1 / 32

FY 2014 NTD Reporting Federal Register Notices Explanation of Proposed Changes 28 August 2014

FY 2014 NTD Reporting Federal Register Notices Explanation of Proposed Changes 28 August 2014. NTD Modernization. Development of “NTD 2.0” System started in September, 2012 Pilot testing was May 19 th thru June 6 th , 2014 Motivation for new system: Reduce maintenance costs

sela
Download Presentation

FY 2014 NTD Reporting Federal Register Notices Explanation of Proposed Changes 28 August 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY 2014 NTD ReportingFederal Register NoticesExplanation of Proposed Changes 28 August 2014

  2. NTD Modernization • Development of “NTD 2.0” System started in September, 2012 • Pilot testing was May 19th thru June 6th, 2014 • Motivation for new system: • Reduce maintenance costs • Improve data collection process • NTD 2.0 Go-Live Schedule: • Monthly reporting on October 8, 2014 • Annual reporting in December, 2014 • Safety & Security, mid-2015

  3. NTD 2.0 Will Use Individual IDs • Individual IDs will have specific access rights • Replaces current CEO/Contact/Editor/Viewer IDs • 1 unique ID for each individual • Every agency designates a “user manager” (UM) • UM then assigns user accounts for that agency • Designate UM in TEAM profile and attach appointment letter • No TEAM access? Then email appointment letter to NTD manager (keith.gates@dot.gov) with UM contact info 3

  4. NTD Changes for FY 2014 • The 8/18 Federal Register notice proposes revisions to National Transit Database (NTD) rules • FTA is seeking public comment before implementing these changes • Changes to the 2014 NTD Reporting Manual • Changes to urbanized area transit providers • Some revisions respond to MAP-21 provisions

  5. General NTD Changes for FY 2014 A.ADA paratransitservices clarification B.Reporting of contractual relationships clarification C.bus rapid transit (BRT) mode definition update D. Guidance for reporting service on HOT lanes E. Updates to the definition of commuter service and rules for allocation of service across multiple urbanized areas F. Proposed elimination of consolidated reporting and expansion of smallsystems waiver eligibility G. Requirement for consistent use of transit system names and types H. New policy allowing delegation of CEO certification responsibility I. Elimination of B-60/B-70 forms and rail peak period data collection J. Updated guidance for sampling of passenger miles K. Future expansion of capital asset reporting required by MAP-21

  6. A.Reporting ADA Service (1) Demand response services that are not intended to fulfill the ADA paratransit requirements of fixed route service should not be reported as attributable to ADA requirements. (2) If you do operate demand response services to fulfill ADA paratransitrequirements, report all trips for eligible passengers as ADA trips, except: (i) Trips sponsored by a third party (Medicare); (ii) Trips whose origin or destination are outside the ADA service area; (iii) Trips taken during times when the fixed-route system is not operating. (3) In general, if X% of your DR trips are ADA trips, then report X% of your DR operating expenses as ADA operating expenses.

  7. B.Contractual Relationships • The buyer must be responsible for the fully-allocated cost of providing Purchased Transportation (PT) service • Allows for seller to retain fares as part of the payment • PT service must be operated in the name of the buyer • Customers see buyer’s name on vehicles • The seller must operate and manage PT service • 3rd party management, PEO services are not “PT”

  8. C. Bus Rapid Transit (BRT) • Restates Definition of BRT from SGR circular • Comments solicited in Federal Register on March 3, 2014 • Comment on aligning NTD mode with the SGR Program Definition • Over 50% of the route operates in a separated right-of-way dedicated for transit use during peak periods • Short headways (“emulate the service provided by rail”) • Weekdays for either: (1) at least 14 hours a day with headways of <15 minutes; or, (2) headways <10 minutes or during peak periods and <20 minutes at all other times • Weekend service for at least 10 hours a day with headways that are < 30 minutes • Also: • Active signal priority • Substantial passenger stations • Separate brand identity

  9. D.Service on HOT lanes • FTA will no longer consider transit service operated on any HOT lane to be the same as transit service operated on an HOV lane, for purposes of the formula apportionment for the High-Intensity Motorbus Tier • No longer any “grandfathering”

  10. E. Definition of Commuter Service • Clarifies distinction between commuter and intercity transportation treatment in NTD • Commuter service is local passenger transportation, with more than half of passengers making a same-day return trip • For formula grant apportionments commuter service is allocated to the UZA that is primarily served • For formula grant apportionments 22.27% of rural Intercitynon-bus miles are attributed to UZAs • Intercity bus service is not counted for formula grants • Service provided by Amtrak is defined as Intercity rail • Grandfathers existing systems in the NTD

  11. F.Consolidated Reporting • There are 6 consolidated reporters in the NTD • Large systems reporting for smaller neighbors • Small systems waivers allow reduced reporting • They were not available before 2011 • They also eliminate the requirement to report passenger miles • They also eliminate the monthly reporting requirement • Reports for each transit system will now have to be filed under a unique NTD ID number • Simplifies NTD data analysis • Less work for everyone

  12. G.Consistent Use of Names/Types • Name and organization type on the B–10 form must now match the total revenues and total expenses reported on the F forms • Responsible certifying official designated on the B–20 form must be a direct employee of the reporting organization • Independent auditor statements must be done on the basis of the reporting organization.

  13. H. Delegation of CEO Authority • Historically, the reporter’s CEO must submit the NTD report and certify its accuracy. • CEO may now delegate this certification to an employee who will act in the CEO’s name for this purpose • Delegation will remain valid as long as both the CEO and the designated official continue to hold their respective positions • Does not change the CEO’s overall responsibility for the accuracy of data submitted in the report

  14. I. Eliminating Reporting Requirements • FTA has determined that this data is not needed • Eliminate the requirement for rail systems to report morning and evening peak period service data • Will align the service data reporting requirements for rail modes with other modes • eliminate B–60 and B–70 forms • Identify funds passed from one public entity to another public entity

  15. J. Passenger Mile Sampling Guidance • Withdraw outdated circulars on sampling to collect passenger mile data • UMTA C2710.1A • UMTA C2710.2A • UMTA C2710.4A • Circulars have been replaced by the NTD Sampling Manual • Has been in use as optional guidance since 2011 • OK to use old circulars for sampling underway • http://www.ntdprogram.gov/ntdprogram/sampling.htm

  16. K. Asset Inventory Reporting • Solicits comments on plan to implement MAP-21 requirement to collect asset inventory data • High-level data on fixed assets to augment the current collection of vehicle data • Asset list filled out once and then updated annually • FY 2014 reporting (starts in October 2014) will not be affected • FY 2015 reporting will be an optional pilot year • FY 2016 reporting will be mandatory • http://www.ntdprogram.gov/ntdprogram/assetInventory.htm

  17. Facilities Data • Administrative and Maintenance Facilities Inventory (A-10) • Passenger and Parking Facility Inventory (A-20) • Fill out fields to collect: • facility type • primary mode served • facility’s name, street address, square footage • year built or substantially reconstructed • estimated cost and year of estimated cost • number of parking spaces (parking facilities only) • Share (percent) of responsibility to fund replacement • Where a major facility’s age varies by section, report on separate line for each section 17

  18. Guideway Data • Rail Fixed Guideway Inventory for each mode • Linear guideway assets • Power and signal equipment • Track Inventory for each mode • Length of linear track assets (tangent or curved track) • Total number of track special elements (crossovers, unions…) • For both, report: • Data as network totals by operating agreement (DO or PT) • Date of construction or major rehabilitation (in decade ranges) • Share (percent) of responsibility to fund replacement • Expected service life for each asset (default or based on agency experience) 18

  19. NTD Safety Changes for FY 2014 • The 8/21 Federal Register notice proposes revisions to National Transit Database (NTD) Safety & Security event reporting • FTA is seeking public comment before implementing these changes • Changes to the 2014 NTD Reporting Manual • Some revisions respond to MAP-21 provisions • Changes to urbanized area transit providers

  20. NTD Safety Changes for FY 2014 • Reportable Event (Clarification) • Change in Location Criteria • Evacuations • Derailments • Collisions at Grade Crossings • Collision with an Individual on a Rail Right-of-Way • Rail to Rail Collisions • Addition of “Tow-Away” • Revision to Non-Rail “Other Motor Vehicle” and “Collision Event” • Revision to Non-Rail “Type of Fire” Categories • Collect New Data on Geographic Location of Events

  21. 1. Reportable “Events” • Incidents reported to the NTD and the SSO will now be called ‘‘events.’’ • Other uses of the term ‘‘incident’’ are defined as an occurrence that is less severe than an accident • ‘‘Event’’ in this case is intended to include planned and unplanned events that are required to be reported • Better alignment with nomenclature used in other transportation modes • Clarity during data analysis conducted to identify safety trends 21

  22. 8. Addition of ‘‘Tow-Away’’ • Adds a ‘‘tow-away’’ checkbox to the S&S–40 reporting form • Replaces property damage threshold for collisions • Makes vehicle event reporting compatible with the threshold used by the Federal Motor Carrier Safety Administration (FMCSA) 22

  23. 2. Change in Location Criteria • Current rule is to report events that are ‘‘related to or affect revenue service.’’ • Change to ‘‘an event occurring on transit right-of-way, in a transit revenue facility, in a transit maintenance facility, or involving a transit revenue vehicle, excluding occupational safety events occurring in administrative buildings.’’ • Consistent with data reported to the SSO program • NTD will no longer collect events at bus stops that are not on real property owned or controlled by the agency • Unless the event involves a transit revenue vehicle or riders getting on or off a transit revenue vehicle 23

  24. 11. Collect New Data on GeographicLocation of Events Adds fields for latitude and longitude of events • Improves analysis capability 24

  25. 3. Evacuations • Revise the definition of “evacuation” to include • patron/passenger self-evacuations and • evacuations for service or maintenance related issues when passengers are evacuated to potentially hazardous situations • Rail right-of-way • Highway shoulder lane • These events would require a major event report • Consistent with data reported to the SSO program 25

  26. 4. Derailments • Expand the mandatory reporting of derailments to include yard derailments • Yard derailments would be reportable regardless of injuries, fatalities, or property damage 26

  27. 7.Rail-Rail Collisions • A major event report will be required for all collisions between rail vehicles • Extends existing SSO threshold to the NTD • Agencies are already required to report and investigate these events to SSO program • Does not include normal connection of vehicles 27

  28. Other Rail Collisions • 5. Collisions at Grade Crossings • All collisions at grade crossings are reportable to the NTD • Already report and investigate these events for the SSO Program • 6. Collision with an Individual on a Rail Right-of-Way • All rail collisions with individuals are reportable • Regardless of injuries or fatalities • Even if they do not result in an injury • As collected in the SSO program 28

  29. 9. Revision to Non-Rail ‘‘Other MotorVehicle’’ and ‘‘Collision Event’’ Screens Adds selections for ‘‘other motor vehicle type’’ to form for reporting collisions with a motor vehicle • Automobile, moped, scooter, motorcycle, charter bus, school bus • Collision with another agency’s transit vehicle • Collision with one of your own transit vehicles • Improves ability to support trend analysis of non-rail vehicle collisions 29

  30. 10. Revision to Non-Rail ‘‘Type of Fire’’Categories on Fire Event Detail Screens • Adds selections for ‘‘type of fire’’ to the non-rail fire event detail screen • Provides better national level information for vehicle fire prevention and mitigation 30

  31. Comment Submission • Must be received by 9/18 or 10/20 (Safety) • Include Docket Number FTA-2014-0006 or Docket Number FTA-2014-0009 (Safety) • Email: http://www.regulations.gov. • Fax:(202) 493-2251. • Mail/Courier (submit 2 copies):1200 New Jersey Avenue SE, W12-140, Washington, DC 20590-0001

  32. Also… • All comments received will be posted to http://www.regulations.gov • DOT’s complete Privacy Act Statement http://DocketsInfo.dot.gov. • Contact is: Keith Gates, (202) 366–1794, or keith.gates@dot.gov

More Related