CEO Report December 4, 2013 Peak Reliability IBC – Salt Lake City. Gary Stephenson President and CEO. Agenda. Bifurcation update Compliance Enforcement Authority (CEA) transition International Alberta Electric System Operator (AESO) and British Columbia (BC) Hydro

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Gary Stephenson President and CEO' - taniel


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
ceo report december 4 2013 peak reliability ibc salt lake city
CEO Report

December 4, 2013

Peak Reliability IBC – Salt Lake City

Gary StephensonPresident and CEO

agenda
Agenda
  • Bifurcation update
  • Compliance Enforcement Authority (CEA) transition
  • International
    • Alberta Electric System Operator (AESO) and British Columbia (BC) Hydro
    • Comisión Federal de Electricidad (CFE)
  • GridExII
agenda1
Agenda
  • Internal metrics
  • Value add services
  • New grant from U.S. Department of Energy (DOE)
  • Funding
bifurcation update
Bifurcation Update
  • Peak Human Resource and Finance Directors hired and in place
  • Transfer and division of key business contracts is underway and on schedule
  • Peak staff transition from WECC and benefit enrollment complete
  • FERC approval of 2014 Peak Business Plan and Budget
  • Significant outreach informing development of value proposition
cea transition
CEA Transition
  • Peak RC Certification
    • Scheduled March 2014
  • Self Assessment
    • 43 Reliability Standards applicable to the RC
    • 34 Reliability Standards have been assessed
    • The 9 remaining will be completed within the next two weeks
    • Self Reports will be submitted to NPCC for any possible violations found
international agreements canada
International Agreements - Canada
  • AESO: Continue to negotiate reliability coordination agreement
    • Start date – January 1, 2014
    • Goal is no degradation of wide area view
    • Fee structure is unresolved
  • BC Hydro: Parties seek to restructure relationship
    • BCH continues within Peak RC area
    • Reduced fees in exchange for reduced services
    • Maintain or enhance current level of reliability
international agreements mexico
International Agreements - Mexico
  • CFE: Peak expected to provide RC services to CFE after bifurcation
    • Parties have exchanged draft agreement
    • Fee structure is expected to carry over from WECC contract with CFE
    • Maintain or enhance current level of reliability
gridex ii
GridEx II
  • Recent continent-wide table-top exercise focused on cyber and physical attacks on bulk electric system
  • RC partnered with CAISO and WAPA
  • Positive feedback from NERC on RC’s role as central communications hub in the west
  • Written report by NERC due next month
internal metrics
Internal Metrics
  • Visits with MISO, PJM, and NYISO to benchmark best practices for RC specific metrics
  • 2014 - focus on developing and implementing internal metrics
  • Relevance and value of selected internal metrics will be assessed before embedding into performance and/or incentive targets.
value added services
Value Added Services
  • Hosted Advanced Applications
  • External metrics
  • EMS-centric services for northwest Energy Imbalance Market (EIM) project
  • Southwest Reserve Sharing Group
potential doe grant
Potential DOE Grant
  • Submitted a new grant proposal to DOE ─ “Realizing the WISP Potential”
  • Two-year “Research and Demonstration” grant
  • Proposed grant has four primary objectives:
    • Data Quality Management;
    • Correlation of Measurements with Interconnection Behavior and Performance;
    • Integrating Application Results with Operation Procedures; and
    • Data Delivery Efficiency Improvements.
potential doe grant1
Potential DOE Grant
  • Partnering with:
    • BPA, SCE, IPC and CAISO, SDG&E
    • Software vendors: Alstom Grid, V&R Energy and Grid Protection Alliance
    • Research Organizations: T&E Consulting and University of Wisconsin
  • Peak cost-share commitment $200k (out of a total cost-share of all participants of $7.6 million)
  • Proposed total program $13.8 million
funding
Funding

{later in the agenda}