An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNITING THE NATION’S ELECTRIC POWER GRID THE TRES AMIGAS SUPERSTATION WORLD WIDE EMERGING DEVELOPMENT IN HVDC 2013

  2. Common Interconnected AC System Problems Diminishing Returns with large interconnected AC Systems Long Distance Transmission • Line losses • System Voltage Stability/Levels • Reactive Power Loading • Steady state • Transient Stability • Subsynchronous Oscillations • Latency issues (ie Spinning Reserves) • Inductive and Capacitive limitation factors Interconnections • Uncontrolled Load flow problems and bottlenecks • Congestion Issues • Inter Area loop flow • Cascading Blackouts • Oscillation Stability • Frequency control • Voltage Stability • Physical interactions between power systems

  3. Common Interconnected AC System Problems High Cost of Interconnections • Reliability Costs: NERC, RC, Relaying • N-1 criteria often creates underutilization of transmission lines • Complex coordinating arrangements (RTOs, IA, JOAs, etc.) • Need for sophisticated and costly system impact studies • Participation agreement complications with multiple impacted entities • Regional/Subregional perturbations/phenomena difficult and costly to analyze and manage • Deterministic planning practices do not capture the true economic value of transmission additions/upgrades

  4. ChinaPlans for Point to Point HVDC

  5. Friends of the Super Grid “a pan-European transmission network facilitating the integration of large-scale renewable energy and the balancing and transportation of electricity, with the aim of improving the European market”.

  6. MedGrid – Opening New lines for Sustainable Electicity “Sun and wind: SEMCs have limitless wind and solar energy potential. The MSP, launched in November 2008, aims to install 20 Gigawatts (GW) of new generation capacity by 2020.”

  7. South American HVDC projects in operation, construction or planned Under Planning Manaus - Roraima – Venezuela 600 MW – 400 kV Under Planning: Colombia – Panama 600 MW – 400 kV Under Planning: B Monte Tapajos 2x 4000 MW 800 kV Under Planning: Central - North 1000 MW – 500 kV Under Construction: Rio Madeira 2x 3150 MW 600 kV Under Planning: Chile - Argentina 2000 MW – 500 kV In operation: Itaipu 2x 3150 MW 600 kV Under Planning: Central - South 2000 MW – 500 kV In Oeperation: Garabi 2x 1000 MW BtB In Oeperation: Rivera 70 MW BtB Under Construction: Melo 500 MW BtB Under Planning: Brazil – Uruguay 500 MW BtB

  8. Friends of the Super Grid Quote: • "Supergrid" is the future electricity system that will enable Europe to undertake a once-off transition to sustainability. • “The full significance of a switchable HVDC innovation has not yet been appreciated by policy makers or by the business community. It is clear that a network incorporating a HVDC grid with the redundancy and reliability of current AC grids is now a reality and that the limits of what is technologically possible have been greatly expanded.” • “HVDC technology will open markets, strengthen security of supply and create another global opportunity for European companies to export sustainable energy technology. The technology underpinning the Supergrid will give competitive advantage to the companies involved with its specification and design. This type of integrated AC/DC grid will be a template for what will be needed in other global markets including the US and China.”

  9. Alstom Grid HVDC MaxSine Technology + V + V - V - V = chain link module • Voltage Sourced Converter (VSC) technology • Modular multi-level converter design • Control of real and reactive power flow into AC grids • Harmonic free output voltage • Ideal for use on weak AC grids VSC HVDC scheme

  10. Folded Back-to-Back Convertor Layout DC Bus Connections Provides for AC and DC HTS bus interconnections AC Bus Connections

  11. First Phase Scope of Construction

  12. Design

  13. Products & Services - How Will Customers Use TA Services?

  14. Products & Services - Operations Services Tres Amigas Operations can be mapped against a generic electricity market structure, illustrating TA Operations core functions – system operations, spot market operations and information services. Tres Amigas will most likely engage an established clearinghouse to support forward trading and clearing.

  15. Products & Services - Transmission Transmission service will be sold in blocks ranging from one to 20 years in duration, as well as on a seasonal, monthly, weekly, daily and hourly basis. 20 years Annual Monthly Daily Hourly Open Season Anchor Tenant Agreements Spot Sales (via Portal) AT Auction Annual Auction remaining available firm capacity after Anchor Tenant Agreements remaining available firm capacity after Anchor Tennant Agreements and Anchor Tennant Auction Any available long-term firm capacity Additional short-term firm capacity All non-firm capacity Secondary trading of previously purchased capacity Up to 50% of firm capacity FIRM SALES NON-FIRM SALES • Three distinct mechanisms will be used to sell transmission service: • Negotiated, long-term ‘Anchor Tenant Agreements’ • Competitive ‘open seasons’, mostly for annual service, but also including an initial ‘Anchor Tenant Auction’ for terms up to 20 years. • Web-based real-time portal, for non-firm and shorter-term firm capacity, with a duration less than one year (e.g. monthly, weekly, daily, hourly). • Additionally, the real-time portal will facilitate a secondary market for Tres Amigas customers to trade transmission capacity purchased previously.

  16. Funding – Tres Amigas Merchant Transmission Unlike traditional transmission facilities, merchant transmission project owners assume all market risk. Tres Amigas has been successful in receiving significant capital through investors and private placements. Phase II – III 1.5B Phase I 500 M 2015 2013 Phase II-III: construction& operations, Texas node, additional HVDC converters, facilities, and business infrastructure Preconstruction 12M Phase I: construction & operations, East/West transmission node, including HVDC converters, buildings and business infrastructure, EMS Operations 2012 Startup 8M Preconstruction: detailed engineering, vendor selection/contracts, product development, additional filings and detailed business plans. 2010 Startup: research, regulatory and local filings, ROW, preliminary engineering, environmental, economics and business plan. Concept 2M 2008

  17. Tres Amigas SuperStation…. Uniting the Electric Grid