development of a dss to support action at outbreaks n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Development of a DSS to support action at outbreaks PowerPoint Presentation
Download Presentation
Development of a DSS to support action at outbreaks

Loading in 2 Seconds...

play fullscreen
1 / 7

Development of a DSS to support action at outbreaks - PowerPoint PPT Presentation


  • 62 Views
  • Uploaded on

Development of a DSS to support action at outbreaks. Drafting and review process. Initial drafting considered: Outcomes/important factors highlighted by the EPPO Workshop on eradication, containment and contingency planning (Nova Gorica, Slovenia)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Development of a DSS to support action at outbreaks' - talon


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
drafting and review process
Drafting and review process
  • Initial drafting considered:
    • Outcomes/important factors highlighted by the EPPO Workshop on eradication, containment and contingency planning (Nova Gorica, Slovenia)
    • EPPO PM9/10 Generic elements for contingency plans
    • ISPM No. 9 Guidelines for pest eradication programmes
    • The review of eradication and containment campaigns (5.1): Therese Pluess et al.
    • UKNon-Native Risk Analysis Scheme (UKNNRA) developed by a consortium of GB institutes
development of the dss
Development of the DSS
  • Over the consultation process – evolved into a checklist type scheme.
  • However, other school of thought was that quantitative/semi quantitative approach was useful and was necessary to fit the remit of WP5.3
  • A 1-day small Panel meeting was held with pest risk managers at EPPO HQ in February to resolve fundamental aspects of the DSS approach.
  • The draft was developed further at the Windsor Pratique meeting in March, following which it was sent for a consultation and testing phase.
  • The new draft is intended to be a generic, semi quantitative guide to appraise the feasibility of control measures
dss approach 3 components
DSS approach: 3 components:
  • 1. Appraisal of key feasibility factors to aid decision making for candidate measures
  • Includes Persistence; re-invasion; pathways, spread and biological characteristics; time; delimitation; practicalities / operational factors; enforcement and compliance
2 a comparison matrix
2. A comparison matrix
  • This is to develop aspects of feasibility, efficacy, costs and safety.
3 guidance for decision making steps
3. Guidance for decision making steps
  • Uses simple guidance tables to aid with the appraisal process in both the feasibility section and comparison matrix.
work plan to complete the dss
Work plan to complete the DSS
  • The Pratique breakout discussions in September will finalize the DSS draft. Pest risk managers will run further pest examples through the scheme
  • Final refinement and drafting to form a user friendly layout and functionality
  • Final testing will be carried out at the EPPO Workshop on Eradication (26-28th Oct) in Trévise (IT) for final validation