An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. D (9) FS0 FF7 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) SF21 FF5 SS3 E SS8 FS7 (18) FF3 G I FF3 (11) (7) 0 12 7 17 7 19 ES for B: (EF-duration) 17-10 Given the precedence network shown above with the indicated logical dependencies between activities We set ES for A equals to zero EF for A will be equal to 12 since A starter at week 0 and has a duration of 12 There is FF5 dependency between A and B, which means that B can not finish before A is finished by 5 units. Thus EF for B is equal to 12 + 5 = 17 Between B and C we have SF12 dependency. That is between the finish date of C and the start date of B we must have a delay of 12 units. Thus EF for C will be equal to: 7+12= 19 C has a duration of 12 units and therefore its ES will be at (19-12= 7) . This means that B and C should start at the same time

  2. D (9) FS0 FF7 0 12 7 17 7 19 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) SF21 FF5 SS3 E SS8 FS7 (18) FF3 G I FF3 (11) (7) 19 28 10 28 ES for D: FS0 + 19= 19 (since FS0=0) EF for D: 19+9=28 We observe that for E there exists two alternative dependencies with C and A, we must find which of these dependencies gives the maximum ES for E and select it! Alternative 1: SF21 from C This gives us EF for E equals to 28, and ES equals to (28-18=10) Alternative 2: SS3 from A Based on this alternative, ES for E is 3. Alternative 1 SF21 from C ES = 10 Alternative 2 SS3 from A ES = 3 10 is the largest value, therefore the ES for E must be at 10 and early finish at 28

  3. 19 28 D (9) FS0 FF7 0 12 7 17 7 19 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) 10 28 SF21 FF5 SS3 E SS8 FS7 (18) FF3 G I FF3 (11) (7) 24 35 Similarly for F, we have 3 alternatives for ES: Alternative 1: FF7 from D, this gives us ES = 24 Alternative 2: FS0 from C ES, this gives us = 19 Alternative 3: FF5 from E ES, this gives us = 22 Alternative 1 from D gives us the largest ES value for F. therefore, ES for E is 24 and EF is equal to (24+311= 35)

  4. 19 28 D (9) FS0 FF7 0 12 7 17 7 19 24 35 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) 10 28 SF21 FF5 SS3 E SS8 FS7 (18) 24 35 FF3 G I FF3 (11) (7) 32 42 32 39 Similarly we find ES and EF for the rest of activities. total project duration is thus 42

  5. 19 28 D (9) FS0 FF7 0 12 7 17 7 19 24 35 32 42 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) 10 28 SF21 FF5 SS3 E SS8 FS7 (18) 24 35 32 39 FF3 G I FF3 (11) (7) back pass 24 35 32 42 35 42 We start now the back pass calculations and we select the finish date for the project (for both H and I) LF for H = 42 LF for I = 42 LS for I: 42-7= 35 LF and LS for activity F: we have two alternative back pass dependencies with activity H and I Alternative 1: SS8 between H and F, this dependency causes the LF for F to be 35 Alternative 2: SS8 between I and F, this dependency causes LF for F to be 38 During the back pass calculations we must select the minimum value between alternatives. Therefore LF for F is equal to 35 and LS: 35-11= 24 LS for H: 42-10= 32

  6. 19 28 D (9) FS0 FF7 0 12 7 17 7 19 24 35 32 42 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) 10 28 24 35 32 42 SF21 FF5 SS3 E SS8 FS7 (18) 24 35 32 39 FF3 G I FF3 (11) (7) 35 42 19 28 28 39 G is connected to I through dependency FF3, this gives LF for G equals to 39 and LS equals to (39-11=28) Activity D is connected to F through dependency FF7. LF for G is thus equals to 28, and LS equals to 19

  7. 19 28 D (9) FS0 FF7 0 12 7 17 7 19 19 28 24 35 32 42 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) 7 17 7 19 10 28 24 35 32 42 SF21 FF5 SS3 E SS8 FS7 (18) 12 30 24 35 32 39 FF3 G I FF3 (11) (7) 28 39 35 42 0 12 We apply the same procedure for the rest of activities. and we finally find LF for A equals to 12 and LS for A equals to 0

  8. 19 28 D (9) FS0 FF7 0 12 7 17 7 19 19 28 24 35 32 42 A B C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) 0 12 7 17 7 19 10 28 24 35 32 42 SF21 FF5 SS3 E SS8 FS7 (18) 12 30 24 35 32 39 FF3 G I FF3 (11) (7) 28 39 35 42 0 0 0 0 0 0 2 4 3 Float calculations Float = LF- EF For I (42 - 39 = 3) Activity C: 19 - 19 = 0 Activity D: 28 - 28 = 0 Activity E: 30 - 28 = 2 Activity B: 17 - 17 = 0 Activity F: 35 - 35 = 0 Activity H: 42 - 42 = 0 Activity G: 39 - 35 = 0 Activity A: 12 - 12 = 0

  9. 19 28 0 D (9) FS0 FF7 0 12 7 17 7 19 19 28 24 35 32 42 0 0 0 0 A B 0 C F H FF5 SF12 FS0 SS8 (12) (10) (12) (11) (10) 0 12 7 17 7 19 10 28 24 35 32 42 SF21 FF5 SS3 2 E SS8 FS7 (18) 12 30 24 35 32 39 FF3 4 3 G I FF3 (11) (7) 28 39 35 42 The critical path of the network is: A-B-C-D-F-H