60 likes | 187 Views
Chapter two. ROAD TO DESIGN BUILD. ROAD MAP. THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP) CM PM DB IS THE LATEST STAGE: NEW PERSPECTIVE ON QUALIFICATIONS , A CLEAR DEFINITION OF THE PROJECT PROGRAM, PERFORMANCE SPECIFICATION, OWNER’S REPRESENTATIVE AND THE CONTRACT.
E N D
Chapter two ROAD TO DESIGN BUILD
ROAD MAP • THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP) • CM • PM • DB IS THE LATEST STAGE: NEW PERSPECTIVE ON QUALIFICATIONS , A CLEAR DEFINITION OF THE PROJECT PROGRAM, PERFORMANCE SPECIFICATION, OWNER’S REPRESENTATIVE AND THE CONTRACT
PROCESS OD DESIGN BUILD • COMPETITIVE BIDS IS DIFFERENT THAN DBB • THREE ISSUES: ACCEPTANCE OF DESIGN, SCOPE OF WORK AND TOTAL COST • RFP • WEIGHTED CRITERIA METHOD-PTS SYSTEM • ADJUSTED LOW BID • THE EQUIVALENT DESIGN AND LOW BID • A FIXED PRICE-BEST DESIGN APPROACH
DB • ADVANTAGES AND DISADVANTAGES • BRIDGING DESIGN APPROACH TO DB: DESIGN-DESIGN-BUILD, OWNER RESPONSIBILITIES, BRIDGING CONSULTANT AND DESIGN BUILD FIRM
HOW EFFECTIVE IS DB? • DB VS DBB-SIZE • PUBLIC VS PRIVATE • INDUSTRIAL PROJECTS • OVERALL-COST, SCHEDULE, SAFETY, CHANGES AND REWORK
ISSUES IN DB • QUALITY: OWNERS/DP/ORGANIZATIONS