Workshop Intelligent Energy and FP7 Biomaterial Handling Stations for Energy Service Companies

Workshop Intelligent Energy and FP7 Biomaterial Handling Stations for Energy Service Companies. Oil/gas/solids. Workshop. location. quality. staff. equipment. Inputs. Processing. CHP units (ESCo). carbon balances. storage. technology. size. process. 1 what materials?.

Download Presentation

Workshop Intelligent Energy and FP7 Biomaterial Handling Stations for Energy Service Companies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WorkshopIntelligent Energy and FP7Biomaterial Handling Stations for Energy Service Companies

  2. Oil/gas/solids Workshop location quality staff equipment Inputs Processing CHP units (ESCo) carbon balances storage technology size process 1 what materials? 2 what’s needed? 3relationships?

  3. Exercises • What biomaterials feed into MHS + used for what? • Outputs should be gas/liquid for engines, solids for boiler • Try to divide into either common to all countries, or country-specific • What activities are undertaken by MHS? • Is location important? • What equipment is needed? • Area of operation - radius? • Ensure cost-effective…simple, quick, low cost • What should relationship be between MHS and ESCO?

  4. Portugal –Sandra Italy – Elena Poland – Edward Finland – Kim UK – Robin UK - Jerry Holland – Andrea Spain – Juan Spain - Puy UK – Mark UK – Pat Switzerland – Arturo UK – Richard The teams Team rules • Europe is diverse and inputs should reflect this • Everybody’s input is valuable • There are no wrong ideas • Everybody must contribute • Decide who feeds back info • Write it down or lose it

  5. Outcomes – Exercise 1

  6. Outcomes – Exercise 2 Organise Delivery = collection Storage Processing Delivery to CHP units (finished products) Location Planning permission Databases Storage Refrigeration Dry-storage Just-in-time Need to ensure collection of materials & delivery to ESCo Outsource certain tasks Mobile pressing to reduce costs What to do with waste? Just-in-time delivery/processing Transport Rail/road/water? Waste recycle Processing Biogas -AD -needs consistent process/supply Major output=gas/oil Pellets=secondary Quality Control

  7. Outputs – Exercise 2 (contin). Pre-transport processing Remove moisture - press Organise Delivery = collection Storage Processing Delivery to CHP units (finished products) Plan for the worst Handling and storage equipment Unload equipment Front-end storage Back-end storage = solid/liquid/gas Location Radius balance - demand vs supply Must be popular No smells – filters Farmer co-operation important Processing equipment Moisture reduction Cell rupture Grading Pelletiser Blender Digester Gasification Fermentation Pyrolysis Press Front-end storage Back-end storage = solid/liquid/gas Size Match station facilities with available local feed supply Match size/nature of storage containers with local feed supply Non-storage for perishables Perception important Not a waste-handling centre A fuel preparation centre

  8. Outputs - Exercise 3 MHS Organise Delivery = collection Storage Processing Delivery to CHP units (finished products) Owned by ESCo Solus supplier to ESCo Franchised Non-profit making Fully-commercial ESCo Operate CHP and boilers Owned by MHS