Project Name: Red Rock Elementary School

Red Rock Elementary School. Project Name: Red Rock Elementary School. 2009 Monarch Award. City, State: Red Rock, Arizona School Type: Elementary School, K-8 Construction Type: CM@Risk Submitting Firm: SPS+ ARCHITECTS LLP. Red Rock Elementary School. Red Rock Elementary School.

theis
Download Presentation

Project Name: Red Rock Elementary School

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Red Rock Elementary School Project Name:Red Rock Elementary School 2009 Monarch Award City, State: Red Rock, Arizona School Type: Elementary School, K-8 Construction Type: CM@Risk Submitting Firm: SPS+ ARCHITECTS LLP Red Rock Elementary School

  2. Red Rock Elementary School Red Rock Elementary Main Entry. Red Rock Elementary School Page-1

  3. Red Rock Elementary School The main lobby with the Administration is separated into a public space, school population area & administration staff space. Red Rock Elementary School Page-2

  4. Red Rock Elementary School Community Entrance to Library. Red Rock Elementary School Page-3

  5. Red Rock Elementary School Library with community access separate from school access and special reading area. The Library also feature plentiful windows for day lighting. Red Rock Elementary School Page-4

  6. Red Rock Elementary School Full Gymnasium with 2 side courts. Red Rock Elementary School Page-5

  7. Red Rock Elementary School Dual serving line Cafeteria. Red Rock Elementary School Page-6

  8. Red Rock Elementary School Typical classroom wing courtyard entry. Red Rock Elementary School Page-7

  9. Red Rock Elementary School Typical Classroom. Red Rock Elementary School Page-8

  10. Red Rock Elementary School Typical group restroom Red Rock Elementary School Page-9

  11. Red Rock Elementary School Aerial View with Arizona landmark Picacho Peak in background Red Rock Elementary School Page-10

  12. Site Plan Red Rock Elementary School BLDG 400 4 5 1 BLDG 100 8 BLDG 300 3 BLDG 200 HOMESTEAD RD 6 2 7 SPIRIT LANE 1. Auditorium Building with Play Area 2. Grades 1-4 Classroom Building with Play Area. 3. Gymnasium/Cafeteria Building. 4. Grades 5-8 Classroom Building with Play Area. 5. Visitor Parking with Pick up/Drop off 6. Bus Lane with Staff Parking 7. Overflow Pick up/Drop off 8. Play Fields RED ROCK SCHOOL 0’ 50’ 100’ 200’ Red Rock Elementary School Page-11

  13. Red Rock Elementary School 21 1 1 22 18 1 1 16 1 1 14 20 1 19 17 1 1 3 1 15 1 1 10 1 1 1 1 14 1 1 1 1 1 • Classroom • Kindergarten • Computer Room • Science • Math • Language • Art • Social Studies 9. Consumer Science 10. Special Needs 11. Media Center 12. Administration 13. Nurse 14. Teacher Workroom 15. Teacher Resource 16. Kitchen 17. Cafeteria 18. Gymnasium 19. Meeting Room 20. Instrument Room 21. Tech 2000 22. Stage Floor Plan 7 9 4 8 4 8 14 5 1 5 3 6 15 6 1 10 1 1 2 2 2 2 2 2 1 1 14 1 11 12 1 13 1 1 1 Red Rock Elementary School Page-12

  14. Project Narrative • When a major developer proposed a master planned community in Red Rock Arizona, the superintendent (who knows every student’s name) of the small cattle ranching community between Tucson and Phoenix, was suddenly overwhelmed with what lied ahead. The design and construction team was created and given one main goal: to maintain the schools’ tradition of “No Cracks in Red Rock”. This was further defined to build a school that will stand the test of time, providing optimum learning spaces for the students comprising of good air quality, lighting, acoustics and the latest technology. • With an extremely tight budget, our team generated a listing of priorities to help establish what must be built now, what could be added in the future and during the construction process, to take advantage of ongoing value engineering opportunities. Our team was also challenged with a rigorous schedule to beat the rush of new community members as well as a moratorium on state funded schools. • We started with special programming workshops including district leadership, staff, teachers and long standing community members. We provided planning booklets as feedback at the following phases: Program (with education specifications), Schematic Design (with renderings, examples of materials selections and a site specific mechanical system comparison including a gas vs. electric comparison) and Design Development (with outline specifications and a construction cost estimate). • The recently occupied school is a wonderful example of great team work, functional, efficient (maximize classroom space and minimizing classroom student sizes), high quality design, and construction. This school provides a comfortable environment for students with clear and controlled entrances, roomy corridors and a strong school identity (through the use of control joints and paint schemes). This 97,020 square foot, four building campus style school for 1,050 students includes the following programmatic elements: Red Rock Elementary School Red Rock Elementary School Page-13

  15. Red Rock Elementary School • Classroom Buildings, Two separate wings – Primary and Intermediate grades: Typically 5 spacious classrooms per grade with two windows in each room with classroom connecting doors, teacher work room and one ¼ size “pull out” resource rooms per two grades, special education spaces, a computer lab per classroom wing, specialized classrooms (Science and Art) for 7th and 8th grades. • Gym/Cafeteria/Kitchen Building, located between classroom wings and play areas: The kitchen is designed for max capacity in minimal time periods comprising of two separate serving lines. The Cafeteria is separate from the Gym (with stage capable of serving as a classroom) and they share a lobby. There is also a spacious exterior plaza with trees providing outdoor socializing and socializing. Full gymnasium with space for retractable bleachers and two side courts. • Administration/Kindergarten Building (Centrally located): Kindergarten is planned for all day and has a separate play space with an exterior classroom sized covered area and a grass area sized for two classrooms. Main entrance to the administration provides for a public side and private side. The Library is spacious and has a separate community entrance as well as a large plaza for gathering. • Site Design: Special coordination was required with the community developer for the school site, road and utilities locations. We provided a separate bus drop off from parent pickup and drop off and included ample overflow pickup/drop off area. • Technology: We included the technology designer early on to integrate the infrastructure to include the following: Media delivery, CCTV, Card Readers, WiFi, smart boards, etc. Redundancy was critical component to the safety and emergency response systems (telephone, fire alarm, and intercom). • Materials/Elements: • -Roof - Wood structure, R-30 insulation, 20 year single ply APP membrane. • -Walls - Metal studs, R19 insulation and stucco with CMU wainscot near pedestrian areas at the administration and classroom buildings; Painted CMU at the Gym, Cafeteria and Kitchen. • -HVAC - High efficient rooftop package units with programmable t-stats. • -Lighting - Occupancy sensors, energy efficient lamps, dual pane glazing. • -Landscaping – minimized turf areas, maximized xeriscape utilizing reclaimed water for all irrigation. Red Rock Elementary School Page-14

  16. Project Budget Red Rock Elementary School Project Location Total Budget Building Size SF Cost/SF $ A/E FEE Final Cost Completion Red Rock Elementary School Red Rock Arizona $13,200,000 97,020 $707,686 $12,590,811 $129.78 On Schedule Red Rock Elementary School Page-15

  17. Project Name Red Rock Elementary School City Red Rock State  Arizona District Name Red Rock Elementary School (District #5) Mark Brauner Supt Occupancy Date December 2008 K-8 Grades Housed Capacity(Students) 1050 15.85 Acres Site Size (acres) Gross Area (sq. ft.) 97,020 SF Per Occupant(pupil)  92.4 SF/Pupil Gross. gross/net please indicate Design and Build? Yes If yes, Total Cost: $12,590,811 Includes: Construction Cost If no, Site Development: Building Construction: Fixed Equipment: Other: Total:  $ 12,590,811 Project Details Red Rock Elementary School Red Rock Elementary School Page-16