AFE IIt Project Status. Current Status . AFE II Prototype Testing Complete Detailed ch by ch testing has been done 3071 good channels out of 3072 through comprehensive test Continuing with some long-term (weeks) testing of cryo control and stability on the VLPC CC cryostat

Related searches for AFE IIt Project Status

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'AFE IIt Project Status' - tan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Current status l.jpg
Current Status

  • AFE II Prototype Testing Complete

    • Detailed ch by ch testing has been done

      • 3071 good channels out of 3072 through comprehensive test

    • Continuing with some long-term (weeks) testing of cryo control and stability on the VLPC CC cryostat

  • Packaged TriPt (MOSIS) in house

  • TriPt/FPIX submission - OUT

  • Design input for AFE IIt board finished

  • Schematic Complete – 6/20 4 weeks behind - but

  • Layout Complete – 6/28 about 2 weeks behind

    • We have authorized OT and it is being used

    • Will try to add a second Layout tech towards the end. For technical reasons this is not appropriate at this time

  • Only issue

    • Could use 1 additional person to work on FPGA programming




Current status tript l.jpg
Current Status - TriPt

  • Out for Fab

Proposed reticule layout

for TriPt/FPIX

Proposed wafter map

70 reticules




Current status tript8 l.jpg
Current Status - TriPt

  • TriPt:

    • Packaged “MOSIS” parts are here

    • Robot tester work progressing: adapter board in layout (estimate: 1 week)

    • Mechanical parts for robot complete


Response to recommendations from director s review l.jpg
Response to Recommendations from Director’s Review

  • We have modified the project plan to include:

    • A second submission of the TriPt chip

      • This, of course, does produce a delay in the project completion. The funds are there if needed, however

      • We believe that the probability for a successful run is very high

    • Production of 350 boards.

    • Over time for layout technician(s) for AFE IIt board

  • Bob Demaat has joined the AFE IIt project as L2 production manager

  • Weekly reporting will occur via the AFE IIt production meeting with progress and schedule status from the L3 managers written up and published as minutes of this meeting


Milestone list with 2 nd tript submission l.jpg
Milestone List with 2nd TriPt submission

  • AFE II/TriPt Project Start 1/5/04

  • AFE II Prototype Testing Complete 5/12/05

  • AFE IIt Layout Complete 6/17/05

  • Ready for Production TriPt Testing 7/18/05

  • AFE II Prototype Under Test 7/18/05

  • Certify for Production 10/13/05

  • TriPt Production Started (Round 1) 5/20/05

  • TriPt Production Started (Round 2) 10/31/05

  • TriPts Ready for Board Stuffing 3/6/06

  • AFE IIt pre-Production Board under Test 3/20/06

  • Certify for Full Production 4/19/06

  • Board Assembly Complete 6/29/06

  • First Crate Ready for Installation 7/13/06

  • 203 Boards Ready 8/10/06