1 / 7

MAE 576 Final Project CD Sorter with Database

MAE 576 Final Project CD Sorter with Database. Presented by: Matt “ICU” Szymanski Nicholas “PBasic” Gill. Motivation. Examine communication between two Basic Stamps Multiple burns, or burns from multiple disks are tedious, and time consuming.

thyra
Download Presentation

MAE 576 Final Project CD Sorter with Database

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAE 576 Final ProjectCD Sorter with Database Presented by: Matt “ICU” Szymanski Nicholas “PBasic” Gill

  2. Motivation • Examine communication between two Basic Stamps • Multiple burns, or burns from multiple disks are tedious, and time consuming. • Same setup could be used for precise integral motion with a feedback loop

  3. Two robots- one for control, one for database Data transfer though IR and cable. Mechanical system constrains the motion of the BOEbot for precise motion. BOEbot moves to disk, uses servo motor to skewer CD, and returns. LCD screen shows the user the location of the BOEbot. Synopsis

  4. Physical Layout of Project

  5. Software Program Flow • Both stamps initialize- BOEbot goes home • BOEbot sends “home”, Base sends CD # • BOEbot sends update to base -> retrieves • Base Displays on LCD- Listens • CD is in “computer,” Base sends CD new # • BOEbot sends update -> returns old CD • BOEbot sends update -> retrieves new • At the end program- LCD displays all done

  6. Communications- IR, Cable • Infra Red • Firestick II • Module emits serially using SEROUT command • Wait “A” command • Cable • grounds connected • flow control PIN to signal receiving stamp is ready

  7. Successes accurate control using pushbutton switches Communication is reliable and robust CD grabber is consistent Future Studies Add CD eject button on BOEbot Serial Comm. between base and computer Avoid going back to home every trip Re-ordering CD’s while playing Successes and Future Studies

More Related