30 likes | 118 Views
Explore the comparison of pCO2 data for 2009-2010 using ECCO2 model against CCSM KS BLEND, including cost analysis and optimized results. Dive into an in-depth evaluation presented through the optimized Taylor diagram to determine if it provides a better way to display the results.
E N D
Model (ECCO2) vs. Data: pCO2 Cost: J = 74.6 J = 69.1 J = 75.7 CCSM KS BLEND Cost: J = 78.2 J = 66.1 J = 62.7 Optimized = -0.35 * CCSM + 1.19 * KS + 0.38 * BLEND + -0.23 * NOBM IC NOBM IC Lin.Combi. Optimized