1 / 91

Winter Storm 2004

Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain. Vehicles Sliding off Road State Highway 26 First Impact of Storm. Pickup Truck Off Side of Road BIA Route 33. Weather During Storm. Simnasho Fire Hall After Storm. Note Height of Piles of Snow Removed. Simnasho Longhouse.

Download Presentation

Winter Storm 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Winter Storm 2004

  2. 24” Snowfall20 Days of Freezing Rain

  3. Vehicles Sliding off Road State Highway 26 First Impact of Storm

  4. Pickup Truck Off Side of RoadBIA Route 33

  5. Weather During Storm

  6. Simnasho Fire Hall After Storm Note Height of Piles of Snow Removed

  7. Simnasho Longhouse Picture taken Jan 16, 2004

  8. Snowpile at Kahneeta Casino Parking Lot Picture taken Jan 16, 2004 Note Height of Snow Pile

  9. Entrance to Golf Pro Shop Picture taken Jan 20, 2004

  10. Detail of Sign at Entrance to Golf Pro Shop Kahneeta

  11. Sander and Plow Carries 7 CuYd. Sanding Material Cleans 60-100 miles of road per shift Removes loose snow and sands hazardous areas

  12. Snowplows in Equipment Shed

  13. Sanding Boxes in Shed Rear View of Dump Truck Plows

  14. Front of Snowplow Note Rubber Cutting Edge

  15. Detail of Rubber Cutting Edge

  16. Wheels to Keep Plow Above Roadway Located between Snowplow and Cab of Truck Two Wheels (One on left and right side of plow)

  17. BIA Route 24 Well Maintained Paved Road

  18. BIA Route 33 Well Maintained Aggregate Surface

  19. BIA Route 25 Seekseequa CanyonLittle Snow and Ice

  20. BIA Route 15 Snowplow Removal Only

  21. BIA Route 7 Snowplow Removal Over 2” Packed Snow and Ice (16+ days freezing weather)

  22. BIA Route 24 Over 2” Packed Snow and Ice

  23. BIA Route 27 Over 2” Packed Snow and Ice

  24. BIA Route 76 Over 2” Packed Snow and IceSteep Grades

  25. Sanding Shed After Storm

  26. Simnasho Cinder Pile After Storm

  27. BIA Route 4 Cinders in Shoulder Berms

  28. Junction Route 4 + 53Hollywood and Tenino Cinders in Melting Berms

  29. BIA Route 16 Paiute StreetCinders in Melting Berms on Side of Roadway

  30. Cinders Arriving to Replenish Stockpile

  31. Cinders DeliveredOutside Shed to Permit Drying

  32. Road Grader Leaving Shop to Clear Roadways Note: Chain all 6 Wheels

  33. Road Grader Leaving Yard For Snowplow Operations

  34. Carbide Tipped Cutting Edge Used to Shave Packed Snow and Ice From Roadways

  35. Grader Removing Packed Snow and Ice From Junction Routes 4 + 75

  36. Berm of Shaved Ice On BIA Route 4

  37. Road Grader Removing Ice From Junction Routes 4 + 53 Note Broken Stop Sign in Stop Bar

  38. Grader Damage to Paiute Street BIA Route 16

  39. Road Grader Shaving Ice Cleans 5-10 miles of road surface per shift Uses Carbide Tipped Cutting Edge

  40. BIA Route 7 After Ice Shaving Note Clean Berms (No Aggregate Loss)

  41. BIA Route 35 School Bus Route After Ice Shaving

  42. BIA Route 9 1 Day After Ice Shaving

  43. BIA Route 51 Simnasho After Plowing with Road Grader

  44. BIA Route 51 After Plowing With Road Grader

  45. BIA Route 51 Cul-de-sac After Plowing With Road Grader

  46. BIA Route 3 4 Days After Plowing

  47. BIA Route 3 4 Days After Plowing(U-pick Snowmen Parts)

  48. BIA Route 79 Wolfe Point After Snow Removal

  49. BIA Route 45 After Snow Removal

  50. Junction Routes 45 + 451 After Snow Removal

More Related