  1. DDS SWIMMING POOLS CONSTRUCTED AND REPAIRED ALL COMPLETE CONSTRUCTION WORK GUARANTEED

  2. POOL REPAIR AND REMODELLING Remove tiles Repair pool Re-model steps Fibreglass

  3. REMOVE TILES TO LOCATE PROBLEM

  4. WATER SEEPS BEHIND TILES AND CAUSES EROSION

  5. HOLES FORM AND THE POOL LOSES LARGE AMOUNTS OF WATER DAILY

  6. ALL TILES REMOVED READY TO RE-SKIM

  7. STEPS ARE RE-SHAPED

  8. SKIMMED AND READY FOR THE TILE BAND

  9. TILE TOP EDGE NOW COMPLETE READY TO FIBREGLASS

  10. FIBREGLASS ON THE WALLS BEGIN

  11. FIBREGLASSING THE WALLS AND FLOOR

  12. POOL COMPLETED AND FILLED WITH WATER

  13. Complete new build TAKEAPPROXIMATELY 6 - 8WEEKS FROM START TO FINISH DEPENDING ON SIZE AND SHAPE OF POOL REQUIRED

  14. Ground dug out ready for block work

  15. Outer block wall constructed

  16. Inner block wall with steel rod reinforcement

  17. Pool and steps rendered

  18. Tile top edge

  19. Fibre work begins on walls and steps

  20. Fibre work complete

  21. Pool finished and ready for water

  22. Pool full of water Diving board fitted

  23. Fibreglass over tiles – pool repair

  24. This process is used when customers have a leak in their pool floor/walls but do not want to remove tiles.

  25. PLEASE SPEAK TO US.WE OFFER FREE ADVICE ON THE CONSTRUCTION, REPAIR AND MAINTENANCE OF SWIMMING POOLS.

  26. WE CAN ALSO DESIGN AND CONSTRUCT YOUR PATIOS AND BANTABAS FOR OUTSIDE LIVING