Engineering & Construction Management Department
Download
1 / 1

Page 1 of 1 - PowerPoint PPT Presentation


  • 75 Views
  • Uploaded on

Engineering & Construction Management Department. March Report , 2011. Project . General Project Description: Park design to include parking area, pathway, rock wall for playground area, wood fiber surface, picnic shelter, bike rack, park signs, landscaping, irrigation, and lighting.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Page 1 of 1' - shen


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Page 1 of 1

Engineering & Construction Management Department

March Report, 2011

Project

General Project Description: Park design to include parking area, pathway, rock wall for playground area, wood fiber surface, picnic shelter, bike rack, park signs, landscaping, irrigation, and lighting.

Proposed park area

PROJECT SCHEDULE

Design Status: Complete

Pending Issues: None

Overall Project Budget: $799,847.40

Funding Source(s): Parkland Dedication Fees/Grant

Project Contact

Project Manager: Yvette Hernandez

541-4200

Design Consultant: AIA Engineers, LTD

Page 1 of 1