Case Study – When Single cable was found hotter than 3 core cable

Case Study u2013 When Single cable was found hotter than 3 core cable

Download Presentation

Case Study – When Single cable was found hotter than 3 core cable

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO 9001:2015 ISO 45001:2015 (OH & S) Certified Company Case Study When Single cable was found hotter than 3 core cable www.systemprotection.in +91-265-2225137

  2. Beingintheservice, wealwaysusedtoget variouscallsregardingproblemintheir plants. However, theywereluckythatthis problemdidn’toccuronSundayorHoliday (Majorityofthebreakdownoccurredon thosedaysonly). Jokesapart, wegotthese callthat, theirpowercableisgetting heatedup. Wetookfewdetailsoncalland askedforphotos. Theclienthad3RX3CX185SQMM, XPLE ArmouredCablewiththeearthingbraid connectedtotheearthbus-baratboth endsofthecable. Cableterminationwasas perdrawingshows. Inabovefigureconsiderthenomenclature asC1RisR-PhofthefirstCablerun, C2Yis Y-PhoftheSecondCablerunandso-on. Aftersomemaintenanceactivityandsome consideration, theyhavereconnectedthe cablesfrombothendasfollows: Inaboveconnection, clienthasterminated allcoresoftheFirstruntoR-Ph, Secondrun toY-PhandThirdruntoB-Ph. Thiswas doneconsideringthattherearethreecable ofthesamesizeandfinalcross-sectionarea providedbyreachcabletoeachphase remainssame. Afterobservingtheinstallationofthe cables, itwasconcludedthatallthecables armourswereconnectedtotheglandplate withEarthingBraidsatboththeends. Thedifferencebetweenfirstinstallationof thecableandthelaterinstallationofthe cableisthat, infirstinstallationduetothe three-phasecoreareinonecable, resultant fluxlinkagetothearmourisnull. Afterputtingtheaboveconnectedcablesin service, andwiththetimelapsed, clienthas foundthattheGlandPlateisgetting carbonizedatGlandsduetoheatingup. www.systemprotection.in +91-265-2225137

  3. Whereasinthelatercase, eachthree-phase cableservesasasinglecorecableandflux linkagetothearmourgeneratesEMF. This EMFinturngeneratedcirculating/eddy currentsinarmouroncetheclosecircuitis formed. InLatercasethisclosedcircuitis formedthroughArmour – EarthingBraidat oneend – Earthing – EarthingBraidatother end – Armour. Duetothiscontinuously flowingCirculating/eddycurrentinPlates, it isheatedupandcarbonizingisobserved. Suchkindsofproblemarereportedmorein singlecorecableof11 / 22 / 33kV, where, by mistakeorunknowingly, engineersconnect earthingbraidwithearthingatbothends. Thus, itisrecommendedtoearthonlyone endofsinglecorearmouredcable. Wehope, thiscasestudywillhelpandifyou haveanysuggestionsdoletusknow. Solutiontotheproblemisthat, anyhowwe havetoopenthisclosedcircuit. Wecando thatbydisconnectingOneearthingbraid withearthatanyendoftheCable. www.systemprotection.in +91-265-2225137

  4. CONTACT INFORMATION 301/2/306, SilverlineComplex,OppositeBBC Tower,Sayajigunj,Vadodara - 390005, Gujarat, India. bdm@systemprotection.in www.systemprotection.in +91-265-2225137