1 / 27

CTC Work Packages ver 2.1

CTC Work Packages ver 2.1. HS for CTC. Overview CTC Work Packages (1/3). Overview CTC Work Packages (2/3). Overview CTC Work Packages (3/3). CTC-001 DR SC wiggler.

tex
Download Presentation

CTC Work Packages ver 2.1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CTC Work Packagesver2.1 HS for CTC

  2. Overview CTC Work Packages (1/3)

  3. Overview CTC Work Packages (2/3)

  4. Overview CTC Work Packages (3/3)

  5. CTC-001 DR SC wiggler To be ready for beam in ANKA in the year 2012 this program will need a temporary loan of a PM wiggler for ANKA (CERN charge to find one)

  6. CTC-002 Survey and Alignment

  7. CTC-003 Quad stability

  8. CTC-004 two-beam module development CLIC Linkperson: G. Riddone

  9. CTC-004 two-beam module development Other comments: total modules considered for construction: 13-16 (see task 1); All deliverables for modules (Alignment, Stabilization, BI, vacuum, RF structures etc) paid by TBA module budget.

  10. WP: CTC-005 Warm Magnet Prototypes

  11. CTC-006 Beam Instrumentation-task1

  12. CTC-006 beam instrumentation -task2

  13. CTC-006-beam instrumentation task3 (1/2)

  14. CTC-006-beam instrumentation task3 (2/2)

  15. CTC-006-beaminstrumentation-task4

  16. WP: CTC-07 MDI activities

  17. WP: CTC-008 Beams disposal(post collision line and dumps)

  18. WP: CTC-009 MP-OP 18 ms; post pulse analysis; confirms OK 2 ms: Machine save by construction Time

  19. WP: CTC-010 Civil Engineering and Services (CES) Other comments: *Material Budget is for external consultancy services (e.g. geologist, environmental experts, design engineers, architects) **Personnel inside CERN will come from several departments, but mainly GS&EN. This staffing estimate needs to be discussed other departments.

  20. WP: CTC-011 Controls

  21. WP: CTC-012 RF systems

  22. WP: CTC-013 powering

  23. WP: CTC-014 vacuum systems Needs completion

  24. WP: CTC-015 Magnetic Stray fields Measurements

  25. CTC-016 DR Extraction System(1/2) Other comments: The importance for CERN is: comparison and choice of technologies, validation of prototype in an operational facility. Extremely challenging technical specifications to be demonstrated: possible fallback solutions should also be investigated, including sophisticated control system for droop and ripple cancellation – but manpower and resources are limited.

  26. CTC-016 DR extraction system(2/2) Other comments: The importance for CERN is: optimization of design of striplines for CLIC damping ring (e.g. cross-section, coverage angle, taper, beam pipe dimensions), verification of beam impedance; R&D mainly carried out by collaborators. Prototyping in Spanish industry. Main costs for R&D and manufacture are paid by CDTI, Spain (IDC-20101074): small contribution may be requested from CERN. Extremely challenging technical specifications to be demonstrated. Ceramic support Feedthru

  27. CTC Summary Table