prototestdirector integration in the mogentes framework status of work n.
Download
Skip this Video
Download Presentation
ProtoTestDirector Integration in the MOGENTES Framework Status of work

Loading in 2 Seconds...

play fullscreen
1 / 4

ProtoTestDirector Integration in the MOGENTES Framework Status of work - PowerPoint PPT Presentation


  • 57 Views
  • Uploaded on

ProtoTestDirector Integration in the MOGENTES Framework Status of work. Lorenzo Fantesini – RE:Lab srl – l.fantesini@re-lab.it Massimiliano Pavesi – RE:Lab srl – m.pavesi@re-lab.it. Import XML Testcase – RNC Format. ProtoTest Director Integration. Import Xml Testcase Using RNC Format

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'ProtoTestDirector Integration in the MOGENTES Framework Status of work' - thom


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
prototestdirector integration in the mogentes framework status of work

ProtoTestDirector Integration in the MOGENTES FrameworkStatus of work

Lorenzo Fantesini – RE:Lab srl – l.fantesini@re-lab.it

Massimiliano Pavesi – RE:Lab srl – m.pavesi@re-lab.it

prototest director integration
ProtoTest Director Integration
  • Import Xml TestcaseUsing RNC Format
    • The Import functionisavailable and working
  • Adapt the PTD to the MogentesRequirements:
    • PTD isabletomanipulateonlycontrollablevariables and timetriggered
    • The “Mogentes” PTD willbeabletohandlebothcontrollable and observablevariables, time-triggered, event-triggered and “response-triggered” (wait a responsefrom the ECU asindicated in ISOBUS Standards)
  • We are currentlydevelopingtheseaspects