John MILLAR – Finland – RT.1a/5a

Distribution Network Planning and Underground Cables Keeping overview while attending to detail. John MILLAR – Finland – RT.1a/5a. …with much appreciated help from, among others: Prof. Matti Lehtonen and Eero Saarijärvi. My research fields. Ampacity of underground cables

shona
Download Presentation

John MILLAR – Finland – RT.1a/5a

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Distribution Network Planning and Underground Cables Keeping overview while attending to detail John MILLAR – Finland – RT.1a/5a …with much appreciated help from, among others: Prof. Matti Lehtonen and Eero Saarijärvi

  2. My research fields • Ampacity of underground cables • Practical investigations of their thermal environment • Development of real-time algorithms • Network planning algorithm • MV, LV and MV-LV…

  3. Underground cable rating • Suggeststeady-state for planning • The future is hard to predict… • Cyclic rating for existing, but note: • Needsthoroughknowledge of installed conditions • Must consider: • Moisture migration • Externalheat sources • Condition of existingcables

  4. Cyclic vs. Steady-state rating forexisting MV cables • 90 °C: • steady-state rating: 382 A • cyclic rating: 462 A • 65 °C: • steady-state rating: 340A • cyclic rating: 385 A

  5. Cables: Installation challenges • Crowding of underground services • Duct bank and tube installation ratings more challenging • Charging current >> load currents for long rural cable connections

  6. Distribution network planning • Automating the laborious task of trial and error planning • An algorithm that deals with real networks and realistic planning issues in reasonable computation times • Trying to keep up with contemporary developments...

  7. VOH_MV • ‘Optimally’ routes lines between fixed primary and secondary substations, i.e. plans the MV network. • Optimal or full switching – 3 levels • Optimal or full backup connections between main feeders • Existing network consideration and upgrade times • User-preferred network

  8. VOH_MV, e.g.:

  9. VOH_MV_LV • Starts with LV customers and primary substation positions • ‘Optimises’, according to various planning philosophies: • secondary substations (no. and positions) • connection (cable) boxes (no. and positions) • And, of course the MV and LV network • routing – switches – backup

  10. VOH_MV_LVOne approach Primary Substations LV customers

  11. VOH_MV_LVAnother approach

  12. VOH_MV_LVand another approach

  13. VOH_MV_LVand finally...

  14. Contemporary developments • mmm... We know that this algorithm should be able to handle • distributed generation – coming ‘soon’! • What else? Many thanks!