removing most of the machine screws leaving a few to hold things in place. What is this, spaghetti?. Lifting harness ready to go, with thanks for the description from the 3I6 site. Harness set, removing the remaining machine screws. stubborn machine screw, vice grips helped.

shelby
Download Presentation

removing most of the machine screws leaving a few to hold things in place

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. removing most of the machine screws leaving a few to hold things in place

  2. What is this, spaghetti?

  3. Lifting harness ready to go, with thanks for the description from the 3I6 site.

  4. Harness set, removing the remaining machine screws

  5. stubborn machine screw, vice grips helped

  6. and we are free, the harness works great.

  7. letting the halyard support the rail

  8. flipping it over to work on the bottom

  9. the reason we needed to do this

  10. definitely a good idea

  11. Carefully scraping the surface of the joint

  12. The more flexible putty knife worked well here.

  13. Careful so you don’t damage the deck gelcoat. Wipe with alcohol for final clean up.

  14. scraping off the old bedding

  15. This scraper seemed to work well

  16. alcohol seems to dissolve the bedding compound without being too toxic

  17. Some of the corrosion “tunneled” and took more determined digging to get out.

  18. hung up and taped for painting

  19. about 4 screws were removed at a time and big screwdrivers used to hold the joint open

  20. notice I am making sure to get both the top and bottom surfaces

  21. then wiped with alcohol soaked rag and allowed to dry

  22. let there be light (and a clean joint)

  23. 5200 is injected into the gap and screws re-installed before continuing down the line

  24. squeeze out

  25. rail treated painted and going back into place

  26. It takes two to get this done one to push into place while the other installs screws

  27. last one is the hardest

  28. Running the screws down

  29. one tap on the hull to move to the next screw

  30. this is what taking yoga is good for

  31. All Done