MAKTAB KEJURUTERAAN JEFRI BOLKIAH

MAKTAB KEJURUTERAAN JEFRI BOLKIAH. GROUP : 2 MANUFACTURING TECHNOLOGY TITLE : PLANT BUILDING TEAM NAME : ESLEEN. UNIT : SAFETY. Firstly, in this unit there are rules in the workshop. Which, consists of two rules. They are :- Safety rules House rules. Safety rules.

thane
Download Presentation

MAKTAB KEJURUTERAAN JEFRI BOLKIAH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAKTAB KEJURUTERAAN JEFRI BOLKIAH GROUP : 2 MANUFACTURING TECHNOLOGY TITLE : PLANT BUILDING TEAM NAME : ESLEEN

  2. UNIT : SAFETY

  3. Firstly, in this unit there are rules in the workshop. Which, consists of two rules. They are :- • Safety rules • House rules

  4. Safety rules • Areas in the workshop is restricted to authorized personnel only. • No machine may be used or undertaken. • PPE (Personal Protective Equipment) is provided and must be used where necessary. • Do not carry loads that may be dangerous or vision obscured. • Report any defective equipment. • Equipment should never be used if the safety guards have been removed • Smoking, eating and drinking in the workshop areas is strictly prohibited.

  5. continued… • The gangway through the workshop must be kept clear. • Equipment must be cleaned after use. • Precision measuring equipments, must be replaced in their appropriate cabinets. • All accidents and incidents must be reported. • Tools and equipment must not be removed from the workshop. • Any materials, tools or equipment used must be tidied away. • In case of fire, act in accordance with the FIRE ACTION NOTICES displayed throughout the building.

  6. Next

  7. Floor are to be kept tidy and dry. • Benches are to be kept clean and free from chemicals and apparatus that are not being used. • Aisles and exits are to be kept from obstruction. • Bottles and glassware are to be kept off the floor. • Access to all emergency equipment is to be kept free from obstruction. • Work areas and equipment are to be thoroughly cleaned after use. • If last to leave the workshop, make sure all equipment is turned off.

  8. PLANT STAFFROOM

  9. PLANT WORKSHOP

  10. Emergency procedures In the event of fire or other emergency that may endanger staff and students the following procedures apply :- • Alert others in the immediate area, incase there is fire. • Inform the nearest building warden or workshop supervisor. • When an alarm is raised proceed quickly to the nearest emergency exit. • After leaving the workshop/staffroom, proceed to the assembly area. • DO NOT return to the building until the “All Clear” is given by the workshop supervisor.

  11. Overview of Plant Staffroom

  12. Overview of Plant Workshop

  13. CONCLUSION • First, follow the rules • Second, wear protective equipment • Mind your action • Always remind yourself all the safety and house rules

  14. REFERENCE • Google earth.com • www.uow.edu.au/content/group/@web/@eng/document/doc/vow062918.pdf

  15. SLOGAN I LIKE TOHH, B.B.S Muhd. Waddud Muhd. IzzatHamizan SaifullahIzzat Hazirah