pixel l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Pixel PowerPoint Presentation
Download Presentation
Pixel

Loading in 2 Seconds...

play fullscreen
1 / 11

Pixel - PowerPoint PPT Presentation


  • 253 Views
  • Uploaded on

Pixel Design a Photography Asset Management (PAM) System Jeffrey Jacob, Ian Lau, Howell Li, Ben Schwaid Presenter: Ian Lau Agenda - Review - System Architecture - Subsystem - Database - Subsystem - Maestro Import - Subsystem - User Interface - Demo - Plan Review System Architecture

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Pixel' - sherlock_clovis


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
pixel

Pixel

Design

a Photography Asset Management (PAM) System

Jeffrey Jacob, Ian Lau, Howell Li, Ben Schwaid

Presenter: Ian Lau

agenda
Agenda

- Review

- System Architecture

- Subsystem - Database

- Subsystem - Maestro Import

- Subsystem - User Interface

- Demo

- Plan

database driver
Database Driver
  • The database connection is wrapped with a class.
  • The retrieval and insertion functions take in and return data structures that represent each of the entities in the system
  • - users (photo editors, photographers, etc)
  • - photo
  • - assignments
maestro import
Maestro Import

DB connector

web interface
Web Interface

As in the database, the web interface is wrapped with helper classes that will call functions in cgicc

slide9
Demo

Available at http://seifen.dynu.com

slide10
Plan
  • - Two teams : infrastructure and interface.
  • Initially, the two parts will be built in parallel using stubs and dummy data (see demo).
  • Once the database is built, replace stubs with actual calls with the wrappers.
  • Goal : integrate the two parts by the first build (4/18).