MFCS Norfolk. MGySgt Freiler 2008 LRG Wednesday 21 May. MAILING NAVAIR MFCS-NORFOLK 8581 PATROL RD ATTN: MGYSGT R.J. FREILER NORFOLK VA 23511-4213. SHIPPING NAVAIR MFCS-NORFOLK N58070 8581 PATROL RD BLDG NM92 ATTN: MGYSGT R.J. FREILER NORFOLK VA 23511-4213. Address Information.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'MFCS Norfolk' - teige


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
mfcs norfolk

MFCS Norfolk

MGySgt Freiler

2008 LRG

Wednesday 21 May

address information
MAILING

NAVAIR MFCS-NORFOLK

8581 PATROL RD

ATTN: MGYSGT R.J. FREILER

NORFOLK VA 23511-4213

SHIPPING

NAVAIR MFCS-NORFOLK N58070

8581 PATROL RD

BLDG NM92

ATTN: MGYSGT R.J. FREILER

NORFOLK VA 23511-4213

Address Information
poc information
POC Information
  • PHONE
  • 757 444-7334
  • 757 444-7132 (FAX)
    • DSN 564
present manning
Present Manning
  • 1 NAVAIR Liaison
  • 1 FRC Support Equipment

Program Officer

  • 3 BAE Support Staff
present manning1
Present Manning
  • DynCorp Staff
    • Site Manager
    • Production Foremen
    • Electricians
    • Mechanics/ Workers
    • Painter/CC
    • Supply
    • QA
workload
Workload
  • MV22
    • HY-06C
    • RR-04A
    • RR-05B
    • TB-02
workload1
Workload
  • MV22 (cont)
    • MALS 29
      • HY-06C: Delivered to unit
      • RR-04A: Complete (Compressor delivered to unit)
      • RR-05B: Complete
      • TB-02: Awaiting delivery of tube bender
    • MALS 16
      • HY-06C: Work Stopped awaiting Hyd Control
      • RR-04A: Packout
      • RR-05B: Packout
      • TB-02: Awaiting delivery of tube bender
workload2
Workload
  • JSF
    • LN-01: Awaiting installation of Fire Suppression System
    • Packout
  • Air Force
    • KA-18A
      • 2 MFs assigned; all identified materials on order
      • 2 HY-06 Mobile Tables complete (1 Shipped on 16 May)
    • 1 KA-14 complete
    • 1 KA-17 to KA-14 conversion
      • KA-17 configuration stripped out
      • KA-14 Materials on order
      • CSC issue
workload3
Workload
  • PMA-213 (ATC)
    • 3 configurations (AT-11, AT-12, CR-03)
    • 4 MFs per set {AT-11 (1), AT-12 (1) , CR-03 (2)}
    • 9 sets (36 MFs) on current work load
pma 213 atc mfs
PMA-213 (ATC) MFS
  • All from rehabbed MFs
  • Incorporated many common MF components along with other customer requested features
    • Exterior is CARC tan
    • Butcher-block countertops
    • Non-skid floors
    • Built-in telephone circuits
    • R134 ECUs
accomplishments
Accomplishments
  • UIC Establishment
    • MFCS-Norfolk is now N58070
  • Establish PLAD for Norfolk configuration site
    • All paperwork has been submitted
    • Awaiting controlling authorities to activate it
    • NAVAIR MFCS NORFOLK VA
accomplishments1
Accomplishments
  • MV22 MF Builds
    • MALS-26 & MALS-26 TSA
      • Delivered to units
  • Fleet MF Builds/Rehabs
    • 8 KA-14s & 2 KA-15s
      • Awaiting destinations
    • 2 FS-01s for M49
      • Used Asia return shells
    • 1 CR-01, 1 SU-02 & 2 SU-03 for M49
    • TT-04B for M41
      • Original shell was BER
accomplishments2
Accomplishments
  • Survey and disposal of MFs
    • MFs stripped of non-metals and useable parts and sent to Base Metal Recycling
      • Disposed 6 previously surveyed MFs from site
      • Disposed 31 MFs from Asset Report
      • 10 more processed
      • 12 MFs awaiting teardown
      • 1 MF transferred to Norfolk Dive Team E via DRMO
tasks
Tasks
  • Investigate using polyurethane tan as a possible exterior color for future MFs
    • Temperature test to be performed this summer
tasks1
Tasks
  • TQG ETool Kits
    • Install ID plates and serialize kit components
      • 25 kits received and completed
    • Deliver kits to fleet
      • Active MALS units
        • Shipped out on 16 May
      • Marine Reserve and Navy Units
        • 30 to 60 days before TQG deliveries
tasks2
Tasks
  • R134 ECU Special Tool Kits
    • Shipped with TQG ETools
slide22
Fleet Return MF Issues
  • ECUs not properly shored
  • Packout Items missing
  • Deconfiguration
  • Mismatched doors
  • Filth