1 / 10

OPEN ACCESS IN INTER-STATE TRANSMISSION

OPEN ACCESS IN INTER-STATE TRANSMISSION. Procedure for reservation of transmission capacity by Long-Term Open Access Customer. Long Term Open Access - Procedure. Receipt of Application for long term Open access by CTU in the prescribed format.

temple
Download Presentation

OPEN ACCESS IN INTER-STATE TRANSMISSION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPEN ACCESS • IN • INTER-STATE • TRANSMISSION

  2. Procedure for reservation of transmission capacity by Long-Term Open Access Customer

  3. Long Term Open Access - Procedure Receipt of Application for long term Open access by CTU in the prescribed format CTU to carry out system studies within 30 days of receipt of application to determine whether Scenario - I open access can be allowed withoutany system strengthening Scenario-II Additional system strengthening would be required for desired open access

  4. Procedure – Scenario - I • Applicant to confirm with in 30 days to sign BPTA • Otherwise application shall be canceled • Long term Open access – effective only after signing of BPTA

  5. Procedure – Scenario - II

  6. Application for Long Term Open Access –As per CERC Notification • POWERGRID developed following format/documents long term open access • Application Form with its covering letter • Guidelines • Terms and Conditions • Format for intimation of open access • Applicants shall deposit application fees of Rs. 1 Lakh through DD.

  7. Application for Long Term Open Access –As per CERC Notification • POWERGRID developed following format/documents long term open access • Application Form with its covering letter • Guidelines • Terms and Conditions • Format for intimation of open access • Applicants shall deposit application fees of Rs. 1 Lakh through DD.

  8. Application and Guidelines • Guidelines for application • Applicant shall complete the Application form for seeking Long Term Open Access and provide following in a prescribe format: • Details of the applicant • Power transfer requirement (peak load, average load) • Details of points of injection and drawl • Date of commencement and duration • Generating station details including various clearances in case of new Gen. Station • Name of trader if any • Confirm acceptance of Terms & Conditions

  9. Additional Terms & conditions for Applicants • Comply with IEGC in force from time to time • POWERGRID shall only carry out the study and shall not be bound to construct the identified system strengthening • Indemnify POWERGRID for any loss or damage arising as a consequence of study carried out by us. • Open Access shall be effective from the date of permission or date on which identified system strengthening is in place, whichever is later • Share the RLDCs fees & charges and any other charges as per directions of CERC. • Shall not transfer rights and obligations specified in BPTA without approval of CERC and shall be subjected to payment of compensation as determined by CERC.

  10. Thank you

More Related