An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007

  2. Getting Started • Corporation of Trinity House London issues Contract Notice December 1, 2006 for a services contract for the provision of UK eLoran signal-in-space, as part of European eLoran service. • Invitations to Tender issued in January 2007. • The General Lighthouse Authorities (GLAs) today (31 May 2007) announces the award of a prestigious fifteen-year contract to VT Communications (part of VT Group plc) for the provision of a state-of-the-art enhanced Loran (eLoran) radionavigation service to improve the safety of mariners in the UK and Ireland. • http://www.trinityhouse.co.uk/media_centre/press_releases/press_release.html?id=15001 • VT Communications awarded subcontracts to R.G. Nash & Associates, reelektronika, and Megapulse.

  3. Other Service eLoran Service MSF Service

  4. Interface Specification (ICDs) • Engineering Issues • Induced Voltages into T antenna and SSX • Monitor Performance in presence of other signals • Specifications developed for interfaces at: • Prime Power Input • Antenna Matching and Feed • Grounding • Mechanical Mounting • Clearances Required • Lighting & HVAC • 216 line items specified for fab, build, or buy

  5. Site Survey • General site survey • Antenna farm location survey and orientation tests - Day 1 • 2 pre-tuned NF-6 notch filter boxes and engineering antenna preamp - provided by Megapulse; • spectrum analyzer, scope, van, etc. - provided by VTC; • 2 locations surveyed; • several antenna orientations tried; • preamp overloading caused multiple harmonics in Loran band; • Antenna farm location survey and orientation tests - Day 2 • preamp gain reduced, antenna orientation adjusted - successful reception of Lessay; • Container "survey" (1/3 of the future building)

  6. VT Contract Announced by GLAs Kick off Meeting with Megapulse Rugby De-commissioning Engineering and Fabrication Monitor System Site Survey Site Works Off Airs for Antenna Measurement Testing into Dummy Antenna Testing into Antenna On-air 8940M May 31, 2007 Jun 28-29 Jul 2- Jul 6 Jul 1- Sep 4 Aug 14-15 Sep 11- Sep 20 Sep 25-26 Sep 27-28 Sep 30 Summary

  7. Questions?