1 / 8

Q vs Await Node

Q vs Await Node. Q is a simplified Await node Q activity is the resource ie server, inspection Await Node can specify resource that is needed by activity ie tools, parts, materials, etc. Quiz.

snana
Download Presentation

Q vs Await Node

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Q vs Await Node • Q is a simplified Await node • Q activity is the resource ie server, inspection • Await Node can specify resource that is needed by activity ie tools, parts, materials, etc

  2. Quiz • Hand draw tonight….Turn next week a printed version sing AweSim software, a single server operation of a 7-11 store using AweSim objects, customers arrive at the counter that is Exponentially distributed with a mean of 4.5 minutes, the duration of the service time is normally distributed with a mean of 3.2 minutes and a standard deviation of 0.6 minutes, end the simulation after 1000 customers.

  3. AweSim software, a single server operation of a 7-11 store using AweSim objects, customers arrive at the counter that is Exponentially distributed with a mean of 4.5 minutes, the duration of the service time is normally distributed with a mean of 3.2 minutes and a standard deviation of 0.6 minutes, end the simulation after 1000 customers.

  4. ExercisesDue Monday 10/29 • 6-9 Machine tool processes 2 diff parts. T1 arrival time is tri dis 20-30-50. Interarrival time of T2 tri dis 35-50-60. Processing time for T1 is exp, m=20, T2 uniform min 15- max 20. Processing includes inspection, 1% fail, return to que the rework time =90% of original. Find time in system of part & utilization of machine. Use create/ await/ a conditional split of activities/ free/ collect/ terminate.

  5. Machine tool processes 2 diff parts. T1 arrival time is tri dis 20-30-50. Interarrival time of T2 tri dis 35-50-60. Processing time for T1 is exp, m=20, T2 uniform min 15- max 20. Processing includes inspection, 1% fail, return to que the rework time =90% of original. Find time in system of part & utilization of machine. Use create/ await/ a conditional split of activities/ free/ collect/ terminate.

  6. Series/ parallel process example • Build picture frames. 4 activities: cut mtl, glue frames, sand, finish. How long will it take to build each frame? Show in histogram for case1 & 2. • Case one: all series activity 1 is unifm dist 1 to 2mins, act 2 is constant 24 hrs, act 3 unifm dist 5-10 mins, act 4 is uniform 2-3 hr • case two: activity 1 is unifm dist 1 to 2mins, act 2A is unifrm 1-1.5 hrs, act 2B constant 23 hrs (5 glue sta) , act 3 unifm dist 5-10 mins, act 4 is uniform 2-3 hr

  7. Bank example • 2 inside tellers & 2 drive up tellers, time bwtn arrivals of outside tellers is is expon dist m=.75mins. Limited waiting space for drive up one is 3 cars and drive up 2 4 cars. Service time drive up one is norm dist 5 mins, dev = 1 min, 2nd drive up service time is uniform btwn 4 & 5 mins. If car arrives at drive up and line is full, the customer will go inside. Other walk in customers arrive at a rate of expon = .8 mins. They join a single Q and service time for both inside is triangular 2,3,5 dist., this line will only hold 7.

  8. 2 inside tellers & 2 drive up tellers, time bwtn arrivals of outside tellers is is expon dist m=.75mins. Limited waiting space for drive up one is 3 cars and drive up 2 4 cars. Service time drive up one is norm dist 5 mins, dev = 1 min, 2nd drive up service time is uniform btwn 4 & 5 mins. If car arrives at drive up and line is full, the customer will go inside. Other walk in customers arrive at a rate of expon = .8 mins. They join a single Q and service time for both inside is triangular 2,3,5 dist., this line will only hold 7.

More Related