the job better and quicker ( 1 mn instead of 10) MGT3303 – Operations Management

  16. Cooling Times • Poached Orange Slices • It is difficult to manipulate the slices when they are hot • But it is feasible with a skilled used of a spatula! • The puree can be blended hot • So, cooling time can be brought down to 2 mn MGT3303 – Operations Management

  17. Cooling Times • Cake • It is difficult to cut the cake when it is straight hot out of the oven • Again, experiencing with knifes and how to hold the cake means it is possible to slice the cake when it is still warm. • Reduce the cooling time from 20 mn to 10 mn MGT3303 – Operations Management

  18. Cooling Times • Curd • A bit too “runny” when hot, and tends to spread out too fast at the sandwiching time • Cooling time can be reduced to 10 mn, but not much more! MGT3303 – Operations Management

  19. Learning Curves • Once the operator is skilled, elementary times are reduced • Note: this works well only when tasks are repeated a large number of time (division) • Slicing the oranges: 2mn • Mix for poaching: 1 mn • Whisk eggs+sugar: 3 mn • Mix dry mix + puree: 2 mn • Grate: 3 mn • Straining poached oranges: skipped altogether as by selecting the right slices and letting the drip a bit save adding liquid later on • Cut the cake in 3: 2 mn • Brush: 3 mn • Sandwich: 3 mn • Top: 1 mn MGT3303 – Operations Management

  20. New Process Times • The cake can now be prepared in 86 mn • Better use of parallel processing! MGT3303 – Operations Management

  21. Question 5 If you were commercialise this cake at a large scale, how would you design the facilities and work to achieve maximum efficiency and volume? MGT3303 – Operations Management

  22. Suggested Layout MGT3303 – Operations Management

  23. Why this layout? • Use existing “process centres” between cooking and cooling operations • Note that each of these process centres demand about 10 minutes of work • The curd preparation station takes 10 minutes with 1 worker (per cake) • The finishing station also demands 10 mn / cake • The mix preparation demands 11 mn at two people – shift the tin preparation, layout slices to the poached orange station • Make sense: do not carry the slices • The poached orange station is under-loaded MGT3303 – Operations Management

  24. Output? • With this staffing level: • Output is one cake every 10 minutes, or 6 cakes per hour, or 48 cakes a day for an 8 hour working day • For a belt speed of 1 m/mn for the oven conveyor: • Cooking time is 35 mn – so length is 3.5 m • A cake is loaded/emptied every 10 mn • Plenty of space! (only 3.5 cakes in the oven) • 48 cakes per day is not much! • We are a very, very long way from mass production • How could you improve this output? MGT3303 – Operations Management

  25. Increasing Output • By applying further the principle of horizontal division of labour: • More operators for more elementary tasks • See assembly line design • Automation • More technology inputs • Special tools, cooking and cooling technology MGT3303 – Operations Management