An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Directable Multi-Agent Navigation and Simulation SachinPatil

  2. Project Proposal • Authoring very large crowds is challenging • Simulating emergent behaviors using agent-based methods is non-trivial • Setting up simulations to get desired output is tedious • Need to develop real-time tools for authoring multi-agent simulations • Degree of control can vary from scripting individual behaviors to controlling crowd flows (macroscopic)

  3. Problem Definition • User-guided navigation is a step towards directable crowds • Top-down approach • Provide macroscopic control over navigation of groups of agents using vector fields (flow fields) • Specification of emergent behaviors such as formation of lanes and vortices • Intuitive UI for editing multi-agent simulations

  4. Previous Work • Authoring crowd simulations • Steering Behaviors for Autonomous Characters [Reynolds 99] • CrowdBrush : Interactive Authoring of Real-Time Crowd Scenes [Ulciny 04] • Scalable Behaviors for Crowd Simulation [Sung 04] • Flow Tiles [Chenney 05] • Interactive Control of Large Crowd Navigation in Virtual Environments using Vector Fields [Jin 08] • High-Level Path Specification and Group Control [Silveira 08] • Group Motion Editing [Kwon 08] • Massive [MassiveSoftware] has utilities to paint flow fields on terrain to direct crowd flow (http://www.youtube.com/watch?v=e0SIezN-0UU)

  5. Approach • Design vector fields for user-guided navigation • Construct local navigation field for every group of agents (goal-driven) • Global vector field specification for the entire scene (lanes, vortices and other movement patterns) • Use a grid-based approach • Solve the eikonal equation on a regular grid using FMM • Modify cost function based on user input • Parallelization over many cores/GPU • A Fast Eikonal Equation Solver for Parallel Systems, Jeong and Whitaker, SIAM-SC 2007 • Flow fields for global navigation + RVO for local collision avoidance! • Overall motions not smooth enough (modify RVO penalty criteria)

  6. Novel Aspects • Designing arbitrary vector fields for authoring multi-agent simulations • Novel cost function for the eikonal equation • Eikonal equation needs to be solved per user-edit and not per simulation step • Intuitive interface for authoring simulations (user mouse gestures, paint-brush like interface etc.)

  7. Project Roadmap • Incorporate new cost function in FMM based solver • Develop intuitive UI for editing simulations • Speedups • Possibly port to many-cores/GPU based on [Jeong 07] for interactive editing • E* to locally repair fields instead of re-computing the entire solution • Extensions: • Tool for higher-level behavior specification (queuing, following, shepherding etc.) • Dynamic flow fields • Data-driven crowds

  8. Questions?