slade
Uploaded by
19 SLIDES
369 VIEWS
190LIKES

下一世代資訊通訊網路尖端技術與應用 ( 二 ) 子計畫四 無線隨意及感測網路技術 (3/4)

DESCRIPTION

下一世代資訊通訊網路尖端技術與應用 ( 二 ) 子計畫四 無線隨意及感測網路技術 (3/4). 大學學術追求卓越發展延續計畫. 子計畫主持人 許健平 教授 國立中央大學資工系 張志勇 教授 淡江大學資訊工程系. General Description. Location Aware Services of a Hybrid Network for a Shopping Center. Real-time shopping information. Mobile device (PDA). RFID product information.

1 / 19

Download Presentation

下一世代資訊通訊網路尖端技術與應用 ( 二 ) 子計畫四 無線隨意及感測網路技術 (3/4)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 下一世代資訊通訊網路尖端技術與應用(二)子計畫四無線隨意及感測網路技術(3/4)下一世代資訊通訊網路尖端技術與應用(二)子計畫四無線隨意及感測網路技術(3/4) 大學學術追求卓越發展延續計畫 子計畫主持人 許健平 教授 國立中央大學資工系 張志勇 教授 淡江大學資訊工程系

  2. General Description Location Aware Services of a Hybrid Network for a Shopping Center Real-time shoppinginformation Mobile device (PDA) RFID productinformation Shopping center user guiding

  3. Breakthroughs and Major Achievements • Wireless Ad Hoc Networks

  4. Breakthroughs and Major Achievements • Wireless Sensor Networks

  5. Breakthroughs and Major Achievements • Wireless Sensor Networks

  6. Breakthroughs and Major Achievements • Broadcasting and Routing Protocols: • Efficient Broadcasting Protocols for Regular Wireless Sensor Networks • Obstacle Detection and Obstacle-Free routing • Coverage Protocols: • Probabilistic Coverage Preserving Protocol with Energy Efficiency in Wireless Sensor Networks • Dynamic Coverage and Connectivity Maintenance Algorithms for Wireless Sensor Networks • Energy-Efficient Hole Movement Mechanisms for Maintaining Temporal Full Coverage • Localization • Logical Coordinate Assignment for Geographic Routing in Wireless Sensor Networks • Routing with Hexagonal Virtual Coordinates in Wireless Sensor Networks • Mobile Anchor Guiding Protocol for obtaining maximal improvement of location accuracy of static sensors • Deployment • Obstacle-Free Robot Deployment Algorithm for Wireless Sensor Networks

  7. Categorized Summary 成果統計時間:2006/04/01~2007/03/31

  8. Categorized Summary • Journal Papers: (2006/4/1 ~ 2007/03/31) • C. –M. Chao, J. -P. Sheu, and I. –C. Chou, “An Adaptive Quorum-Based Energy Conserving Protocol for IEEE 802.11 Ad Hoc Networks,” IEEE Trans. on Mobile Computing, Vol. 5, No. 5, pp. 560 - 570, May 2006. • J. -P. Sheu, K. -P. Shih, S. -C. Tu, and C. -H. Cheng, “A Traffic-Aware Scheduling for Bluetooth Scatternets,” IEEE Trans. on Mobile Computing, Vol. 5, No. 7, pp. 872 – 883, July 2006. • Y. -C. Chen and J. -P. Sheu, “Interest-Based Lookup Protocols for Mobile Ad Hoc Networks,” Journal of Information Science and Engineering, pp. 1427 – 1445, Nov. 2006. • J.-P. Sheu, Y.-C. Chang, and G.-H. Song, “Logical Coordinate Assignment for Geographic Routing in Wireless Sensor Networks,” Journal of Pervasive Computing and Communications (accepted). • S. -L. Wu, J. -P. Sheu, and C. -C. Lee “A Fully Distributed Multi-Channel MAC Protocol for Ad Hoc Networks Based on Location Information,” Journal of Pervasive Computing and Communications (accepted). • J.-P. Sheu, K.-Y. Hsieh, and P.-W. Cheng “Design and Implementation of Mobile Robot for Nodes Replacement in Wireless Sensor Networks,” Journal of Information Science and Engineering (accepted) • J.-P. Sheu, S.-C. Tu, and L.-H. Chan, “A Distributed IP Address Assignment Scheme in Ad Hoc Networks,” International Journal of Ad Hoc and Ubiquitous Computing (accepted).

  9. Categorized Summary • J.-P. Sheu, S.-C. Tu, and C.-H. Yu, “A Distributed Query Protocol in Wireless Sensor Networks," Wireless Personal Communications (accepted). • C.-M. Chao, J.-P. Sheu, and I.-C. Chou, “A Load Awareness Medium Access Control Protocol for Wireless Ad Hoc Networks,” Journal of Wireless Communications & Mobile Computing (accepted). • J.-P. Sheu, C.-M. Chao, W.-K. Hu, and C.-W. Sun, “A Clock Synchronization Algorithm for Multihop Wireless Ad Hoc Networks,” Wireless Personal Communications (accepted) • P. K. Sahoo, J.-P. Sheu, and K.-Y. Hsieh, “Power Control Based Topology Construction for Distributed Wireless Sensor Networks," Computer Communications (Special Issue on Network Coverage and Routing Schemes for Wireless Sensor Networks) (accepted). • K. -P. Shih, C. Y. Chang, Y. D. Chen, and T. H. Chuang, “Dynamic Bandwidth Allocation for QoS Routing in TDMA-Based Mobile Ad Hoc Networks,” Computer Communications, vol. 29, no. 9,  pp. 1316-1329, 2006. • C. T. Chang, C. Y. Chang, and J. P. Sheu, “BlueCube:Constructing a Hypercube Parallel Computing and Communication Environment over Bluetooth Radio Systems,” Journal of Parallel and Distributed Systems, vol. 66, no. 10, pp. 1243-1258, 2006. • C. Y. Chang and H. R Chang, “Adaptive Role Switching Protocol for Improving Scatternet Performance in Bluetooth Radio Networks,” IEEE Transactions on Consumer Electronics, vol. 52, no. 4, pp. 1229-1238, Nov. 2006.

  10. Categorized Summary • C. Y. Chang, P. K. Sahoo, and S. C. Lee, “A Location-Aware Routing Protocol for the Bluetooth Scatternet,” Wireless Personal Communications, vol. 40, no. 1, pp. 117-135, Jan. 2007. • S. S. Wang, K. P. Shih, and C. Y. Chang, “Distributed Direction-based Localization in Wireless Sensor Networks,” Computer Communications, vol. 30, no. 6, pp. 1424-1439, March 2007. • G. J. Yu, C. Y. Chang, K. P. Shih and S. C. Lee, “Relay Reduction and Disjoint Route Construction for Scatternet over Bluetooth Radio Systems,” Journal of Network & Computer Applications, 2007.(accepted) • T. K. Shih, T. H. Wang, C. Y. Chang, T. C. Kao, and D. Hamilton, “Ubiquitous e-Learning with Multimodal Multimedia Devices,” IEEE Transactions on Multimedia,  2006. (accepted) • G. J. Yu and C. Y. Chang, “Congestion Control of Bluetooth Radio System by Piconet Restructuring,” Journal of Network and Computer Applications, 2007. (accepted) • G. J. Yu and C. Y. Chang, "An Efficient Cluster-based Multi-channel Management Protocol for Wireless Ad Hoc Networks," Computer Communications, 2007. (accepted) • G. J. Yu and C. Y. Chang, "An Efficient Cluster-based Multi-channel Management Protocol for Wireless Ad Hoc Networks," Computer Communications, 2007. (accepted) • C. Y. Chang and H. R. Chang, “Power Control and Fairness MAC Mechanisms for 802.11 WLANs,” Computer Communications,  2007. (accepted) • C. Y. Chang, K. P. Shih, C. H. Hsu, and H. C. Chen, “A Location-aware Multicasting Protocol for Bluetooth Location Networks,” Information Sciences, 2007. (accepted)

  11. Categorized Summary • Conferences Papers: (2006/4/1 ~ 2007/03/31) • J.-P. Sheu, C.-S. Hsu, and J.-M. Li, “A Distributed Location Estimating Algorithm for Wireless Sensor Networks,” Proceedings of International Conference on Sensor Networks, Ubiquitous, and Trustworthy Computing (SUTC), Taichung, Taiwan, June 2006. • J.-P. Sheu, Y.-C. Liu, and S.-C. Tu, “Location-Based IP Assignment Protocol for Ad Hoc Networks,” Proceedings of International Conference on Sensor Networks, Ubiquitous, and Trustworthy Computing (SUTC), Taichung, Taiwan, June 2006. • J.-P. Sheu, B.-K. Hsu, P.-C. Lin, and C.-J. Chang, “Design and Implementation of a Lightweight Operating System for Wireless Sensor Networks,” Proceedings of International Computer Symposium (ICS), pp. 586-591, Taiwan, Dec. 2006. P. K. • Sahoo, J.-P. Sheu, and W.-S. Lin, “Dynamic Coverage and Connectivity Maintenance Algorithms for Wireless Sensor Networks,” Proceedings of the Second IEEE/Create-Net/ICST International Conference on COMmunication System softWAre and MiddlewaRE (COMSWARE), Bangalore, India, Jan. 2007. • J.-P. Sheu and H.-F. Lin, “Probabilistic Coverage Preserving Protocol with Energy Efficiency in Wireless Sensor Networks,” Proceedings of the IEEE Wireless Communications and Networking Conference (WCNC), Hong Kong, March 2007.

  12. Categorized Summary • J. P. Sheu, S.-C. Tu, and C.-H. Hsu, “Location-Free Topology Control Protocol in Wireless Ad Hoc Networks,” Proceedings of the IEEE Wireless Communications and Networking Conference (WCNC), Hong Kong, March 2007. • J.-P. Sheu, and M.-L. Ding, “Routing with Hexagonal Virtual Coordinates in Wireless Sensor Networks,” Proceedings of the IEEE Wireless Communications and Networking Conference (WCNC), Hong Kong, March 2007. • K. P. Shih, C. Y.  Chang, H. C. Chen and C. W. Chang, "On Avoiding RTS Collisions for IEEE 802.11-Based Wireless Ad Hoc Networks," The 20th IEEE International Conference on Advanced Information Networking and Applications (AINA 2006) , Vienna, Austria, April 2006. • C. Y. Chang, K. P. Shih, and H. R. Chang, “Some Studies on Technology Support for Outdoor Mobile Learning,”  World Conference on Educational Multimedia, Hypermedia & Telecommunications (ED-MEDIA 2006), Florida, Orlando, USA, June 2006. • C. Y. Chang, K. P. Shih, S. C. Lee, and S. W. Chang, "RGP: Active Route Guiding Protocol for Wireless Sensor Networks with Obstacle," IEEE MASS, Vancouver, Canada, Oct. 2006. • C. Y. Chang, K. P. Shih, H. R. Chang, and H. J. Liu, “Energy-Balanced Deployment and Topology Control for Wireless Sensor Networks,” IEEE GLOBECOM, San Francisco, USA, Nov. 2006.

  13. Categorized Summary • C. Y. Chang, H. R. Chang, C. C. Hsieh, and S. W. Chang, "OFRD: Obstacle-Free Robot Deployment Algorithms for Wireless Sensor Networks,"  IEEE WCNC, Hongkong, March 2007. • C. Y. Chang, H. R. Chang, H. J. Liu, and C. T. Chang, “On Providing Temporal Full-Coverage by Applying Energy Efficient Hole-Movement Strategies for Mobile WSNs,”  IEEE WCNC, Hongkong, March 2007. • K. P.  Shih, T. C. Kao, C. Y. Chang, H. C. Chen, S. S. Wang, "Development and Evaluation of a Self-Regulatory-Learning-Cycle-Based System for Self-Regulated e/m-Learning," The 7th IEEE International Conference on Advanced Learning Technologies (IEEE ICALT 2007).

  14. Categorized Summary • Book Chapters : (2006/4/1 ~ 2007/03/31) • C. C. Wong, Y. G. Jan, R. H. Wu, Y. H. Lee, P. J. Chuang, S. T. Sheu,  H. C. Keh, C. Y. Chang, K. P. Shih, J. S. Chiang, Y. S. Chou, H. W. Tseng, J. Y. Lin, C. C. Ho, "Wireless Ad Hoc Networking: Personal-Area, Local Area, and Sensory-Area Networks," Book Chapter of A Smart Blind Alarm Surveillance and Blind Guide Network System on Wireless Optical Communication, CRC Press LLC (in press). • C. Y. Chang, G. J. Yu, K. P. Shih, S. S. Wang, “Efficient Data-Centric Storage Mechanisms in Wireless Sensor Networks,” Book Chapter of Mobile Intelligence: When Computational Intelligence meets Mobile Paradigm , John Wiley & Sons • S. S. Wang, K. P. Shih, C. Y. Chang, G. J. Yu, “Tracking in Wireless Sensor Networks,” Book Chapter of Mobile Intelligence: When Computational Intelligence meets Mobile Paradigm , John Wiley & Sons

  15. Categorized Summary • Academic Award: • 資訊學會96年度李國鼎穿石獎 (許健平教授)

  16. Categorized Summary • Activities (期刊編輯) • J. P. Sheu, Int’l Journal of Sensor Networks (2006 ~ present). • J. P. Sheu, IEEE Trans. on Parallel and Distributed Systems, (2004 ~ present). • J. P. Sheu, Int’l Journal of Ad Hoc and Ubiquitous Computing, (2004 ~ present)

  17. Categorized Summary • Activities (會議舉辦) • The First International Conference on Sensor Technologies and Applications 2007 (Member of the advisory committee : J. P. Sheu) • Workshop on Wireless, Ad Hoc, and Sensor Networks, in NCU, August 2006 (General chair: J. P. Sheu) • Workshop of Mobile and Ubiquitous Learning, in TMUE, April 2006 (Program co-chair: C. Y. Chang) • Workshop on Wireless, Ad Hoc, and Sensor Networks, in NCU, Sep. 2007 (Program co-chair: C. Y. Chang) • The 22nd IEEE International Conference on Advanced Information Networking and Applications, March 2008 (Vice co-chair: C. Y. Chang)

  18. A Summary of the Post-Project Plan

  19. A Summary of the Post-Project Plan