ISO Compliance Filing on FERC April 25, 2003 Order in Devon Power LLC, et al. (ER03-563-00)

ISO Compliance Filing on FERC April 25, 2003 Order in Devon Power LLC, et al. (ER03-563-00). Robert Ethier Director, Market Monitoring ISO New England Inc. May 23, 2003. FERC Action on April 25, 2003. Denied NRG’s request for RMR arrangements for full cost of service recovery

Download Presentation

ISO Compliance Filing on FERC April 25, 2003 Order in Devon Power LLC, et al. (ER03-563-00)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO Compliance Filing onFERC April 25, 2003 OrderinDevon Power LLC, et al.(ER03-563-00) Robert Ethier Director, Market Monitoring ISO New England Inc. May 23, 2003

  2. FERC Action on April 25, 2003 • Denied NRG’s request for RMR arrangements for full cost of service recovery • Allowed guaranteed recovery of only certain maintenance costs required for reliability • New agreements required within 30 days reflecting this ruling Discussion Draft Only

  3. FERC Action (cont’d) • FERC rejected the Proxy CT (combustion turbine) proposal it had previously accepted • ISO to modify Market Rule 1 by June 1 with temporary measure – ‘Peaking Unit Safe Harbor’ offer • Allows fixed cost component in offers of certain units • ISO-NE required to file Locational ICAP plan by March 1 ,2004. Discussion Draft Only

  4. FERC Action (cont’d) • Directed ISO-NE to establish temporary bidding rules: • Permit selected peaking units to raise their offers to reflect fixed and variable costs (PUSH) Peaking Unit Safe Harbor • Peaking unit defined as capacity factor less than 10%, resident in identified DCAs • Allow peaking units to set price • Offers would be allowed to reflect total fixed costs, levelized over 2002 MWh’s of generation Discussion Draft Only

  5. Rule Development Plan • ISO-NE intends extensive discussions with stakeholders on rules changes • Regular and special Markets Committee meetings in May to develop rules • ISO-NE to make compliance filing by May 30 • ISO-NE to implement temporary rules changes on June 1 • Rule changes in effect until introduction of Locational ICAP Discussion Draft Only

  6. Rule Development Overview • Appendix A modified to allow PUSH reference prices for applicable units. • OCA Thresholds apply during all congestion events in all locations. • Draft list of PUSH units posted on ISO website. • Procedures established for ISO calculation of interim PUSH reference prices. • ISO preparing to establish interim PUSH offers by June 1. Discussion Draft Only

  7. Overview of Today’s Discussion • Changes to Appendix A. • Additional modifications to Appendix A: • Clarify that $1000 cap applies to PUSH offers. • Non-confidential filing of PUSH support data by generators. • Capacity factor calculation methodology. • PUSH calculation procedure. • Data submittal, review, and filing. • Timeline. • UCAP methodology. Discussion Draft Only

  8. Changes to Appendix A • Definitions added. • DCA identification provisions streamlined to reflect temporary nature of current DCA’s. • OCA thresholds ($25/MWh or 50%) apply during constrained events everywhere. • Section 5.6.1.5.iv – Reference levels for PUSH units will be calculated differently from other units. • Exhibit 2 notes that they will be variable plus levelized fixed costs Discussion Draft Only

  9. Changes to Appendix A continued • Unit owners/bidders must submit unit cost data to ISO for PUSH treatment. • No change to Ref. Price if data not submitted. • Unit owners/bidders must file cost data with Commission within 15 calendar days. • Appendix A will be modified to say non-confidential filing is required. • PUSH levels will by modified upon receipt of Commission order. • If not submitted to Commission, PUSH Reference Prices will be suspended. Discussion Draft Only

  10. Changes to Appendix A continued • Details on PUSH calculation. • PUSH Ref. Price = (Net fixed costs/2002 MWh) + variable costs • Variable cost numbers required for each unit. • Forecast UCAP value is only generic revenue netting. • Start-Up and No-Load reference levels unaffected by PUSH methodology. • PUSH methodology will be re-evaluated upon implementation of Locational ICAP Discussion Draft Only

  11. Additional Changes to Appendix A • Statement to be added clarifying that PUSH Reference Levels not to exceed $1000 offer cap. • Statement to be added requiring filing of fixed costs with Commission on a non-confidential basis. • ISO will file its cost calculations with the Commission with comments on participant filing. • Clarification of handling of UCAP revenue. • Interim value based on to-date auction results. Discussion Draft Only

  12. Capacity Factor Calculations • Note: Only relevant for getting “on the list” • Very few units close to 10% threshold. • Capacity Factor = Total MWhs produced in 2002 divided by Sum of Seasonal Claimed Capability by season in 2002 • Adjustments: • Units commercial only portion of year would have reduced sum of SCC to reflect partial year • Units under RMR contracts were excluded. • No adjustment was made for environmentally limited units or forced outages. Discussion Draft Only

  13. PUSH Calculation Procedure • Data submittal and filing • Provide to ISO in specified format available on website • ISO will review and do calculations within 5 business days • Calculations available to participant • PUSH Reference Prices in effect on 6th day • Fixed cost numbers must be filed with Commission within 15 days • PUSH status suspended if no filiing • ISO will file its fixed cost calculations with Commission, but not Reference Prices Discussion Draft Only

  14. PUSH Calculation Procedure • Questions about calculation details? Contact: • Donald C. Ryan • Manager, Contract Services • ISO New England Inc. • One Sullivan Road • Holyoke, MA 01040-2841 • (413) 540-4205 Discussion Draft Only

  15. PUSH Calculation Procedure • Where to submit data? • Please email the completed worksheet, along with any electronic supporting information, to dryan@iso-ne.com with copies to gprice23@aol.com and smisiaszek@iso-ne.com. Discussion Draft Only

  16. Projection of UCAP Revenues • UCAP netted from annual fixed costs. • ISO proposes to use March through June Supply Auction average clearing price as estimate of monthly UCAP value to be netted for PUSH calculation. • This value to be netted from 2002 fixed costs. Discussion Draft Only