2007 Greater MN Combined Solicitation for Federal Funds Part 2. Combined Solicitation Timeline (Appendix H in Final Announcement). November 21st – December 31st

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '2007 Greater MN Combined Solicitation for Federal Funds Part 2' - tiger


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
combined solicitation timeline appendix h in final announcement
Combined Solicitation Timeline(Appendix H in Final Announcement)

November 21st – December 31st

In November, a letter of notification will be sent to all eligible agencies. Agencies should submit their crash requests to Mn/DOT as soon as possible. Requests made after Dec 31st may be significantly delayed due to limited resources.

November/December/January

Each eligible agency selects project(s) and compiles a solicitation packet based on the criteria guidelines. Any agency that disputes the results of their crash data requests can contact Mn/DOT to reconcile those differences.

February 1, 2008

Solicitation packets should be submitted to Mn/DOT Office of Traffic, Safety and Operations no later than February 1, 2008.

Continued on next slide

combined solicitation timeline appendix h in final announcement1
Combined Solicitation Timeline(Appendix H in Final Announcement)

February 4th – February 22nd

Mn/DOT Office of Traffic, Safety and Operations reviews each solicitation packet for compliance with HSIP criteria guidelines. A preliminary list of proposed projects is developed and ranked.

February 25th – March 7th

If any significant changes to a solicitation packet are determined during the review process, Mn/DOT will work with the submitting agency to reconcile these differences. A revised list of proposed projects is then compiled and prioritized. This list, along with the solicitation packets, is given to the Mn/DOT Selection Committee for review and approval. The selection committee is comprised of: Representatives from Mn/DOT Office of Traffic, Safety and Operations, Mn/DOT State Aid for Local Transportation, and the FHWA.

Continued on next slide

combined solicitation timeline appendix h in final announcement2
Combined Solicitation Timeline(Appendix H in Final Announcement)

March 10th – March 21st

Area Transportation Partners (ATP)/ Districts including District Traffic Engineers are given the list of proposed projects, as well as the solicitation packets, for their concurrence.

March 24th – April 15th

District Planners revise their ATIP to include selected HSIP and HRRRP projects.

March 24th – April 15th

Notification is sent to applicants announcing selected projects.

proactive projects continued
Proactive Projects - continued
  • Consult SHSP Report Priority list by County (Appendix IV) – Pennington County
      • Reduce run-off road Crashes on two-lane undivided local roadways
proactive projects continued1
Proactive projects - continued
  • Consult MnCMAT to identify corridors that meet these criteria
proactive projects continued2
Proactive projects - continued
  • MnCMAT did not identify corridors on the local road system that had a pattern of run-off the road crashes
  • Develop a prioritization system based on ADT
  • Call OTSO (before December 31) to run a ADT report for your county to find the greatest opportunity for deploying safety measures
slide10

Proactive projects - continued

  • Data sorted by CSAH, with ADT greater than 500 and had crashes in the last 10 years
  • Countermeasure: Utilize centerline rumble strips on undivided, two-way roads with ADT greater than 500
proactive projects continued3
Proactive projects - continued
  • Estimate Project Cost
  • Check: Is this roadway segment on the HRRRP list?
  • Check: Is this roadway segment on the Top 5% list?
  • Assemble ADT data
  • Assemble final Crash data
  • Fill out application
slide13

Reactive projects – Continued

  • Estimate project Cost
  • Calculate Benefit-Cost Ratio
  • Use 3 years crash data 2004-2006, all crashes
  • Must have B/C >1 to be considered for funding
  • Use MnCMAT to identify project sites
slide14

Reactive projects – Continued

  • Request FINAL crash data from OTSO (before December 31)
  • Verify B/C using final crash data
  • Include project plan or preliminary layout/scope of work
  • Assemble ADT data
  • Check: Is this roadway segment on the HRRRP list?
  • Check: Is this roadway segment on the Top 5% list?
  • Complete Application
slide15

Joint Application Form(Page 1)

Everyone fills out this page

slide16

Joint Application Form(Page 1 – Top)

If you provide your email address, I will send you a confirmation that your application was received.

Please designate a program year.

You must agree to maintain the project.

slide17

Joint Application Form(Page 1 – Middle)

Already have proactive strategies in place? List them here.

slide18

Joint Application Form(Page 1 – Bottom)

This is to streamline the environmental review process and the historical site review.

slide19

Joint Application Form(Page 2)

For PROACTIVE projects ONLY

slide20

Joint Application Form(Page 2 – Top)

RANKING CRITERIA

RANKING CRITERIA

slide22

Joint Application Form(Page 2 – Bottom)

RANKING CRITERIA

RANKING CRITERIA

slide23

Joint Application Form(Page 3)

For REACTIVE projects ONLY

slide26

Joint Application Form(Page 3 – Bottom)

Questions:

Dave Engstrom

Dave.Engstrom@dot.stae.mn.us

651-234-7016

Mark Vizecky

Mark.Vizecky@dot.state.mn.us

651-366-3839

Julie Whitcher

Julie.Whitcher@dot.state.mn.us

651-234-7019