An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Panama Canal Expansion ProgramDredging Info Conference Jorge L Quijano Engineering & Program Administration March 4,2008

  2. ACP Projects Other Projects Port of Cristobal Panama Ports Company* Telfers Petroleum Terminal Promotor: Chemoil Atlantic Internal Anchorage ACP by Contract Dredging: 14 M m3 Atlantic Entrance ACP by Contract Dredging: 14 M m3 RFP Issued: May 2009 Geological Investigations: April 2008  Gatun Lake ACP by Contract Aprox. 4.5 M m3 Culebra Cut ACP with Hired Equipment Aprox. 2.2 M m3 North Gatun Lake ACP by Contract Dredging: 7.6 M m3 Start: March 2009 Port of Balboa Panama Ports Company* New Pacific Locks Access ACP by Contract Dredging: 3.2 M m3 + Plugs: 1.0 M m3 Start: June 2009 End: June 2011 Pacific Entrance ACP by Contract Dredging: 9.1 M m3 RFP Issued: August 30, 2008 Award: March 2008 PSA Panama International Terminal Dredging: 1.4 M m3 Start: May 2008  Farfán Palo Seco Container Terminal Project Dredging: 14 M m3 Fill: 14 M m3 Start: end of 2008  NOTE: The information contained in this presentation shall be understood exclusively as reference for activities to be carried out in the future, and does not include final figures or indicate a commitment by the ACP.    