An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AESO Export Capability WorkshopFebruary 16, 2006Metropolitan Centre, Calgary

  2. AB to BC Transfer BCTC perspective Calgary, Alberta - Feb 16, 2006

  3. The BC Transmission System • Snapshot: • 18,000 km circuit transmission lines • 287 switching, distribution and capacitor stations • Control Centers • 1 System Control Center • 4 Area Control Centers • 244 microwave and repeater sites • Transmission rights-of-way • Interconnected to Alberta and the Pacific Northwest for over three decades

  4. GMS/PCN MCA REV WSN ACK KLY CBK NIC SEL 5L91 5L94 VAS 5L92 5L76 & 5L79 5L87 LM & VI 5L98 5L96 5L81 & 5L82 SEL area gen 2L112 5L51 & 5L52 BCTC Bulk Transmission System Overview (export to US) BPA

  5. GMS/PCN MCA REV WSN ACK KLY CBK NIC SEL 5L91 5L94 VAS 5L92 5L76 & 5L79 5L87 LM & VI 5L98 5L96 5L81 & 5L82 SEL area gen 2L112 5L51 & 5L52 BCTC Bulk Transmission System Overview(import from US) BPA

  6. Transmission Line Forced Outage (3 pole) Approx Data Notes: • SPR provided in late 2002 • SPR provided in mid 2003 • SPR to be provided in 2006 • SPR provided in 2005 • Include sequential ctgs in less than 5 minutes • * SPR provided

  7. BCTC RAS • RAS arms generation shedding, line tripping, reactive equipment switching, and calculates transfer limits • RAS armed in real time dynamically • RAS arming based on actual flows • TSA runs every 4 minutes • TSA arms RAS • RAS armed automatically