An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Market Integration & SoSUpdated proposals for SJWS #6 ENTSOG offices – Brussels Stakeholder Joint Working Session – 26 April 2012

  2. SJWS process on SoS & Market Integration June TYNDP 2013-2022 Public WS Feb. 15th May ? Mar. 20th April 26th February session – Come-back to TYNDP 2011-2020 Establishment of a shared understanding of current report and associated feedback March session – ENTSOG initial proposals Proposals focus on selection of relevant cases for SoS & Mkt Int. assessment Feedback on proposals and first considerations on indicators to be used April session – ENTSOG updated proposals Fine-tuned scenarios/cases and first set of indicators May session – Fine-tuning of assessment methodology Presentation of an integrated method (cases & indicators) fitting with other SJWSs

  3. Security of Supply& UGS low deliverability

  4. Security of Supply – potential events List of extreme but still realistic events will be slightly updated Considered list could be complemented at GRIP level for specific focus

  5. LNG management Definition of the import and storage share Supply part could be based on the historical curve not considering the highest values (using a pipe profile instead of) The difference between the historical profile and the curve defined above could represent the storage part to be split between countries according the average autonomy-days (tank volume / send-out capacity) of their LNG terminals LNG tank management Required parameters to be used in the model: stock level to be considered prior to any event the minimum level to be kept in stock Such data will be provided by the update GLE study LNG as storage LNG as import

  6. Security of Supply – Event management Management of disruption or low UGS deliverability cases Supply priority is: Disrupted supply through alternative routes Alternative imports (including LNG until maximum potential supply as import) LNG (using remaining capacity up to send-out capacity) and UGS Disruption Order does not influence the identification of gaps but provide transparency on the method and influence the resulting supply mix Load factor of import routes Model will be able to use different load factor for routes between a given supply source and Europe Nevertheless a minimum load factor will be defined for every route based on historical data

  7. Security of Supply – Low UGS Minimum UGS deliverability at European level UGS withdrawal rate at European level is defined by putting all imports at their Potential Supply level (disregarding LNG storage component) Same UGS (and LNG storage component) load factor will be then used in every system (except for gas islands) Resulting information Comparison of the minimum deliverability with the one observed in February last years Identification of potential flow constraints preventing this even withdrawal rate Such identification highlights the relative influence of UGS by countries but cannot be used to define investment gaps themselves as a higher withdraw rate is sufficient 75% 75% 75% 75% 75% 75% 75%

  8. Security of Supply – 2-week case Definition of demand level on a 2-week period For the 2-week period under Simultaneous Case, imports will be set at their potential supply value An additional modelling will be made with every disruption Way to model Value to be confirmed by stakeholders Modeled day • Supply/Demand balance on the last day defines the need of UGS deliverability • Modeling check potential gaps • Ex-post calculation defines the minimum UGS deliverability then level for the 6 previous days

  9. Market Integration& Supply diversification

  10. Predominant supply Russia Which benchmark ? In comparison with Reference Case supply share (full color), potential benchmarks are: X% of import capacity (TYNDP 2011-2020 with 95% for pipe and 80% LNG) Potential supply of the source +Y% increase in comparison with Ref. Case Guidelines Cases/scenarios have to ensure that TYNDP cover extreme but still realistic scenarios in order to provide a meaningful information to decision-maker Level of stress on infrastructures also depends on: How are combined increased sources the way other sources are decreased Norway LNG

  11. Alternative supplies Supply spread will differ depending on how each import point of alternative supplies will be decreased: By the same percentage for every source and route By the same percentage for every source but giving some flexibility by route By the same percentage for every source and complete flexibility by route (down to 0 – case of previous TYNDP) Under the supply minimization case, benchmark could be a decrease of the same extent that the increase, the alternative supplies being increased according above options (down to 0 being replaced by up to Potential Supply of the Source) Influence of each supply source will be considered separately NO - 14% NO +14% RU, AL, LY, CA, LNG + 5% RU, AL, LY, CA, LNG -5%

  12. Supply range proposal TYNDP 2011-2020 figures

  13. Physical supply spread Uniform spread Spread shape aims at reaching simultaneously a given supply share threshold (X%) in a maximum number of systems It models a common reaction to a given stimulus and the ability to physically secure a sell agreement Maximum reach Spread shape aims at reaching alternatively a given supply share threshold (X%) in a maximum number of systems It requires several runs to capture maximum ranges (could be based on the ability to replace alternative source one-by-one) It models the ability to physically secure a sell agreement for more remote countries than in the uniform spread (e.g. selling NO gas arriving in UK to the RO market) NO +14% NO +14% Both types of spread will use the same source and route range as proposed in previous slide

  14. Identification of physical limits No gap identification It would require both: A consensus on market integration definition and target To balance cost and benefit of improvement Some contractual solution may mitigate the lack of supply diversification under business-as-usual conditions (not in case of crisis which are covered within the SoS section of TYNDP) Identification of physical limits Identification should rather derive from a lack of diversification of a given system rather than from a limit to a source spread (e.g. what prevents HU to have a physical access to 20 % of NO gas, rather than what limit the ability to send more NO gas into Europe)

  15. Indicators & Gap identification

  16. Remaining flexibility & investment gaps Remaining flexibility indicator It is defined at 2 levels: Infrastructure: System level: Results are provided as ranges: <1% / 1-5% / 5-20% / >20% Gap identification criteria Under Reference Case (no disruption), gaps are identified when a system has a R. Flex below 5% In case of disruption, the criteria is decreased to 1% as part of the R. Flex will have been used to face the event Then congested infrastructure (or supply) are identified based on their R. Flex Potential remedies will be identified using the non-FID projects provided by project promoters (without priority)

  17. Supply diversification Impacting supply share The share of a given supply source able to induce a significant impact on prices Should it be calculated in comparison with the total supply or the total imports ? TYNDP 2011-2020 used mostly 5% (identifying also systems with more than 20%) On map, supply shares should be represented with figures or ranges? Supply diversification from a market perspective • Could be based on the uniform or maximum spreads • Which is the minimum share of a given source to be considered? • How to deal with LNG embedded diversification (e.g. highlighting the presence of LNG)? • Is a benchmark (e.g. 3 sources required)?

  18. Range of infrastructure use in the cases Synthetic indicator can be derived from all simulations Indicator can be defined for every system: At cross-border level UGS aggregate LNG aggregate Range would be defined base on the highest and lowest load factor of the 165+ simulations • Actual use may be outside these ranges • Robustness could be improved with a sensitivity study around each simulation modifying slightly the supply shares

  19. Route diversification ENtry Capacity Concentration index As evolution of market shares is beyond the scope of TYNDP, analysis should focus on how infrastructure can support market integration and SoS Then based on the same logic than HHI but calculated on the share of an entry capacity in the total entry (same can be done using the flows but index will then depend on flow pattern) 30% 100% 40% 20% 10% ENCC= 40²+30²+20²+10²= 3000 ENCC= 100²= 10 000 EXit Capacity Concentration index • Similar indicators may defined based on exit capacity in order to measure how a system may support supply/route diversification • Result should be compared to the idealistic situation taking into account the number of cross-borders As for all indicators, analysis is more robust when comparing situation of one country between 2 cases

  20. Security of Supply & Market Integration proposed Cases List of parameters for modelling Current proposal accounts for 165 cases (against 67 for TYNDP 2011-2020), one additional disruption would add 15 cases

  21. Thank You for Your Attention Olivier Lebois, Adviser, System Development ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels EML: Olivier.Lebois@entsog.eu T: + 32 2 894 5105 WWW: www.entsog.eu