John F. Kennedy Space Center Delta II/ NLS - PowerPoint PPT Presentation


  • 159 Views
  • Uploaded on

THEMIS Launch Management Coordination Meeting February 13, 2007. John F. Kennedy Space Center Delta II/ NLS. FINAL 2-11-07. Agenda. Introduction Chuck Dovale Launch Management Structure, Seating Tracey Post and Communications Channel Summary

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'John F. Kennedy Space Center Delta II/ NLS' - tasya


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
John f kennedy space center delta ii nls

THEMIS

Launch Management

Coordination Meeting

February 13, 2007

John F. Kennedy Space Center

Delta II/ NLS

FINAL 2-11-07


John f kennedy space center delta ii nls

Agenda

  • Introduction Chuck Dovale

  • Launch Management Structure, Seating Tracey Post

  • and Communications Channel Summary

  • Launch Day Roles & Responsibilities Tracey Post

  • Launch Windows, Status Checks, and Protocol Tracey Post

  • Weather Constraints and Collision Avoidance Tracey Post

  • Recycle Requirements and Mandatory Tracey Post

  • Constraints/Assets

  • Mission Dress Rehearsal Details Tracey Post

  • Launch Day Script Tracey Post

  • Range Calendar and Remaining Meetings Tracey Post

  • NASA Launch Manager’s Summary Chuck Dovale


John f kennedy space center delta ii nls

Launch Management Structure, Seating

And Communications Channel Summary


John f kennedy space center delta ii nls

THEMIS

Launch Day Management Flow

Mission

Operations Manager

Manfred Bester

Spacecraft Test Conductor

Dave Curtis

ASO Test Conductor

Rick Sterling

GSFC Network

Operations Manager

Arnie Rausch

MOC

LVDC

ASO

GSFC

Go / No-Go

Go / No-Go

Go / No-Go

Go / No-Go

GSFC Safety & Mission Assurance Manager

Ron Perison

THEMIS Ground Operations

Donald Gates

THEMIS

Project Manager

Peter Harvey

LVDC

MDC

MDC

Go / No-Go

Go / No-Go

Go / No-Go

Go / No-Go

NASA SMA Team

NASA MIT

NASA Eng Team

NASA Advisory Team

Mission

Manager

Garrett Skrobot

Spacecraft

Mission Director

Frank Snow

NASA Chief

Engineer

James Wood

Safety & Mission

Assurance

Rick Boutin

NASA Advisory

Manager

Joe Lackovich

INFO

MDC

LVDC

MDC

MDC

MDC

SMD

Go / No-Go

MISSION MANAGEMENT

NASA SMA

NASA ENGINEERING

Go / No-Go

ADVISORY

Go / No-Go

Go / No-Go

NASA ALM

NASA Launch Manager

Chuck Dovale

MDC

NASA

Go / No-Go

ULA Mission

Director

Rich Murphy

MDC


John f kennedy space center delta ii nls

GSFC

Safety & Mission

Assurance Mngr

(GSFC)

NASA

Chief Engineer

(KSC)

NASA

Engineering

Team (KSC)

MDC Ops

Director

(KSC)

AF Launch

Crew

Commander

(1 SLS)

THEMIS

Launch Decision Flow

UCB Mission Operations Center (MOC)

Mission Director Center (MDC)

LVDC

NASA

Mission

Manager

(KSC)

Go/No-Go

NASA

Safety & Mission

Assurance Mngr

(KSC)

Go/No-Go

Go/No-Go

Status

NASA Advisory

Manager

(KSC)

Go/No-Go

Spacecraft

Mission

Director

(GSFC)

NASA

Launch

Manager

(KSC)

Advisory

Go/No-Go

Go/No-Go

Mission

Operations

Manager

(UCB)

AF Launch Director

1 SLS

Go/No-Go

Go/No-Go

Go/No-Go

Go/No-Go

Go/No-Go

THEMIS

Project

Manager

(UCB)

Go/No-Go

CMDRS NET

Launch

Concur

Mission

Director

(ULA)

GSFC

Dir. of Eng.

Operations

Integrator

(ULA)

THEMIS Ground

Operations

(GSFC)

GSFC Network

Operations

Manager

(GSFC)

(ULA)

Go/No-Go

Range

Operations

Control Center

Status

Launch

Decision

Go/No-Go

Status

L/V Sys Status

Operations

Building (OB)

Launch Vehicle

Launch

Director

(ULA)

Astrotech

(ASO)

USAF

45 SW/CC

Space Lift

Commander

(SLCC)

Systems

Engineering

(ULA)

Status

Vehicle Status

ASO Test Conductor

(UCB)

WINDS

Go/No-Go

(ULA)

Status

Missile

Chief Engineer

(ULA)

Range

Coordinator

(ULA)

Launch

Conductor

(ULA)

Status

Range

Control Officer

LVDC-3

Go/No-Go

Spacecraft

Test Conductor

(UCB)

• Range Safety Status

NASA

Status

Status

Spacecraft

• Range Status

Coordinator

• Weather

Status

(KSC)

• Support Range

Status (LV)


John f kennedy space center delta ii nls

LD

Launch Director

Mark Dowhan

SMD

Spacecraft Mission

Director

Frank Snow

THEMIS

Anomaly Resolution

MD

Mission Director

Rich Murphy

NLM

NASA Launch Manager

Chuck Dovale

Mission

Management

Net

NASA Launch

Manager's Net

CLCDR

Launch Conductor

Bob Godin

Launch

Vehicle /

Integrated

Anomaly

Anomaly Net

Or

ULA Mgmt Net

Anomaly Team

Spacecraft

Only

Anomaly

NASA CE

NASA Chief Engineer

James Wood

MCE

Missile Chief Engineer

Steve Huff

NASA Engineering Team

ULA SLC-17 Team

Anomaly Net

Or

ULA Mgmt Net

Resource Protection

ARC

USAF Anomaly Resolution Chief

Bryan Buckley

DE

Director of Engineering

Dave Crosse

USAF CX-17 Engineering Team

VSE

Vehicle Systems Engineer

Greg Radle

Integrated Anomaly Only

THEMIS SE

THEMIS Systems Engineer

Stu Harris

ULA HB Engineering Team

S/C Eng / Ops Team


John f kennedy space center delta ii nls

THEMIS Mission Director’s Center

AEROSPACE

RANDY MOYER

AIR FORCE ADVISOR

NASA/KSC

RICK BOUTIN

SAFETY & MSN ASSUR

NASA/HQ

WILLIS JENKINS

PROGRAM EXECUTIVE

AFA

SMA

HQPX

25

13

1

6-4525

6-4501

6-4513

6-4502

NASA/KSC

BERT GARRIDO

SMA MISSION MGNT REP

6-4526

6-4514

NASA/GSFC

RICK OBENSCHEIN

FLT PROGRAMS DIR

1ST SLS

LT COL VINCENT CASSARA

DEPUTY AF LAUNCH DIR

26

14

2

DAFLD

MMR

FPD

NASA/GSFC

MARCUS WATKINS

GSFC SAFETY &

MISSION ASSURANCE

1ST SLS

LT COL MYRON FORTSON

AIR FORCE LAUNCH DIR

PI

AFLD

GSMA

UCB

VASSILIS ANGELOPOULOS

PRINCIPAL INVESTIGATOR

O NET

3

15

27

6-4527

6-4515

6-4503

NASA/GSFC

ED WEILER

GSFC CENTER DIRECTOR

6-4528

6-4516

6-4504

UCB

PETER HARVEY

THEMIS PROJ MNGR

ULA

RICK NAVARRO

DIRECTOR LNCH OPS

B NET

THEMIS PM

O NET

16

28

4

GCD

DLO

THEMIS Ground Ops

ANALEX/KSC

TRACY EVANS

ASST MISSION OPS DIR

ULA

RICH MURPHY

MISSION DIRECTOR

AMOD

MD

NASA/GSFC

DONNIE GATES

THEMIS GROUND OPS

6-2241

B NET

O NET

29

17

5

6-4529

6-4517

6-4505

6-4530

NASA/GSFC

FRANK SNOW

S/C MISSION DIR

6-4506

6-4518

ULA

DAVE CROSSE

DIRECTOR OF ENGR

NASA/KSC

MARTY LOUGHEED

MISSION OPS DIRECTOR

B NET

DE

6

30

MOD

18

6-2241

SMD

O NET

NASA/KSC

CHUCK DOVALE

NASA LAUNCH MNGR

NASA/KSC

JOE LACKOVICH

NASA ADV MNGR

NLM

ULA

MIKE KENNARD

OPERATIONS INTEGRATOR

OI

NAM

B NET

31

7

19

6-4531

6-4507

6-4519

NASA/KSC

OMAR BAEZ

ASST LAUNCH MNGR

6-4532

6-4508

ULA

CHEREE KIERNAN

FLIGHT OPS

NASA/KSC

STEVE FRANCOIS

NASA ADVISOR

6-4520

B NET

ALM

8

20

32

KPM

FO

NASA/KSC

AMANDA MITSKEVICH

FLT PROJECTS OFFICE

NASA/KSC

BILL PARSONS

NASA ADVISOR

ULA

SCOTT MESSER

NLS PROGRAM MANAGER

FPO

DPM

KCD

6-2242

B NET

33

9

21

6-4509

6-4533

6-4521

6-4510

NASA/KSC

GARRETT SKROBOT

NASA MISSION MNGR

NASA/KSC

OSCAR TOLEDO

NASA ADVISOR

6-4534

6-4522

ULA

KRIS WALSH

ASST MISSION DIRECTOR

B NET

NASA MiM

34

10

22

AMD

KSA

ULA

MARK WILKINS

VICE PRES DELTA PROG

ANALEX/KSC

TRACEY POST

LAUNCH OPS MNGR

NASA/HQ

BILL WROBEL

SPACE OPS MSN DIR

DVP

LOM

HQM

B NET

35

23

11

6-4523

6-4535

6-4511

NASA/HQ

COLEEN HARTMAN

SCIENCE MISSION DIR

6-4524

6-4536

6-4512

NASA/KSC

MIKE WETMORE

KSC SR MGNT

ULA

GASS/COLLINS

ULA

B NET

24

36

12

ULA

HQSMD

VIP SEATING AREA

Seating POC: Tracey Post

8 Feb 07

MIKE LUTHER

XXXX

-Network Drop for Laptops


John f kennedy space center delta ii nls

THEMIS

Mission Support LVDC-1

Chuck Loftin

NASA SMA

Safety

Reserved

ULA ENGR

Brent Seale

NASA/KSC

K-NET

B NET

9

17

1

6-4557

6-4556

6-4549

Charmel Anderson

NASA SMA

Quality

Reserved

ULA ENGR

Frank Stone

NASA/KSC

10

18

K-NET

B NET

2

Craig Schreiber

NASA SMA Mission

Assurance Manager

Reserved

ULA ENGR

Mike Carney

NASA/KSC

K-NET

B NET

11

3

19

6-4558

6-4555

6-4550

Raoul Caimi

NASA SMA Senior

Integration Engineer

Reserved

ULA DE-1

Jenny Lyons

NASA/KSC

12

B NET

20

K-NET

4

Reserved

ULA ADE

Don Walker

NASA SMA Mission

Assurance Engineer

Doug Lindhorst

NASA/KSC

K-NET

B NET

13

5

21

6-4554

6-4559

6-4551

Reserved

ULA MIM

Rich Thompson

NASA/KSC

Bobbi Gnan

NASA/KSC

6

14

22

B NET

Dave Breedlove

NASA/KSC

Josie Burnett

NASA/KSC

Emilio Cruz

NASA/KSC

15

23

7

6-4553

6-4560

6-4552

LSIM

NASA/KSC

Albert Sierra

NASA/KSC

Pat Simpkins

NASA/KSC

16

24

8

XXXX

-Network Drop for Laptops

Seating POC: Tracey Post

6 Feb 07


John f kennedy space center delta ii nls

L -

K-NET

THEMIS

Engineering Support LVDC-2

B. Moore

NASA P/L Elec

3

K-NET

K-NET

2-9

J. Hoffman

NASA IE (T)

T. Woodard

NASA Elec 1

K-NET

2-1

2-17

9

17

1

6-4572

6-4568

6-4561

5-3745

D. Alicea

NASA P/L Elec (T)

T. Casale

NASA Elec 2

B. Reid

NASA IE

10

2

18

L

L

4

K-NET

K-NET

K-NET

2-2

2-18

2-10

S

5

T. Dunn

ACE 1

NASA CE Resv

K-NET

K-NET

S. Jackson

NASA Elec (T)

K-NET

2-3

2-19

2-11

11

3

19

6-4571

6-4562

6-4567

5-1014

D. Ward

NASA (P)

J. Wood

NASA CE

NASA CE Resv

12

S

4

20

6

2-4

K-NET

K-NET

K-NET

2-12

2-20

S

A. Lawhead

NASA EA 2

C. Fortenberry

NASA Thermal (T)

Hot Backup

NASA CE

K-NET

K-NET

K-NET

2-5

3-1

2-13

2-21

13

5

21

6-4569

6-4566

6-4563

5-3747

G. O’Neil

NASA Thermal

J. Joyner

ACE 2

P. Cairns

NASA EA 1

14

S

6

22

2-6

K-NET

K-NET

K-NET

3-2

2-14

2-22

G. Pichardo

NASA Winds (T)

D. Sollberger

NASA DCE 2

2-7

K-NET

K-NET

K-NET

3-3

R. Bosnyak

NASA EA (T)

2-23

2-15

15

7

23

6-4570

6-4565

6-4564

5-3784

B. Benson

NASA Winds 1

D. Bedell

CE2

T. Reinarts

NASA DCE 1

S

S

S

8

16

24

2-8

K-NET

K-NET

K-NET

3-4

2-16

2-24

TM Lab:

See Separate Chart

OB ESA:

NASA Flight Controls 1 – S. Jeffress [6-3366]

C. Alvarado (T) [6-3367]

NASA Prop 1 – C. Holmes [6-3365] / A. Karban (M) [6-3364]

NASA Winds 2 – M. Hametz [6-3362]

OB FAX near Winds Console: 6-2984

ETDS/WinPlot Laptop

Wireless Headset

Network Drop

Pad Closeout

Added Screen

AE FAX: 321-853-6461

(P)

S

Seating POC: P. Cairns

LVDC-2, REV. x, 2/08/07


John f kennedy space center delta ii nls

THEMIS

Mission Support LVDC-3

Charlie Floyd

ANALEX MGMT

O NET

O NET

John Thurber

GSFC

Warren Chen

SWALES

17

9

1

6-4580

6-4581

6-4573

Norm White

ANALEX MGMT

Dennis Lee

GSFC

Dave Curtis

UCB Spacecraft TC

10

18

2

O NET

O NET

Larry Ellis

ANALEX MGMT

O NET

O NET

Stu Harris

UCB THEMIS SE

Mike Cully

SWALES

11

19

3

XY

6-4579

6-4582

6-4574

Steve Owens

SAIC MGMT

Jamey Burget

GSFC

Jeremy McCauley

UCB

12

20

4

O NET

O NET

Linda Warnock

JBOSC

Paul Turin

UCB

O NET

K-NET

Joe Bolek

GSFC

13

21

5

O NET

6-4578

6-4583

6-4575

Tiffany Nail

NASA/KSC

Greg Dalton

UCB

Reserved

GSFC

6

22

14

O NET

K-NET

O NET

Jan McMillen

ANALEX

Ron Perison

GSFC SMA

O NET

Lt Gonzales

STSS B06

K-NET

23

15

7

6-4577

6-4576

6-4584

Roy Fisher

ANALEX

Jeff Chambers

STSS B06

Ron Jackson

UCB

24

16

8

O NET

XXXX

-Network Drop for Laptops

Seating POC: Tracey Post

8 Feb 07


John f kennedy space center delta ii nls

Clinger

THEMIS

NASA EngineeringHangar AE - TM LAB

NASA Pneumatics

NASA Avionics

NASA Prop 2

NASA Avionics

COMM

1B

COMM

3B

COMM

4B

COMM

2B

476-4590

476-4642

853-9339

853-2716

J. Speck

NASA

Avionics 2

S. Daly

NASA

Avionics 2 (T)

D. Loiselle

NASA Avionics 1

T. Jones

NASA

Avionics 1 (M)

T. Schmoll

NASA

Pneu 1 (T)

G. Simone

NASA

Pneu 1

D. Grau

NASA Prop 2

M. Wollam

NASA Prop 2

G. Gregory

NASA P/L

Mech

M. Carbone

NASA P/L

Mech (T)

J. Bjornbak

NASA Instr 1

D. Hendricks

NASA Instr 1 (M)

D. Dvorak

NASA MGSE 1 (M)

M. Veneri

NASA MGSE 1

Dw. Johnson

NASA EGSE 1

476-4641

853-9312

853-9310

476-4643

COMM

8B

COMM

6B

COMM

9B

COMM

7B

NASA EGSE

NASA Instrumentation

NASA MGSE

NASA P/L Mechanical

Plus Count

Operations

Seating POC: P. Cairns

TM Lab, REV. x, 2/08/07

AE FAX: 321-853-6461


John f kennedy space center delta ii nls

MENS RESTROOM

WOMENS RESTROOM

Break Room

1210

1212

EXIT

HALLWAY

LVDC #3

LVDC #2

LVDC #1

LOBBY

MENS RESTROOM

COMMUNICATIONS ROOM

MDC

WOMENS RESTROOM

EXIT

131

TELEMETRY LAB

1470

COMPUTER

125

NEW COMM ROOM

ROOM

Theater

109B

129

BOILER ROOM

1056

1025

123

THEMIS

HGR AE EGRESS ROUTES


John f kennedy space center delta ii nls

THEMIS

Voice Channel Assignment Summary

Detailed Console Configurations are located in the Voice matrix.


John f kennedy space center delta ii nls

Launch Day

Roles And Responsibilities


John f kennedy space center delta ii nls

Launch Day Roles and Responsibilities

  • NASA Launch Manager (NLM) – Chuck Dovale – MDC

    • The NLM is the highest NASA authority for the mission. The NLM is responsible for ensuring that the countdown and launch decision process are properly conducted. This responsibility requires "Go / No-Go" concurrence from the following elements:

      • NASA Chief Engineer (NASA CE) - NASA Engineering and Analysis status of launch vehicle and countdown.

      • NASA Mission Manager (MiM) - Assessment of launch service and spacecraft readiness.

      • Safety & Mission Assurance Manager (SMA) - Quality and Safety assessment of the countdown operations and overall launch decision process.

      • Spacecraft Mission Director (SMD) - Overall assessment of spacecraft readiness.

      • NASA Advisory Manager (NAM) - Consultation / assessment of the launch process and countdown (advisory only).

    • The NLM provides NASA's "Go / No-Go" for Launch to the Mission Director.


John f kennedy space center delta ii nls

Launch Day Roles and

Responsibilities (continued)

  • NASA Chief Engineer (NASA CE) – James Wood – LVDC-2

    • The NASA CE is responsible for advising the NLM of any concerns with status and readiness of the launch vehicle. This status and assessment is obtained from the KSC Engineering Team. The NASA CE provides the NASA Engineering “Go / No-Go” status to the NLM.

  • NASA Mission Manager (MiM) – Garrett Skrobot – MDC

    • The NASA MiM receives information from the SMD on issues pertaining to overall spacecraft health, status of operational network, and/or progress of spacecraft anomaly resolution. The NASA MiM may provide information to the the SMD on issues pertaining to the progress of countdown operations. The NASA MiM gives a “Go / No-Go” status to the NLM.


John f kennedy space center delta ii nls

Launch Day Roles and

Responsibilities (continued)

  • Safety & Mission Assurance Manager (SMA) – Rick Boutin – MDC

    • The SMA Manager of the Safety & Mission Assurance Office is responsible for monitoring NASA flight assurance requirements during the launch countdown process and ensuring the countdown is conducted according to proper procedures. This responsibility includes assessments and “Go / No-Go” status to the NLM utilizing inputs from the KSC Flight Assurance Specialist. The SMA Manager also serves as the integrator of both launch vehicle and spacecraft independent assessments, and as such represents NASA Headquarters Chief of Safety & Mission Assurance Office in the launch process.


John f kennedy space center delta ii nls

Launch Day Roles and

Responsibilities (continued)

  • Spacecraft Mission Director (SMD) – Frank Snow – MDC

    • The SMD is responsible for the overall assessment of the THEMIS Spacecraft. The SMD has the responsibility on launch day for the THEMIS Spacecraft. The SMD will receive spacecraft status and recommendations from the THEMIS launch support team and is responsible for the following:

      • Overseeing the spacecraft launch countdown

      • Providing the NLM with scrub or hold direction for spacecraft anomalies

      • Informing the NLM of spacecraft status

      • Informing the NLM of network status

      • Concurring that countdown anomalies are satisfactorily resolved

      • Providing to the NLM concurrence for continuation of countdown operations

      • Providing the NLM with a final THEMIS Spacecraft "Go / No-Go"


John f kennedy space center delta ii nls

Launch Day Roles and

Responsibilities (continued)

  • NASA Advisory Manager (NAM) – Joe Lackovich – MDC

    • The NAM leads a team composed of NASA personnel who are experienced in launch operations. The Advisory Team provides an assessment of launch countdown and launch team performance, and assures that the launch decision process is properly executed. The team consists of:

      • Steve Francois KSC LSP Program Manager (KPM)

      • Bill Parsons KSC Center Director (KCD)

      • Bill Wrobel Headquarters Management (HQM)

      • Oscar Toledo KSC Senior Advisor (KSA)


John f kennedy space center delta ii nls

Launch Day Roles and

Responsibilities (continued)

  • NASA Spacecraft Coordinator (NSC) – Bill Van Dyke – OB

    • The NASA Spacecraft Coordinator is a member of the NASA/KSC Launch Manager’s staff.

      • During the countdown, the NSC is positioned at the spacecraft control console in the 1 SLS Operations Building.

      • The NSC is responsible for monitoring all satellite operations required by the countdown manual.

      • The NSC coordinates status with the Spacecraft Test Conductor located in LVDC-3 and reports status to the LCDR.


John f kennedy space center delta ii nls

Launch Day Roles and

Responsibilities (continued)

  • Mission Director (MD) – Rich Murphy – MDC

    • The MD is the highest ULA authority for the mission. The MD is responsible for ensuring that the launch countdown and launch decision processes are properly conducted. The MD “Go / No-Go” assessment for launch comes from the following elements:

      • NASA Launch Manager (NLM) - provides NASA’s “Go / No-Go” to launch

      • ULA Director of Engineering (DE) - provides launch vehicle technical

        “Go / No-Go”

      • Operations Integrator (OI) - provides status of remote instrumentation sites/aircraft during launch countdown

      • MDC Operations Director (MOD) - provides communications and telemetry lab “Go / No-Go”

      • Air Force Site Director (AFSD) - provides 45SW/1SLS “Go / No-Go” for SLC17 resource protection

      • ULA’s Launch Director (LD) - provides launch vehicle and countdown status from the OB*

    • Following the launch poll, the MD receives final authorization to launch from the Space Lift Commander (SLCC) and then provides final authorization to launch to the LD.

      * only for SLCC poll



John f kennedy space center delta ii nls

THEMIS

Launch Windows

Due to Mission Assurance COLA analysis, this window has been adjusted by

“rounding up” the opening and “truncating” the closing of windows listed in the DTO.

It also reflects the 18 second penalty on opening/closing based on CG offset evaluation.

TIMES LISTED IN UTC

15-Feb-07

23:08

23:26

16-Feb-07

23:05

23:23

17-Feb-07

23:01

23:19

18-Feb-07

22:58

23:16

19-Feb-07

22:54

23:12

20-Feb-07

22:51

23:09

21-Feb-07

22:47

23:05

22-Feb-07

22:43

23:01

23-Feb-07

22:40

22:58

24-Feb-07

22:36

22:54

25-Feb-07

22:32

22:50

26-Feb-07

22:29

22:47

27-Feb-07

22:25

22:43

28-Feb-07

22:22

22:40


John f kennedy space center delta ii nls

THEMIS

Countdown Status Checks

Based on an 15 February 2007 launch, 93 deg Flight Azimuth,

and target T-0 of 18:08 EST

DECISION

NLM POLL

MD POLL

LCDR POLL

T-150 / L-197

14:51 EST

T-150 / L-193

14:55 EST

T-150 / L-190

14:58 EST

Terminal Count Readiness

T-87 / L-117

16:11 EST

T-85 / L-115

16:13 EST

T-82 / L-112

16:16 EST

Ready for Cryo Tanking

T-15H / L-31

17:37 EST

T-15H / L-33

17:35 EST

T-15H / L-30

17:38 EST

Ready to Proceed with Terminal Count

T-4H / L-8

18:00 EST

Ready to Proceed with Terminal Count –

FINAL Launch Poll

T-4H / L-11

17:57 EST

T-4H / L-5

18:03 EST

Launch Window: 18:08 – 18:26 EST


John f kennedy space center delta ii nls

Protocol for Calling Holds

  • Prior to T-4 minutes and counting

    • Problems or concerns encountered during this time will be discussed with the NASA Launch Manager (NLM) on NASA Launch Manager Channel (NLM Net)

    • The NASA Launch Manager (NLM) will advise the ULA Mission Director (MD) of any problems or concerns being worked

    • If it is determined the problem or concern can not be resolved, the count will not be resumed at T-4 minutes


John f kennedy space center delta ii nls

Protocol for Calling Holds (continued)

  • After resuming the count at T-4 minutes

    • Subsequent to T-4 minutes and counting, personnel observing a condition which exceeds a launch constraint will use the communications system to call for a hold on the Launch Ops Channel. Such announcements should be as follows

      • “Hold! Hold! Hold! Called by (console or title) for (reason)”

      • Example: “Hold!Hold!Hold! Called by Spacecraft Mission Director for Spacecraft Redline” in section 12 of Console Notebook

    • The Launch Conductor will respond by stopping the clock and immediately recycling back to T-4 minutes and holding; and then will ask for further explanation

    • The word “hold” is not to be used for any reason except to stop the launch


Weather constraints and collision avoidance

Weather Constraintsand Collision Avoidance


John f kennedy space center delta ii nls

Weather Constraints

UPDATE BASED UPON WINDS MEMO

  • MST Removal

    • Ground winds must be less than 39 knots as measured at the 90 foot elevation on tower 002

  • Launch

    • Standard ELV weather launch commit criteria

      • As documented in Section 14 of console notebook

    • Ground winds

      • Within 4 minutes of Launch (allowable peak winds)

      • Constraint #5 in Section 14 of console notebook


John f kennedy space center delta ii nls

Collision Avoidance (COLA)

  • Collision Avoidance refers to “Inhabited/Non-inhabited Manned

  • and “Mission Assurance (M.A.) ” conjunctions

    • Manned objects (conjunctions) include: Shuttle, ISS, and Shenzhou

      • Manned conjunctions are a mandatory avoidance for safety (a range

      • requirement, not waiverable)

      • The range receives the data direct from CMOC (Cheyenne Mt. Operations

      • Center) at L-4 hrs (also at L-48 hrs and L-24 hrs in support of launch day)

      • The range is responsible for evaluating the data and providing the final

      • manned conjunctions to the ULA/NASA launch team at approximately L-3 hrs

    • Mission assurance includes: active & inactive satellites

      • Mission assurance conjunctions are a mandatory avoidance

      • NASA receives the data at L-8 hrs (also at L-48 hrs and L-24 hrs)

      • NASA is responsible for evaluating the data and providing a final M.A.

      • COLA decision to ULA at L-6 hrs


John f kennedy space center delta ii nls

Recycle Requirements and Mandatory Constraints/Assets


John f kennedy space center delta ii nls

Launch Vehicle

Mission Recycle Requirements

  • Delta II Recycle Requirements

    • Same day recycle

      • Capability exists to recycle within the window if problem is resolved and sufficient window time remains.

    • 24 hour recycle

      • Standard Delta launch vehicle requirements allow 24 hour recycle. For specific 24 hour turnaround, see Delta Operations section of FRR package.

    • 48 hour recycle

      • Standard Delta requirements allow 48 hours recycle.

    • Multiple scrub limits

      • Multiple launch attempts available less consideration for crew rest, hardware expiration dates, and battery life.


John f kennedy space center delta ii nls

THEMIS

Mission Recycle Requirements

  • THEMIS Spacecraft Recycle Requirements

    • Same day recycle

      • Spacecraft will remain on internal power

    • 24 hour recycle

      • Return to external power

      • Recharge Batteries – Remotely (Does Not Require Fairing Access)

    • 48 hour recycle

      • Same as 24 hour recycle

    • Multiple scrub limits

      • Same as 24 hour recycle

      • If extended delay

      • Continue to Recharge Batteries – Remotely (Does Not Require Fairing Access)


John f kennedy space center delta ii nls

Launch Mandatory & Required Constraints

  • According to NASA Policy, mandatory constraints / assets are not to be waived after initiation of the terminal count at L-180 / T-150 minutes.

  • In the terminal count,

    • LV assets defined as Required can be waived by the MD with concurrence from the NLM.

    • S/C assets defined as Required can be waived by the SMD with concurrence from the NLM.

    • Integrated constraints defined as Required can be waived with concurrence from the MD, SMD, and NLM (Mission Management Team)

  • After T-4 minutes, a hold for loss of Required asset shall not be called, unless pre-coordinated by the Mission Management Team.


Lv mandatory assets for launch excluding range safety
LV Mandatory Assets for Launch Constraints(Excluding Range Safety)

Launch will not occur unless all mandatory assets, including any notes, are satisfied.

The OPR shall not call a “HOLD” for loss of a mandatory asset after T-3 seconds


S c mandatory assets for launch excluding range safety
S/C Mandatory Assets for Launch Constraints(Excluding Range Safety)

Launch will not occur unless all mandatory assets, including any notes, are satisfied.

THEMIS Launch Commit Criteria contained in UCB Doc THM_MINT_PROC_077 Rev J dated Feb 2, 2007


Lv required assets for launch excluding range safety
LV Required Assets for Launch Constraints(Excluding Range Safety)

Launch management must decide whether to waive any unavailable Required asset.

The OPR shall not call a hold for loss of Required asset after T-4 (unless pre-coordinated by the Mission Management Team)


S c required assets for launch excluding range safety
S/C Required Assets for Launch Constraints(Excluding Range Safety)

Launch management must decide whether to waive any unavailable Required asset.



John f kennedy space center delta ii nls

Mission Rehearsal Agenda Constraints

10:00 a.m. Introduction Kennard/

Murphy

10:05 a.m. MDC Console Capabilities & Operations Lougheed

10:15 a.m. Mission Rehearsal Plan Kennard Console Notebooks

Communication Channel Summaries

Telephones

MDC Count Script

Communication Protocol Godin

10:20 a.m. Simulation Supervisor In-brief Post

10:30:00 a.m. Initiate MR Terminal Count Godin

12:05:00 p.m. T-0 (Planned)

12:07 p.m. Acquisition Assistance Messages

12:09 p.m. Post-Rehearsal Critique Kennard/

Post/All


John f kennedy space center delta ii nls

Mission Rehearsal Focus Constraints

  • MDR objective is to exercise the ability of the Launch Management Team to communicate effectively in a simulated Launch Countdown environment

  • MDR will exercise the Anomaly Resolution process through the use of “GREEN CARDS”

  • Primary focus will be on Launch Management and Spacecraft Team performance for Integrated Anomaly Resolution


John f kennedy space center delta ii nls

Mission Rehearsal Process Constraints

  • GREEN CARDS generated by Rehearsal Assessment Team (RAT) and classified as “RAT EYES ONLY”

  • GREEN CARD will be distributed to console operator by member of RAT or will be called into play by a member of the RAT

  • MDR will be controlled by Simulation Supervisor (SIM SUP) on Launch Ops NET

  • SIM SUP can suspend or stop Anomaly discussion by calling “KINGS X”

  • Real World Anomalies/Issues take priority over simulation


John f kennedy space center delta ii nls

MDC Count Script ConstraintsTHEMIS Mission Rehearsal


John f kennedy space center delta ii nls

MDC Count Script ConstraintsTHEMIS Mission Rehearsal


John f kennedy space center delta ii nls

MDC Count Script ConstraintsTHEMIS Mission Rehearsal


John f kennedy space center delta ii nls

Launch Day Script Constraints


John f kennedy space center delta ii nls

MDC Count Script ConstraintsTHEMIS Launch Day


John f kennedy space center delta ii nls

MDC Count Script ConstraintsTHEMIS Launch Day


John f kennedy space center delta ii nls

MDC Count Script ConstraintsTHEMIS Launch Day


Range calendar and remaining meetings
Range Calendar Constraintsand Remaining Meetings


Eastern range operations schedule
Eastern Range ConstraintsOperations Schedule

Jan/Feb/Mar 2007

SUN

MON

TUE

WED

THU

FRI

SAT

2

1

31

28

29

30

3

FEBRUARY

JANUARY

4

9

10

5

6

7

8

15

17

11

12

13

14

16

Delta II

THEMIS

18:08 – 18:26 EST

18

19

20

21

22

23

24

HOLIDAY

25

26

27

28

1

2

3

MARCH

X Range Configuration / Range Conflict

\\ Additional Launch/Landing Attempt(s) HOLIDAY

\ Configuration Hold


John f kennedy space center delta ii nls

THEMIS Constraints

Launch Meetings Schedule

  • Mission Dress Rehearsal (MDR) Feb 13, 10:00 AM Operational Stations

  • Pre-Launch Winds Briefing Feb 14, 8:00 AM O&C Mission Briefing Room

  • Launch Readiness Review (LRR) / Feb 14, 9:00 AM Certificate of Flight Readiness (CoFR) O&C Mission Briefing Room Signing

  • 45th Wing Launch Readiness Review Feb 14, 11:00 AM

  • (Limited Attendance) ROCC Rm 106

  • Pre-Launch Press Conference Feb 14, 1:00 PM

  • KSC News Center

  • Launch Countdown Feb 15, 2:00 PM

  • NASA Management On-Station Operational Stations