1 / 8

EAF Mobile Facilities (Ie Shima Island)

EAF Mobile Facilities (Ie Shima Island). QHR205 (please note: This is a MALS-36 MF CSC failure, beyond Repair capability.). ISO corners delaminating and coliflowering. . ISO corners delaminating and coliflowering. . QHR205. Bottom side rail damage/deteriorated by corrosion. .

tab
Download Presentation

EAF Mobile Facilities (Ie Shima Island)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EAF Mobile Facilities (Ie Shima Island)

  2. QHR205(please note: This is a MALS-36 MF CSC failure, beyond Repair capability.) ISO corners delaminating and coliflowering. ISO corners delaminating and coliflowering.

  3. QHR205 Bottom side rail damage/deteriorated by corrosion. Cracked ISO corner due to corrosion damage.

  4. QHR205 Forklift pockets deteriorated beyond repair capability. Brittle to the touch. (All forklift pockets are in the same condition.

  5. QHR171 (please note: This is a NADEP MF CSC failure, beyond Repair capability.) ISO Corner Coliflowering.

  6. QHR171 Corrosion damage on side rail (structural member). ISO Corner Coliflowering.

  7. QHR171 ISO Corner Coliflowering.

  8. QHR171/QHR205Please note: More pictures are available if needed.

More Related