1 / 9

Date: 2013-10-20

P802.11af Report to EC for Approval to forward draft to RevCom. Date: 2013-10-20. Authors:. Introduction. This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11af Draft 6.0 to RevCom.

tasya
Download Presentation

Date: 2013-10-20

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P802.11af Report to EC for Approval to forward draft to RevCom Date: 2013-10-20 Authors: Rich Kennedy (self)

  2. Introduction • This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11af Draft 6.0 to RevCom. Rich Kennedy (self)

  3. Sponsor Ballot Results – P802.11af Rich Kennedy (self)

  4. 802.11 WG Sponsor Ballot Comments – P802.11af Rich Kennedy (self)

  5. Unsatisfied Technical comments by commenter *Assumed unsatisfied, no response to emails to commenter Rich Kennedy (self)

  6. Unsatisfied Editorial comments by commenter Rich Kennedy (self)

  7. Unsatisfied comments • The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: • Double click on the icon to the right to open this. • A copy of this same data presented using MyBallot access database report format is attached. • Double click on the icon to the right to open this. Rich Kennedy (self)

  8. Mandatory Coordination Rich Kennedy (self)

  9. TGaf Timeline * The revised RevCom submission will be submitted 25 days prior to the SB meeting, according to RevCom policy section 6 Rich Kennedy (self)

More Related