Joint Exchange / Interop Work Group Test Workgroup

Joint Exchange / Interop Work Group Test Workgroup. John Donnelly /Eric Heflin/Judith Hutman. Aug 29, 2012. Roll. Agenda. Roll Call – Cayla Announcements – John Pilot Status - Eric Pilot Support – Judith / Ed Direct harmonization recap – Judith / Joe Test execution status – Judith

Download Presentation

Joint Exchange / Interop Work Group Test Workgroup

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012

  2. Roll

  3. Agenda • Roll Call – Cayla • Announcements – John • Pilot Status - Eric • Pilot Support – Judith / Ed • Direct harmonization recap – Judith / Joe • Test execution status – Judith • soapUI demo – David • Open Discussion – All • Wrap Up/Schedule Review - John

  4. Announcements • Harmonized PD/QD/RD/MP/AF (aka Patient Record Lookup) Tests Were Ratified Last Week • http://exchange-iwg.wikispaces.com/Test+Artifacts+Harmonization • Pilot processes to be conducted in Sept • CTB RFP • Focused discussions with respondents for test tool clarifications • Evaluations and contract discussions are still under way

  5. Harmonized PRL (PD/QD/RD/MP/AF) Pilot Status • Today (Wed 2012/8/29) we released process documents for the pilot • Documentation includes • Test Process Guide • Testing Toolkit User’s Guide • Test Execution Guide: PD-QD-RD • Test Execution Guide: Messaging Platform & Authorization Framework  • Also we’ve created a pilot charter document

  6. Harmonized PRL Pilot Status (continued) • The pilot has been defined as having two distinct phases • Current phase which is to review and prepare • Next phase which is to engage with the CTB and execute the pilot proper • Several organizations are moving forward • We need your help! • IWG and Exchange members • Vendors • Others

  7. Pilot Charter Document Review • Intro to pilot • Purpose • Scope • Approach and the “Ask”

  8. ONC Test Team Update Pilot Support Direct Harmonization Recap Test Execution Status soapUI Demo

  9. Pilot Support

  10. Artifacts Delivered • Documentation • Test Process Guide • Testing Toolkit User’s Guide • Test Execution Guide: PD-QD-RD • Test Execution Guide: Messaging Platform & Authorization Framework • Test Scripts • soapUI scripts for high priority test cases

  11. Direct Harmonization: Recap

  12. Test Approach:Direct only v. Internal actors Internal Actor Messaging Direct Messaging

  13. Internal Actor Testing FR-3 HISP to SMTP Receiver FR-2 SMTP Sender to HISP FR-7 SMTP to SMTP FR-5 HISP Sender to HISP Receiver Direct Messaging

  14. Modular ApproachSample Analysis: Edge Protocol EHR-HIE Test Spec FR-2

  15. FR-2: SMTP Sender to HISP * Internal actors specified * Send XDR not proscribed in Direct specs

  16. FR-2: Applying a Modular Approach Direct Messaging XD Conversion Cert Discovery Deplmnt B Reqts Deplmnt X Reqts Deplmnt A Reqts B1 X1 FR2 B2 A2 X2 DM1 DM2 CD1 XD1 XD2 CD2 DM3 CD3 XD3 B3 A3 X3 Event-Based Interop Testing EHR-HIE ApplicantProduction Participant FR2 DM1 CD1 FR-2 SMTP to HISP DM2 CD3 A2 DM3 CD2 A3

  17. Modular ApproachSample Analysis: NormativeEHR-HIE Test Spec FR-5

  18. FR-5: HISP Sender to HISP Receiver via S/MIME

  19. FR-5: Applying a Modular Approach Direct Messaging Cert Discovery XD Conversion Deplmnt B Reqts Deplmnt A Reqts Deplmnt X Reqts B1 FR1 X1 B2 X2 A2 DM1 DM2 CD1 XD1 XD2 CD2 DM3 XD3 CD3 B3 X3 A3 Event-Based Interop Testing EHR-HIE ApplicantProduction Participant FR1 DM1 CD1 DM2 CD3 A2 FR-5 Sending HISP to Receiving HISP CD2 A3 DM3

  20. Test Execution Status

  21. Automating Test Case Execution: soapUI scripts complete NEW NEW

  22. soapUI Demo

  23. Open Discussion

  24. Schedule Review • RFP released — July 2nd  • Questions received by 6 organizations • Answers distributed — July 13th • Bids due — July 20th • Evaluating • Expected award — Early Sept • Contract start — TBD We are here (running late)