230 likes | 286 Views
Established in 1979, McLendon Enterprises focuses on transportation projects, CDBG projects, and more in GA. Explore our current and past projects, innovative technology, and dedication to integrity and quality.
E N D
COMPANY PORTFOLIIO MCLENDON ENTERPRISES FOOTPRINT IN GA.
OFFICE LOCATIONS Main Office 2365 Aimwell RoadVidalia, GA 30474 (912) 537-7887 Savannah Office 9 Chatham Pkwy. S. Dr. Suite B-2 Savannah, GA 31405 (912) 349-0677
MISSION STATEMENT McLendon Enterprises Inc. and its employees share the same goals of integrity, quality, teamwork, safety and continuous improvement in each and every project. MEET THE TEAM
BACKGROUND McLendon Enterprises was incorporated in 1979 at which time the leadership role was then taken over by current President / Owner, Benny McLendon Contract Revenue Earned 2011: $ 33,457,474.00 2012: $ 46,660,631.00 *Number Of Permanent Employees* 2010: 93 2011: 112 2012: 130 2013: 140
ON THE HORIZON Transportation Projects Georgia Department of Transportation CDBG Projects City Streets / Roadway Utility Installations Water Storm Sewer / Force main / Pump stations Other Projects Subdivisions Treatment Plants Design Builds
PROJECTS COMPLETED WITHIN PAST TWO YEARS OVER $ 1,000,000.00
BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY 3D-GPS, 3D-MILLIMETER GPS, LPS
- INCREASE GRADING PRODUCTIVITY SIGNIFICANTLY - REDUCE STAKING ON JOBSITE ALMOST ENTIRELY - CONTROLLING OF MATERIAL
- UP TO 300% MORE ACCURATE THAN STANDARD GPS - INCREASED PRODUCTIVITY – FEWER PASSES NEEDED TO REACH FINISH GRADE - GRADE TO TIGHTER TOLERANCES
- HIGH ACCURACY FOR TIGHT TOLERANCES PROJECTS - USED WHEN THE JOBSITE DOES NOT HAVE VISIBILITY TO OPEN SKY I.E. WORKING BETWEEN BUILDINGS OR IN HEAVY TREE COVERAGE
MCLENDON ENTERPRISES INC. FOOTPRINT IN GA. CURRENT PROJECTS AS OF AUGUST 1, 2013
NORTH AVIATION EXPANSION - LENGTH OF TAXI WAY = 6,800 FEET - LENGTH OF TUNNEL =1,200 FEET - PILES DRIVEN = 688 - CUBIC YARDS OF DIRT MOVED = 850, 000 - COST OF PROJECT = $ 24,371,531.00
PLANT VOGTLE “21” DAY EMERGENCY RAIL REPAIR - 15,000 CYDS. OF DIRT REMOVED - THREE RUNS OF 72” RCP 180’ LONG EACH REPLACED - 50 CYD. CONCRETE WEEP WALL INSTALLED - 20,000 CYDS. OF DIRT REPLACED - 130,000 LBS. OF SAND AND CONCRETE BAGS - REPLACED 300’ OF RAILROAD
DEAN FOREST ROAD WIDENING - LENGTH OF PROJECT = 2.5 MILES - TOTAL UNDERGROUND UTILITIES INSTALLED = 9,750 FEET - CUBIC YARDS OF DIRT MOVED = 60, 000 - COST OF PROJECT = $ 7,895,231.00
GA DOT MLP OO-0030-(081) EVANS COUNTY - LENGTH OF PROJECT = 1.58 MILES - CYDS. OF CONCRETE POURED FOR RETAINING WALL = THREE FOOTBALL FIELDS x THREE FT. DEEP - TOTAL UNDERGROUND UTILITIES INSTALLED = 84,480 FEET - COST OF PROJECT = $ 18,934,256.00
VIDALIA, GA COST OF PROJECT = $ 4,183,202.00 ASPEN HEIGHTS APARTMENT COMPLEX NEW MEADOWS HOPISTAL STATESBORO, GA COST OF PROJECT = $ 2,569,941.00
BUDGETING - CREATING MAXIMUM VALUE FOR EVERYONE - WAYS TO MAINTAIN PROJECT SCHEDULES - HIGH QUALITY PROJECT RESULTS
ON SITE MEETINGS - PLANNING AND PREPARING - PROJECTS PROGRESSION - EXECUTION OF PLANNING - PROJECT COST ANALYSING
COMPLETION OF PROJECTS - - DID WE MAINTAIN A GOOD QUALITY PRODUCT ? - DID WE FINISH UNDER BUDGET ? - DID WE FINISH PROJECT EARLY ? - WHAT DID WE LEARN ?
THE Way !
ITEMS TO DISCUSS: - MCLENDON ENTERPRISES HISTORY: PAST, PRESENT, AND FUTURE - BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY - MCLENDON ENTERPRISES INC. WORKING HAND IN HAND