10 likes | 22 Views
Two varieties u2013 pleated and S curve curtains u2013 have been among the most popular options at different times. Consumers purchase the variety according to their tastes and style. These two varieties are a popular choice for architects and designers, partly because the curtains have no back u2013 that is, they appear the same from either side.
E N D
S Curve Curtains to Increasingly Gain Popularity in the Recent Times Two varieties – pleated and S curve curtains– have been among the most popular options at different times. Consumers purchase the variety according to their tastes and style. These two varieties are a popular choice for architects and designers, partly because the curtains have no back – that is, they appear the same from either side. It is often found that consumers who prefer to buy curtains online mostly shop for these two varieties. S-Fold drapery is a modern-looking style of the curtain where the undulations in the fabric are achieved through the spacing of the carriers and the tape. Pleat curtains feature a header that is gathered tightly with heading tape. This creates a ruffled look at the top of the curtains. Pencil pleating is the most traditional style for this type of curtain, but overall, pleat curtains aren't used anymore. S-fold curtains offer a much more modern look than pleats but that is just the beginning of their benefits. These drapes showcase the fabric in the drapery. More pattern and colour is visible with this style rather than getting folded away in pleats. Heavier weights can be used in this design and will fall nicely with great style. Some heavy fabrics are just too thick to be used in a pleated style. Such variety can be used to create sleek and clean lines, elegant window coverings and warm contemporary interiors, among other styles. They have a very appealing and versatile look. It’s modern enough to pair nicely with industrial lights and angular artworks, but simple enough to suit a more traditional lounge room or bedroom. This modern design of curtains have lots of benefits for homeowners. They tend to go well with interior design such as industrial and contemporary. These kinds of curtains can create quite a versatile look.