1 / 16

Deutsche Endevor Nutzer Konferenz

Deutsche Endevor Nutzer Konferenz. April 21-25, 2002 in Orlando mehr als 10000 Teilnehmer mehr technische Sessions Gute Mischung. BrightStor™ Portal Centralized Enterprise Storage Management Wireless Network and Device Management e Trust™ 20/20 Super-Visual Security Management

selah
Download Presentation

Deutsche Endevor Nutzer Konferenz

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deutsche EndevorNutzer Konferenz

  2. April 21-25, 2002 in Orlando • mehr als 10000 Teilnehmer • mehr technische Sessions • Gute Mischung

  3. BrightStor™ Portal Centralized Enterprise Storage Management • Wireless Network and Device Management • eTrust™ 20/20 Super-Visual Security Management • CleverPath™ Portal 4.0 • AllFusion™ Integrated Application Life Cycle Management

  4. CARE • 184 Teilnehmer • 18 Staaten • 50 % neue Präsidenten • Alle Nationalen User Groups

  5. Dar Process • Wahl der 10 wichtigsten Dars • Besprechung mit den CA-Verantwortlichen • Umbennung • Telefonkonferenzen • Usergroup Charter • Motivation • Web Site Prüfung: www.cast.org/bobby/

  6. 1. Issues with SMP/E installation • a. PTFs installed or Full installation • b. If true SMP/E is used as designed, it would not be necessary to reinstall the complete product. • c. Prior to installation it is required to edit a member to customize it to company standards. Then additional editing is required of the FMID before ACCEPTing it into SMP/E. Therefore the editing processes are required twice before applying into target zone.

  7. 1. Issues with SMP/E installation • d. SMP/E installation should know PTF Co-requisites and pre-requisites • e. Should you ”never accept PTF’s, if accepted they can not be backed • f. If identified (pre and co requisites) we should be able to backout all of them together. • g. It is required to Reject Usermods (C1DEFLTS, ect) before applying new.

  8. 2. STARCC • a. Unable to find PTF’s without solution numbers • b. Are there different search engines that we cannot access, where CA does have access? • c. Eliminate ”Garbage lines” from downloaded solutions, to make available for SMP/E installation without modifying. • d. Received solution with ”Non-GA” prerequisite

  9. 3. Webstation • a. Can’t find it on CA Web Page • b. Require the capability to review Batch output messages. (is available in 4.0) • c. Need more functionality (accepting DARs for product) • d. Usage with LSERV is very-very slow.

  10. 4. Education • a. Terri discussed how can CA make education more appealing to the users. Several Presidents agreed to be on a committee to help with educational input, such as creating an Advance Administration class

  11. 5. Guesstimate when 4.0 will be available in Beta • a. End of May, Ross Markly shared information on 4.0 from a customer’s end

  12. 6. Endevor and Harvest • a. Need a fully integrated tool to manage it all (Unix and MF) • b. Issues with integration. • c. Several companies are offering solutions

  13. 7. Support had improved in Australia, and Europe. • 8. Problems with 64 bit address, user getting S0c4 (ruled out Optimizer problems).

  14. Die I-Nuge Mannschaft 2002 • Präsident: Michael Davidson • Vize Präsident: Rodger Henry • D.A.R. Administrator: Chris Murphy • Shareware Administrator John Stafford • Internet WebMaster James Borders • European International Liaison Norbert Fluegel • Asia / Pacific International Liaison Arthur Mihailidis

  15. Informationen im Web • Teilnehmer http://ca.com/caworld/2002/care/attendees.htm • Präsentationen http://ca.com/caworld/2002/care/presentations/ • Weitere Links • http://agendas.ca.com/agendas/ • http://ca.com/caworld/2002/highlights/ • http://ca.com/caworld/2002/media_gallery/

  16. Die nächsten Termine • CARE 2003 in Las Vegas • 10.7.2003 - 11.7.2003 • CA-World 2003 in Las Vegas • 13.7.2003 - 17.7.2003

More Related