tugasan pjj n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Tugasan PJJ PowerPoint Presentation
Download Presentation
Tugasan PJJ

Loading in 2 Seconds...

play fullscreen
1 / 17

Tugasan PJJ - PowerPoint PPT Presentation


  • 105 Views
  • Uploaded on

Tugasan PJJ. MGM 4139. PepsiCo Mission Statement.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Tugasan PJJ' - tamara-burgess


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
tugasan pjj

Tugasan PJJ

MGM 4139

pepsico mission statement
PepsiCo Mission Statement

PepsiCo’s mission is to increase the value of our shareholders’ investment. We do this through sales growth, cost controls, and wise investment resources. We believe our commercial success depends upon offering quality and value to our consumers and customers; providing products that are safe, wholesome, economically efficient and environmentally sound; and providing a fair return to our investors while adhering to the highest standards of integrity.

internal analysis ife
Internal Analysis (IFE)

Gateway has a total weighted score of 2.85 indicating that the firm is above average in its overall internal strength

internal factor evaluation ife
Internal Factor Evaluation (IFE)

3)Assign 1-4 rating to each factor

  • 1: major weakness
  • 2: minor weakness
  • 3: minor strength
  • 4: major strength

4) Multiply each factor’s weight by its rating

  • Produces a weighted score
industry analysis efe cont d
Industry Analysis (EFE) (Cont’d)

In the example, the cinema has a total weighted score of 2.58 indicating that the firm is above average indicating that the company is quite effective in taking advantage of the external opportunities and avoiding the threats it faces.

However, there is room for improvement. Example: the company may need to address factors given rating 1 (both in the threats and opportunities).

part 7
Part 7
  • From the IFE and EFE Matrix, construct the SWOT Matrix (shown in the next slide).
part 8 do either one of these analyses

SWOT Matrix

SPACE Matrix

Stage 2:The Matching Stage

BCG Matrix

IE Matrix

Grand Strategy Matrix

Part 8: Do either one of these analyses