amc 20 xz airworthiness and operational approval for rnp approach operations n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
AMC 20-XZ “ AIRWORTHINESS AND OPERATIONAL APPROVAL FOR RNP APPROACH OPERATIONS ” PowerPoint Presentation
Download Presentation
AMC 20-XZ “ AIRWORTHINESS AND OPERATIONAL APPROVAL FOR RNP APPROACH OPERATIONS ”

Loading in 2 Seconds...

play fullscreen
1 / 11

AMC 20-XZ “ AIRWORTHINESS AND OPERATIONAL APPROVAL FOR RNP APPROACH OPERATIONS ” - PowerPoint PPT Presentation


  • 196 Views
  • Uploaded on

AMC 20-XZ “ AIRWORTHINESS AND OPERATIONAL APPROVAL FOR RNP APPROACH OPERATIONS ”. Prepared by Geoff Burtenshaw SRG/UK CAA CNS/ATM Steering Group Meeting Hoofdorp, 21-22 June 2005. AMC 20-XZ Objectives. Builds on existing guidance material

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'AMC 20-XZ “ AIRWORTHINESS AND OPERATIONAL APPROVAL FOR RNP APPROACH OPERATIONS ”' - teleri


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
amc 20 xz airworthiness and operational approval for rnp approach operations

AMC 20-XZ“AIRWORTHINESS AND OPERATIONAL APPROVAL FOR RNP APPROACH OPERATIONS ”

Prepared by Geoff Burtenshaw SRG/UK CAA

CNS/ATM Steering Group Meeting

Hoofdorp, 21-22 June 2005

amc 20 xz objectives
AMC 20-XZ Objectives
  • Builds on existing guidance material
  • Contains both airworthiness and operational criteria
  • With AMC 20-XX completes family of EASA/JAA RNAV guidance material from departure to final approach
  • On EASA 2005 Rulemaking Programme
scope
Scope
  • Consistent with RNPSORSG revised RNP concept
  • Addressing today’s RNP qualified aircraft
  • Such aircraft already considered P-RNAV compliant
  • RNP in the Final Approach Segment
scope cont
Scope cont.
  • Supporting RNP 0.3 approvals but also airworthiness demonstration for < 0.3 NM
  • Consistency with FAA Notice 8000.287 Special Aircraft and Aircrew Authorisation Required (SAAAR) and Public SAAAR criteria
amc 20 xz aspects
AMC 20-XZ Aspects
  • Applicability
    • RNP compliant systems e.g., MASPS ED-75()/DO-236() functional criteria
  • Assumptions
    • A multi-sensor GNSS, DME/DME/IRU platform
    • Latest ICAO Doc 8168 criteria (OCP RNP Sub-Group)
amc 20 xz aspects cont
AMC 20-XZ Aspects cont.
  • Flight Guidance
    • LNAV or LNAV/Baro VNAV
    • AC 120-29A Baro-VNAV performance
  • Apart from the RNP specifics, common flight crew operating techniques and procedures with AMC 20-XX
amc 20 xz status
AMC 20-XZ Status
  • AMC circulated over a year ago
  • Comments received but no further revision
  • Decision at NASG to harmonise with ongoing PARC work to develop Public RNP SAAAR Procedures
  • No sense in having different criteria
  • AMC 20-XZ will track PARC activity
amc 20 xz status cont
AMC 20-XZ Status cont.
  • Agreed to include relevant Appendix 3 and 4 material from Notice 8000.287
  • Include a requirement for an Operational Support Document detailing airworthiness assumptions
  • Operational requirements and issues still evolving within frame of current approvals (Boeing/Airbus)
summary
Summary
  • Revised AMC 20-XZ in work but awaiting publication of FAA criteria for Public SAAAR e.g., AC 90-RNP SAAAR
  • Mature AMC 20-XZ available by October 2005 (EUROCONTROL/FAA RNP Workshop)
summary cont
Summary cont.
  • Guidance leaflet will then be presented to EASA and JAA OST for adoption
  • Public consultation
  • Publication as AMC 20 Series:
    • AMC 20-XZ, RNP Approach Operations