1 / 15

What is MICE

What is MICE. M uon I onisation C ooling E xperiment What is Ionisation Cooling ? Cooling = Reduction of Beam Emittance Energy Loss + Reacceleration = Reduction of p T / p L Limited Multiple Scattering Works better with light materiel (low Z) Works only for low energy muons

terriperry
Download Presentation

What is MICE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What is MICE • Muon Ionisation Cooling Experiment • What is Ionisation Cooling ? • Cooling = Reduction of Beam Emittance • Energy Loss + Reacceleration = Reduction of pT /pL • Limited Multiple Scattering • Works better with light materiel (low Z) • Works only for low energy muons • No Energy Loss by Radiation • No Hadronic Interaction Jean-Sébastien Graulich

  2. Why MICE is Needed • Standard Cooling doesn’t work for muons • Stochastic and electron cooling are too slow • Never tested • No doubt on the principle but practical challenges • Large RF Cavities in Strong Magnetic Field • Liquid Hydrogen (Energy) Absorbers • Major source of uncertainty on the cost and complexity of a Muon Storage Ring • Better to Prototype/study it !… A factor 10 in intensity and 20% of the cost… Jean-Sébastien Graulich

  3. Why a Muon Storage Ring • Possible future big projects for Pf • International Linear Collider • Neutrino Factory • Muon Collider • … • There is interest for a NuFact in Europe • RAL: Very positive sign : Approval ! + Call for a scoping study • CERN (report from Scientific Policy Committee to council): “Future neutrino facilities offer great promise for fundamental discoveries. CERN should join the world effort in developing technologies for new facilities : Beta beams, Neutrino Factory…wherever they are sited.” “Focus now on enabling CERN to do the best choice by 2010 on future physics programme.” • ECFA recommended “a co-ordinated collaborative R&D effort to determine the feasibility and practical design of a neutrino factory based on a high energy muon storage ring” (already in Sept 2001). • EMCOG (European Muon Coordination and Oversight Group): “The issue of ionisation cooling is critical and this justifies the important effort that the experiment [MICE] represents” (Feb 2003) Require Muon Storage Ring Jean-Sébastien Graulich

  4. Neutrino factory at CERN • - Neutrino Factory is considered the ultimate neutrino facility • Allows precision measurement of • Sin2q13 • n Mass hierarchy • leptonic CP violation http://muonstoragerings.cern.ch Jean-Sébastien Graulich

  5. MICE collaboration • Started in 2001 • 40 institutions, 8 countries, ~150 people • Main participants • RAL and UK collaboration, • FNAL and US Neutrino factory and Muon Collider Collab. • KEK, Osaka • INFN Milano, Roma, Napoli Frascati, and.. • DPNC Geneva, (and CERN) • MICE is approved at RAL (Oct 03) • UK funding released on March 05 • MICE is a Recognised Experiment at CERN (RE11) Jean-Sébastien Graulich

  6. MICE will be hosted at RAL using ISIS beam MICE Site • 200 MeV/c muons • 600 muons / Spill • 1ms Spill duration • 1 Spill / second Jean-Sébastien Graulich

  7. Coupling Coils 1&2 Spectrometer solenoid 1 Matching coils 1&2 Matching coils 1&2 Spectrometer solenoid 2 Focus coils 1 Focus coils 3 Focus coils 2 Beam PID TOF 0 Cherenkov TOF 1 RF cavities 1 RF cavities 2 Downstream particle ID: TOF 2 Cherenkov Calorimeter Liquid Hydrogen absorbers 1,2,3 Trackers 1 & 2 measurement of emittance in and out MICE concept:Beam Diagnostic using particle per particle tracking m VariableDiffuser Incoming muon beam Jean-Sébastien Graulich

  8. Muon Ionization Cooling Experiment MICE Summary Aims: - Engineer and run a section of cooling channel - Measure emittance with 0.1 % accuracy Final PID: TOF Cherenkov Calorimeter Main challenges: - RF in magnetic field! - Safety issues 4T spectrometer II Status: Approved at RAL(UK) First beam: 04-2007 Funded in: UK,CH,JP,NL,US Requests: CH,It,JP,US Cooling cell (~10%) b=5-45cm, liquid H2, RF 4T spectrometer I TOF Single-m beam ~200 MeV/c Some prototyping: 200MHz RF cavity with beryllium windows Jean-Sébastien Graulich Liquid-hydrogen absorbers Scintillating-fiber tracker

  9. PHASE I - Understand systematics - Check optical match PHASE II Test ionization cooling m - STEP I: April 2007 MICE Plan STEP II: October 2007 STEP III: 2008 STEP IV: 2008 STEP V 2008? STEP VI 2009? Jean-Sébastien Graulich

  10. Geneva in MICE • Management (Alain Blondel) • AB is Spokesperson • Funding • Trigger and Data Acquisition • R&D for a tracker upgrade • TPC with GEM readout • Request for a Swiss coupling coil being submitted (contact: Bruker Biospin Faellanden-CH) Jean-Sébastien Graulich

  11. Coupling Coils • Currently, the coupling coils would be funded by the US…in 2011! • MICE results would be *very* late… If MICE is delayed, the neutrino factory might miss the next take off… 2010… EURO PF nFact A STRATEGIC contribution! Jean-Sébastien Graulich

  12. Geneva in MICE (1) • RF Background Simulation (Rikard Sandstrom) • High-gradient Cu RF cavities in high magnetic field ! • Field emission of electrons (dark current) -> Magnetic field focuses dark currents and lowers onset of breakdown -> Electrons produce X-ray by Bremsstrahlung, and produce breakdowns -> X-rays convert into the detectors • Direct measurement + Simulation => Tracker validation • tests of 200 MHz cavity about to begin in FermiLab. • Coupling coil will be necessary to test cavity with realistic magnetic field! Operation of RF cavities in Mag. Field is the hardest challenge of MICE! Jean-Sébastien Graulich

  13. Geneva in MICE (2) • PID Simulation (Rikard Sandtrom) • Muons decay in flight • > positrons • Cause systematics error on the emittance measurement • Bias must remain below 10-3 • PID detectors used in Neural Network • > weight for “muonness” + study role of time measurements in determination of 6D emittances Jean-Sébastien Graulich

  14. Geneva in MICE (3) • DAQ • 600 muons per 1 ms Spill, repeated at 1 Hz • All the tracking and PID data have to be buffered in the FEE and read out at the end of the spill • About 20 MB / Spill (20 GB / Run) => Architecture based on HARP experience • Control and Monitoring • Detector + Beam Line + Cooling Channel • Several 100 of parameters • Should react at the spill rate (> 1Hz) Jean-Sébastien Graulich

  15. Conclusion • MICE: Muon Ionisation Cooling R&D • Precision emittance measurement (0.1 %) • Needed for high lumi. Muon Storage Ring -> Neutrino Factory • Recognised and Funded • Sited at RAL • Should give results before 2010 -> big decisions for post LHC era • Geneva is deeply involved • Simulation: RF background, PID • DAQ Jean-Sébastien Graulich