Base Case Coordination System RFP. David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah. BCCS Pre-Bid Conference Agenda. Introductions Meeting Arrangements BCCS Purpose Overview Planning Model Operating Planning Interface

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Base Case Coordination System RFP' - sen


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Base case coordination system rfp

Base Case Coordination SystemRFP

David Franklin

BCCS

System Review Group/Planning Tool Subcommittee (PTS)

Pre-Bid Conference

Salt Lake City, Utah


Bccs pre bid conference agenda
BCCS Pre-Bid ConferenceAgenda

  • Introductions

  • Meeting Arrangements

  • BCCS Purpose Overview

    • Planning Model

    • Operating Planning Interface

    • Change Control Methodology

  • PTS’s Evaluation Methodology of Vendor Proposals

  • Responses to Vendors’ Questions on BCCS RFP

  • Next Steps

    • Meeting with Final Vendors

    • Kick Off Meeting


Purpose of rfp
Purpose of RFP

  • Centralized Data Base

  • Improve Communications

  • Improve Data Accuracy

    • NERC Requirements (MOD Standards)

    • Load & Resources

  • Increase number of base cases per year

  • Produce Base Cases Independent of Power Flow Platform

  • BCCS Integration

    • Bus/Branch Model and Node/Breaker Model

    • Topology Processor


Bccs node breaker integration
BCCS – Node-Breaker Integration

  • Planning models have Bus-Branch structure

  • BCCS will be able to hold Node-Bkr and Bus-Br data

  • Planning data can be produced from node-breaker data

  • BCCS data will be used in operation models as projects are constructed and are placed in-service

  • Operations/Planning coordination is required



Rfp distribution
RFP Distribution

  • Operating Committee

  • Planning Coordination Committee

  • Technical Studies Subcommittee

  • System Review Work Group

  • Interested Vendors, System Integrators, and Consultants

  • Seven vendors responded they intend to bid


Pre bid conference
Pre-Bid Conference

  • Existing processes and problems

  • BCCS Structure and use

  • Explanation of Project concept

  • BCCS RFP response review process

  • Next Steps after review process

    • SRWG, TSS, PCC approval of selected vendor