FHWA VERTICAL CONSTRUCTION SCAN

FHWA VERTICAL CONSTRUCTION SCAN. Jerry R. Blanding, J.D., Innovative Contracting Engineer, Federal Highway Administration. AASHTO Highway Subcommittee on Construction: 2005 Summer Meeting. PRESENTATION OUTLINE. Study Objectives Methodology Findings Recommendations. STUDY OBJECTIVES.

swann
Download Presentation

FHWA VERTICAL CONSTRUCTION SCAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FHWA VERTICAL CONSTRUCTION SCAN Jerry R. Blanding, J.D., Innovative Contracting Engineer, Federal Highway Administration. AASHTO Highway Subcommittee on Construction: 2005 Summer Meeting

  2. PRESENTATION OUTLINE • Study Objectives • Methodology • Findings • Recommendations

  3. STUDY OBJECTIVES FHWA asked CERF to: • Conduct study and scan tours to identify technologies and processes employed in the vertical building construction industry that will enhance construction and life-cycle performance for highways and bridges. • The premise is that sectors can learn from other sectors.

  4. METHODOLOGY • STEERING COMMITTEE • DISCUSSION FRAMEWORK DOCUMENT • INTEREST PROFILES • MEETINGS IN THREE METRO AREAS • New York City, NY • Chicago, IL • Los Angeles, CA • COMMUNICATION & COLLABORATION • Conference Calls • E-mail • eRoom • FINAL REPORT • OPTIONAL WORKSHOP TO DISCUSS IMPLEMENTATION

  5. SCAN TEAM • FHWA • Ian Friedland, P.E., Team Leader - Office of Infrastructure • Jerry Blanding, J.D. - Innovative Contracting Engineer • Gary L. Brown, P.E. - Eastern Federal Lands Highway Division • Bob Kogler- Turner-Fairbank Highway Research Center

  6. SCAN TEAM • FHWA (Continued) • Dr. Cheryl Allen Richter, P.E. -Highways for LIFE Program • Charles J. Churilla, P.E. - -Highways for LIFE Program • Dan Sanayi, P.E. - Office of Asset Management

  7. SCAN TEAM • STATE HIGHWAY DEPARTMENTS • Don Arkle, P.E., Alabama DOT • Steve DeWitt, P.E., North Carolina DOT • David Hohmann, P.E., Texas DOT • M.G. Patel, Pennsylvania DOT • NACE • Alan Forsberg, P.E. • AASHTO • Cameron Kergaye, P.E.

  8. SCAN TEAM • OTHERS • Jon Magnusson, P.E., Magnusson Klemencic • John Dick, PCI • CERF STAFF • Michael Goode, P.E., P.M.P., Project Manager • Dr. Amar Chaker

  9. NEW YORK CITY • HOSTED BY WEIDLINGER ASSOCIATES, INC. • LOCAL LEADER: DAVID PALMER, ARUP • PRESENTATIONS • Jim Lammie, Parsons Brinckerhof • Jeremy Isenberg, Weidlinger Associates • Jon Magnusson, Magnuson-Klemencic • Charles DeBenedittis, Tishman-Speyer

  10. Dave Palmer, ARUP • James Dall, New York Dormitory Authority • David Scott, ARUP • Nancy Hamilton, ARUP • LUNCH SPEAKER: Frank Lombardi, Port Authority of New York and New Jersey

  11. FIELD TRIP • Jamaica Station Air Train – John Reed, Bechtel • Kennedy Airport Terminal 4 – Nancy Hamilton, ARUP • NY Times Building Mock-up – Glen Hughes, New York Times

  12. CHICAGO • HOSTED BY SOM • LOCAL LEADER: WILLIAM BAKER, SOM • PRESENTATIONS • Bill Moody – The John Buck Company • Harry Walder – Walsh Construction • Ross Wimer – SOM • John Zils – SOM

  13. Alice Hoffman, Hoffman Management Consultants • Mark Simonides, Turner • Joe Burns, Thornton Tomasetti • Joe Dolinar, Lohan Caprile Goettsch • John Padoven, Bentley Systems, • Kristine Fallon, Kristine Fallon Associates, Inc • LUNCH SPEAKER: Dr. Henri Petroski

  14. FIELD TRIP • Soldier Field (Joe Burns, Thornton- Tomasetti) • 1 S. Dearborn (HKSE)

  15. LOS ANGELES • HOSTED BY DMJM-HARRIS (AECOM) • LOCAL LEADER: Ed MCSPEDON, HNTB • PRESENTATIONS • Robert Parkridge, Seismic Structural Design Associates • Owen Hata, Nabih Youssef Associates • William Cook, URS • Matt McDole, E-470 Public Highway Authority

  16. Ed McSpedon, HNTB • Gerry Seelman, DMJM-HARRIS (AECOM) • Dr. Frankie Banerjee • Tim Buresh and Jim Connell, Los Angeles Unified School District • LUNCH SPEAKER: Gil Garcetti

  17. FIELD TRIPS • Frank Gehry Partners Studio • Los Angeles Cathedral • Caltrans District 7 Headquarters • Walt Disney Concert Hall

  18. PREVIEW OF FINDINGS • “NUGGETS” IN 15 AREAS • Use Technology More Effectively (web-based project management, 3D, 4D) • Early Contractor Involvement • Risk • Ownership of Process – Roles and Responsibilities • Aesthetics • Marketing and Communications • Project Management

  19. PREVIEW OF FINDINGS (Continued) • Process Flexibility – Value Engineering • Busting Barriers • Streamlining • Building Business Model – Financing • Procurement • Scope Definition – Quality • Lifecycle Considerations • Insurance Impact

  20. STAY TUNED! • FINAL REPORT SUBMITTED JUNE 20, 2005 • AN OPTIONAL WORKSHOP TO DISCUSS IMPLEMENTATION IS BEING CONSIDERED

  21. QUESTIONS?