H2 Layout for EMU

Loading in 2 Seconds...

play fullscreen
1 / 5

H2 Layout for EMU - PowerPoint PPT Presentation


  • 117 Views
  • Uploaded on

H2 Layout for EMU. a brief report of a couple of visits by Darin A., Jay R., and FG. H2 Layout. PC#1 plus add’l rack space. more rack space + room for desks. TTCmi/ex. gas pad. beam. H2 beam dump. ME1/1. ME1/1. HCAL. magnet. preferred location of CSCs.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'H2 Layout for EMU' - tamas


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
h2 layout for emu

H2 Layout for EMU

a brief report of a couple of visits by Darin A., Jay R., and FG

h2 layout
H2 Layout

PC#1 plus

add’l rack space

more rack space

+ room for desks

TTCmi/ex

gas pad

beam

H2 beam dump

ME1/1

ME1/1

HCAL

magnet

preferred location of CSCs

  • Available rack space in Bats. HNA360, 363 and possibly 370 (TTC)
  • Desk space available in Bat. HNA363
  • fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360.
  • Fast and wireless networks available
  • Gas lines and hook-ups available
  • need to add multiple concrete blocks for the CSC constellation

H2 Layout for EMU

main csc location
cable traymain CSC location

an artist’s impression …

concrete block

need more of those …

H2 Layout for EMU

gas hook ups
Gas hook-ups

gas pad

patch panel

  • Available space on the mezzanine gas pad
  • Available (and labeled) gas lines
  • Patch panels in the beam area

H2 Layout for EMU

open issues
Open Issues
  • ME1/1 location
    • directly behind HCAL
      • quantify punch through, but at higher rates?
      • timing issue?
      • PC location likely to be inside the beam area.
    • in conjunction with the other 3 chambers
      • similar set-up as previous EMU Slice Test
      • compact set-up beneficial for timing
  • TTC setup
    • install 6U crate close to TTCmi (HN370)
      • use fast cables
    • split fiber signal and install TTC crate in HN360
  • Safety requirements regarding the “CSC floor”
    • too many concrete blocks may block access to a search box behind the beam dump