An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM FolweniManase Branch

  2. Phase IErecting the steel structure with roof and isolated ceiling.

  3. The vacant site in Manase (Adams Mission)

  4. The Team from Gauteng arrivesThe off loading begins

  5. Like puzzle pieces... The components of the structure is laid out

  6. The first sections are made to stand

  7. Making great progress. The roof about 80% completed!

  8. Now for the last finishing touches

  9. The view from inside

  10. Phase IIAdding the side pannels (shade netting) • During the next two weeks we will be preparing the temporary side pannels made of sheet netting. These pannels will be added on all sides of the structure and will basically work like window blinds.

  11. Phase IIIFloor slab • The local church will start raising funds to pour the floor slab. In the meanwhile the ground will just be levelled completely and compacted. This will allow them to use the church even without the cement floor being in place.

  12. Phase IVBuilding the permanent outer walls. • The last phase will be the building of permanent outer walls. Funds will be raised to buy building blocks for this purpose

  13. A vision of the future