1 / 8

Latest News of the PHELIX Control S ystem

Latest News of the PHELIX Control S ystem. Stefan Götte PHELIX GSI Helmholtzzentrum für Schwerionenforschung GmbH CS-Workshop Helmholtz-Institut Jena February 9 th , 2012. P etawatt H igh E nergy Laser for Ion E x periments in operation as user facility since 2008

sugar
Download Presentation

Latest News of the PHELIX Control S ystem

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Latest News of the PHELIX Control System Stefan Götte PHELIX GSI Helmholtzzentrum für Schwerionenforschung GmbH CS-Workshop Helmholtz-Institut Jena February 9th, 2012

  2. Petawatt High Energy Laser for Ion Experiments in operation as user facility since 2008 providing about 80% beamtime in 2011 typically 9hrs/day with ion beam: two shift operation a shotdirector and an operator per shift three experimental areas: Laserlab: up to 10J, 1 shot/2min Laserbay: up to 200J, 1 shot/1,5hrs Z6: up to 1kJ, 1 shot/1,5hrs the PCS is one of the largest CS applications PHELIX

  3. running on 20 nodes 17 PHELIX nodes one developer node two hardware test nodes OS: Windows XP LabVIEW 2009, CS-V3.21 32 executables (four types) 60 PHELIX classes about 15 for different hardware many Beckhoff applications about 2500 user VIs about 300 instances about 10000 process variables The PCS

  4. Sequencer 48 controls, 114 indicators 12 states (SM) 43 methods 401 user VIs Beamline 177 controls, 163 indicators 40 methods 309 user VIs PILS 16 controls, 203 indicators 16 methods 262 user VIs PCS: Working horses

  5. PSDB: How it works Start up Preparation Operation User PCS (DIM) Experiment, Shottype Shot Sequencer Sequencer Sequencer Method possible Experiments, Shottypes Experiment, Shottype Start Standby Data controller Data controller Data controller Shot ID Write! Status possible Experi- ments, Shottypes Device Device Device Device Device Device Device Device Device Shot ID Device ID Name Data Database Database

  6. Sequencer: the user selects an experiment, the shot type, and adds a comment Data controller: watches all instance data status distributes information from PSDB forces instances to send data to PSDB PSDB: How it looks like …

  7. Device: Constructor … … and Methods PSDB: … in reality

  8. PSDB: This is what you get …